66kV Step-Up Transformers for Wind & Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers
A 66kV step-up transformer connects renewable generation to a higher-voltage collection or transmission network. For wind and solar EPC projects, incorrect transformer specifications can cause protection conflicts, excessive losses, and commissioning delays.
In Ucrania, buyers must first verify the approved grid connection voltage. Not every renewable project uses 66kV; some require 35kV, 110kV, or other utility-specified levels.
This guide covers ten essential specifications, practical sizing, hidden costs, and a 66kV transformer RFQ checklist.
1. Confirm the Grid Connection Before Selecting 66kV
Wind turbines and solar inverters typically connect through lower-voltage collection systems before power reaches the grid.

A possible arrangement is:
Wind Turbines / Solar Inverters → 33kV Collection System → 33/66kV Step-Up Transformer → Grid Substation
The actual voltage ratio must follow the approved Single-Line Diagram (SLD).
For Ukrainian renewable projects, confirm the point of interconnection, voltage range, reactive-power obligations, and utility protection requirements before requesting a quotation.
2. Ten Technical Specifications Buyers Must Provide
| RFQ Parameter | Example / Requirement |
|---|---|
| Capacidad nominal | 20 / 40 / 63MVA |
| Voltage Ratio | 33/66kV, if approved |
| Frecuencia | 50Hz |
| Tipo de transformador | Oil-immersed, outdoor |
| Cooling | ONAN / ONAF |
| Vector Group | As specified by grid study |
| Impedancia de cortocircuito | Project-specific |
| Tap Changer | OLTC / Off-circuit |
| Insulation Level | IEC 60076 / utility specification |
| Loss Guarantees | No-load and load losses |
Values are illustrative, not confirmed DHDL model ratings.
DHDL’s published 66kV high-voltage transformer range supports customized capacity, voltage ratio, cooling, impedance, insulation, and accessories.
3. How to Estimate Transformer Capacity
Consider a proposed 30MW solar farm in Ukraine operating at 0.95 power factor.
A simplified apparent-power calculation is:
S = P / PF = 30 / 0.95 ≈ 31.6MVA
A 40MVA transformer may be evaluated as a preliminary option.
However, final selection must consider inverter capability, reactive-power requirements, export limits, temperature, cooling, and future expansion.
For wind farms, use the actual turbine generation profile and simultaneous output rather than simply adding nameplate capacities.
4. Real Equipment Reference and Ukraine Project Scenario
DHDL publishes a 66kV high-voltage oil-immersed power transformer for substations, power transmission, and renewable energy grid connection. Its product information identifies customizable capacity and ONAN/ONAF cooling options.
For a proposed Ukrainian wind farm using a 33kV collection network and an approved 66kV connection, the EPC contractor should provide:
- Approved SLD and grid connection agreement
- Maximum export capacity and generation profile
- Voltage ratio, vector group, and grounding requirements
- Harmonic and reactive-power studies
- Short-circuit levels and protection settings
- Site temperature and transport restrictions
Project clarification: This is an illustrative Ukrainian engineering scenario, not a claimed DHDL wind-farm delivery.
5. Ukraine-Specific Installation Risks
Ukraine projects may require additional review of:
- Minimum winter ambient temperature
- Transformer oil and accessory temperature suitability
- Snow, wind, and outdoor installation conditions
- Voltage regulation and grid-code compliance
- Remote monitoring and protection interfaces
- Transport access and unloading capacity
For Uzbekistan and Russia, temperature extremes may also influence transformer design.
For Etiopía, altitude and cooling performance deserve attention. Projects in Vietnam, Thailand, Myanmar, and Nigeria may require site-specific humidity, corrosion, heat, or logistics assessments.
6. Hidden Costs in 66kV Transformer Quotations
Two suppliers may quote the same MVA rating while excluding different items.
Verify whether the price includes:
- On-load tap changer and control cabinet
- Bushings, surge arresters, and protection accessories
- Cooling fans and monitoring equipment
- Guaranteed losses and testing
- Factory Acceptance Testing (FAT) witness arrangements
- Export packing, transport, and site support
Buyer tip: Compare guaranteed no-load and load losses, not only purchase price. For example, an additional 5kW of continuous no-load loss represents approximately 43,800kWh annually.
7. 66kV Step-Up Transformer RFQ Checklist
| Required Information | Buyer Input |
|---|---|
| Country / Project | Ukraine / _____ |
| Solicitud | Wind / Solar |
| Plant Capacity | _____ MW |
| Export Capacity / PF | _____ MW / _____ |
| Voltage Ratio / Frequency | _____ kV / 50Hz |
| Transformer Capacity | _____ MVA |
| Vector Group / Grounding | _____ |
| Impedance / Tap Range | _____ |
| Cooling / Loss Limits | _____ |
| Minimum Temperature / Altitude | _____ |
| IEC / Utility Standards | _____ |
| Quantity / Delivery / Incoterms | _____ |
Attach: SLD, grid connection requirements, generation profile, technical specification, protection study, site layout, transport limits, and inspection requirements.
8. Request a 66kV Transformer Quotation from DHDL
DHDL offers customized high-voltage oil-immersed power transformers for substations and renewable energy applications.
For projects in Ukraine, Ethiopia, Vietnam, Thailand, Myanmar, Uzbekistan, Russia, and Nigeria, submit the approved voltage ratio, capacity, grid requirements, drawings, and delivery destination for technical review.
Contact DHDL for a Technical Quotation
Preguntas frecuentes
Is 66kV suitable for every wind or solar farm in Ukraine?
No. The voltage must match the approved utility connection and project design.
How do I calculate step-up transformer capacity?
Start with generation MW and required power factor, then assess reactive power, operating duty, cooling, and grid requirements.
Is ONAN or ONAF better for renewable projects?
The choice depends on continuous loading, peak generation, ambient conditions, redundancy, and lifecycle costs.
What documents are essential before ordering?
Provide the SLD, grid connection agreement, technical datasheet, protection requirements, site conditions, and FAT documentation requirements.