{"id":39023,"date":"2026-11-25T05:30:41","date_gmt":"2026-11-25T05:30:41","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=39023"},"modified":"2026-11-25T05:31:08","modified_gmt":"2026-11-25T05:31:08","slug":"compare-transformer-switchgear-quotes-epc-project","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/","title":{"rendered":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers"},"content":{"rendered":"<p class=\"wp-block-wd-paragraph wd-e0d55d1b\">The <strong><em><a href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/how-to-select-the-right-transformer-for-a-solar-farm-dinghong-transformer\/\" data-type=\"post\" data-id=\"37857\">lowest transformer<\/a><\/em><\/strong> and switchgear quotation does not necessarily offer the lowest project cost. Differences in electrical ratings, protection components, guaranteed losses, testing, and delivery terms can significantly affect the final investment.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c0994d13\">For EPC contractors working on substations, industrial facilities, and distribution network reconstruction in Ukraine, a structured technical bid evaluation is essential before awarding a contract.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7dfa9bee\">This guide helps buyers compare electrical equipment quotations, identify hidden costs, and prepare a technically complete RFQ.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#1_Compare_Quotations_Against_the_Same_Technical_Specification\" >1. Compare Quotations Against the Same Technical Specification<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#2_Verify_Transformer_and_Switchgear_Compatibility\" >2. Verify Transformer and Switchgear Compatibility<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#3_Identify_Hidden_Differences_Between_Supplier_Quotes\" >3. Identify Hidden Differences Between Supplier Quotes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#4_Calculate_Transformer_Lifecycle_Costs\" >4. Calculate Transformer Lifecycle Costs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#5_Real_Project_Reference_Ukraine_Power_Network_Reconstruction\" >5. Real Project Reference: Ukraine Power Network Reconstruction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#6_Compare_Testing_Documentation_and_Warranty\" >6. Compare Testing, Documentation and Warranty<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#7_Evaluate_Country-Specific_Delivery_Risks\" >7. Evaluate Country-Specific Delivery Risks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#8_Transformer_and_Switchgear_RFQ_Checklist\" >8. Transformer and Switchgear RFQ Checklist<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#Request_a_Coordinated_Electrical_Equipment_Quotation\" >Request a Coordinated Electrical Equipment Quotation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#How_should_EPC_buyers_compare_transformer_quotations\" >How should EPC buyers compare transformer quotations?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#Can_transformers_and_switchgear_be_purchased_together\" >Can transformers and switchgear be purchased together?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#What_is_a_technical_deviation_list\" >What is a technical deviation list?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/#Is_the_cheapest_equipment_quotation_always_the_best\" >Is the cheapest equipment quotation always the best?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-095bc13f\"><span class=\"ez-toc-section\" id=\"1_Compare_Quotations_Against_the_Same_Technical_Specification\"><\/span>1. Compare Quotations Against the Same Technical Specification<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2c759892\">Every supplier should receive the same Bill of Quantities (BOQ), Single-Line Diagram (SLD), and technical specification.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-faf4652d\">Ukraine&#8217;s distribution projects may involve 10kV, 20kV, or 35kV networks. Equipment selection must follow the approved utility connection requirements.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Comparison Item<\/th><th>Transformer Example<\/th><th>MV Switchgear Example<\/th><\/tr><tr><td>Voltage<\/td><td>10\/0.4kV<\/td><td>12kV rated<\/td><\/tr><tr><td>Capacity \/ Current<\/td><td>2500kVA<\/td><td>630A<\/td><\/tr><tr><td>Frequency<\/td><td>50Hz<\/td><td>50Hz<\/td><\/tr><tr><td>Configuration<\/td><td>Dyn11<\/td><td>Metal-clad AIS<\/td><\/tr><tr><td>Impedance \/ Fault Rating<\/td><td>6%<\/td><td>25kA<\/td><\/tr><tr><td>Cooling \/ Withstand<\/td><td>ONAN<\/td><td>25kA \/ 3s<\/td><\/tr><tr><td>Standard<\/td><td>IEC 60076<\/td><td>IEC 62271-200<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4c760b51\"><em>Illustrative specifications, subject to engineering verification.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-01412634\"><span class=\"ez-toc-section\" id=\"2_Verify_Transformer_and_Switchgear_Compatibility\"><\/span>2. Verify Transformer and Switchgear Compatibility<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c9c5bfa8\">Equipment purchased from different suppliers must operate as one distribution system.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-be6c3857\">Check the following interfaces:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer rated current and switchgear feeder capacity<\/li>\n\n\n\n<li>Short-circuit levels and circuit-breaker ratings<\/li>\n\n\n\n<li>Transformer vector group and grounding arrangement<\/li>\n\n\n\n<li>Protection relay settings and CT\/VT ratios<\/li>\n\n\n\n<li>Cable termination, busbar connections, and installation dimensions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-89a63671\">For example, a 2500kVA transformer operating at 10kV has a rated primary current of approximately 144A.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-5b5a1cac\"><img decoding=\"async\" width=\"1670\" height=\"942\" class=\"wp-image-39025 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project.png 1670w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-400x226.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-1300x733.png 1300w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-768x433.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-1536x866.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-18x10.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-430x243.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-700x395.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/compare-transformer-switchgear-quotes-epc-project-150x85.png 150w\" data-sizes=\"(max-width: 1670px) 100vw, 1670px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1670px; --smush-placeholder-aspect-ratio: 1670\/942;\" \/><\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7a608da4\">A 630A switchgear feeder exceeds this continuous current requirement, but short-circuit performance, inrush current, protection coordination, and installation conditions still require verification.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-e2214bff\"><span class=\"ez-toc-section\" id=\"3_Identify_Hidden_Differences_Between_Supplier_Quotes\"><\/span>3. Identify Hidden Differences Between Supplier Quotes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-32ec0c25\">Two quotations can have similar descriptions but substantially different supply scopes.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Comparison Factor<\/th><th>Supplier A<\/th><th>Supplier B<\/th><\/tr><tr><td>Equipment Price<\/td><td>$100,000<\/td><td>$108,000<\/td><\/tr><tr><td>Protection Accessories<\/td><td>+$5,000<\/td><td>Included<\/td><\/tr><tr><td>FAT and Documentation<\/td><td>+$3,000<\/td><td>Included<\/td><\/tr><tr><td>Export Packing<\/td><td>+$2,000<\/td><td>Included<\/td><\/tr><tr><td>Freight to Agreed Destination<\/td><td>+$6,000<\/td><td>+$6,000<\/td><\/tr><tr><td>Comparable Total<\/td><td>$116,000<\/td><td>$114,000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4edee49e\"><em>Illustrative prices only, not actual DHDL quotations.<\/em><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-34e91acf\">The initially cheaper quotation becomes more expensive after scope adjustments.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b9304a4a\">Request an itemized commercial proposal and technical deviation list before making a purchasing decision.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-b5cab329\"><span class=\"ez-toc-section\" id=\"4_Calculate_Transformer_Lifecycle_Costs\"><\/span>4. Calculate Transformer Lifecycle Costs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c225e70a\">Transformer losses represent a long-term operating expense that can exceed the initial purchase-price difference.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-77730d2a\">Suppose one transformer has 1.5kW higher no-load losses.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fc8399a2\">Assuming continuous energization:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Additional annual energy loss: 1.5 \u00d7 8,760 = 13,140kWh<\/li>\n\n\n\n<li>Assumed electricity cost: $0.12\/kWh<\/li>\n\n\n\n<li>Additional annual cost: $1,576.80<\/li>\n\n\n\n<li>Additional cost over 20 years: $31,536<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-78c1899e\">This simplified example excludes load losses, tariff changes, and discounting.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-94ce45ef\">EPC buyers should compare guaranteed no-load losses, load losses, winding materials, cooling requirements, and maintenance costs.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-028b7428\"><span class=\"ez-toc-section\" id=\"5_Real_Project_Reference_Ukraine_Power_Network_Reconstruction\"><\/span>5. Real Project Reference: <em><a href=\"https:\/\/dinghongtransformer.com\/vi\/project\/ukraine-distribution-network-recovery-and-industrial-power-reconstruction-project\/\" data-type=\"page\" data-id=\"37359\">Ukraine Power Network Reconstruction<\/a><\/em><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-65a71ee8\">DHDL reports supplying 36 transformers for a distribution recovery and industrial power reconstruction project covering Lviv, Ternopil, and other regions of Ukraine.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-956ba650\">The published supply scope included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Four S-16000\/110\/35\/10 main transformers<\/li>\n\n\n\n<li>Thirty distribution transformers<\/li>\n\n\n\n<li>Two TMG-2500\/10\/0.8kV special industrial transformers<\/li>\n\n\n\n<li>Delivery terms: CIF Gda\u0144sk<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-05bed0d1\">The project illustrates why equipment schedules, voltage interfaces, batch consistency, and logistics must be evaluated together.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-760c26a5\">This is a transformer supply reference, not a confirmed combined switchgear procurement case.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-d2c4e171\"><span class=\"ez-toc-section\" id=\"6_Compare_Testing_Documentation_and_Warranty\"><\/span>6. Compare Testing, Documentation and Warranty<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-473dd303\">Before approving a transformer or switchgear supplier, verify:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Applicable type-test reports and routine-test procedures<\/li>\n\n\n\n<li>Factory Acceptance Testing (FAT) arrangements<\/li>\n\n\n\n<li>Technical compliance and deviation matrices<\/li>\n\n\n\n<li>Approved drawings and operation manuals<\/li>\n\n\n\n<li>Warranty duration and starting date<\/li>\n\n\n\n<li>Spare parts and commissioning support<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a7c9f798\">For Ukraine EPC projects, confirm utility acceptance requirements and documentation language before production.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b48e1338\">An ISO certificate alone does not demonstrate product-specific compliance.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-277f6f64\"><span class=\"ez-toc-section\" id=\"7_Evaluate_Country-Specific_Delivery_Risks\"><\/span>7. Evaluate Country-Specific Delivery Risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Market<\/th><th>Procurement Priority<\/th><\/tr><tr><td>Ukraine<\/td><td>Winter conditions, utility acceptance, delivery routes<\/td><\/tr><tr><td>Ethiopia<\/td><td>Altitude, dust, cooling performance<\/td><\/tr><tr><td>Vietnam<\/td><td>Humidity and corrosion protection<\/td><\/tr><tr><td>Thailand<\/td><td>Heat performance and ventilation<\/td><\/tr><tr><td>Myanmar<\/td><td>Site access and maintenance support<\/td><\/tr><tr><td>Uzbekistan<\/td><td>Temperature extremes and transport<\/td><\/tr><tr><td>Russia<\/td><td>Cold-weather design and applicable trade requirements<\/td><\/tr><tr><td>Nigeria<\/td><td>Heat, protection coordination and spare parts<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bdb8417b\">Confirm actual site conditions, customs requirements, import restrictions, and agreed delivery responsibilities rather than relying on country-level assumptions.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-87527097\"><span class=\"ez-toc-section\" id=\"8_Transformer_and_Switchgear_RFQ_Checklist\"><\/span>8. Transformer and <em><a href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/charging-energy-storage\/switchgear-rfq-checklist\/\" data-type=\"post\" data-id=\"38955\">Switchgear RFQ Checklist<\/a><\/em><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-28d675e4\">Send every shortlisted supplier identical project information.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>RFQ Item<\/th><th>Buyer Input<\/th><\/tr><tr><td>Project \/ Destination<\/td><td>Ukraine \/ _____<\/td><\/tr><tr><td>Transformer Capacity<\/td><td>_____ kVA\/MVA<\/td><\/tr><tr><td>Voltage Ratio \/ Frequency<\/td><td>_____ kV \/ _____ Hz<\/td><\/tr><tr><td>Vector Group \/ Impedance<\/td><td>_____<\/td><\/tr><tr><td>Switchgear Type \/ Current<\/td><td>AIS \/ GIS \/ _____ A<\/td><\/tr><tr><td>Short-Circuit Rating<\/td><td>_____ kA \/ _____ s<\/td><\/tr><tr><td>Protection \/ CT \/ VT<\/td><td>_____<\/td><\/tr><tr><td>Guaranteed Losses<\/td><td>_____ W<\/td><\/tr><tr><td>Standards \/ FAT<\/td><td>_____<\/td><\/tr><tr><td>Site Conditions<\/td><td>_____<\/td><\/tr><tr><td>Quantity \/ Delivery Date<\/td><td>_____<\/td><\/tr><tr><td>Incoterms \/ Warranty<\/td><td>_____<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3f19325c\"><strong>Required attachments:<\/strong> BOQ, SLD, technical specifications, protection study, equipment layout, cable schedule, and inspection requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-8388d5d7\"><span class=\"ez-toc-section\" id=\"Request_a_Coordinated_Electrical_Equipment_Quotation\"><\/span>Request a Coordinated Electrical Equipment Quotation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2e67f2ba\"><strong><em><a href=\"https:\/\/dinghongtransformer.com\/vi\/\" data-type=\"link\" data-id=\"https:\/\/dinghongtransformer.com\/\">DHDL <\/a><\/em><\/strong>provides <a href=\"https:\/\/dinghongtransformer.com\/vi\/product\/6-38-5kv-oil-immersed-distribution-transformer\/\" data-type=\"product\" data-id=\"37408\"><strong><em>oil-immersed transformers<\/em><\/strong><\/a>, <strong><em><a href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/what-is-a-dry-type-transformer-and-where-is-it-used\/\" data-type=\"post\" data-id=\"38324\">dry-type transformers<\/a><\/em><\/strong>, power transformers, switchgear, and integrated power distribution solutions.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-086fef33\">For EPC projects in Ukraine, Ethiopia, Vietnam, Thailand, Myanmar, Uzbekistan, Russia, and Nigeria, submit your complete equipment schedule for technical review and quotation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-243969f7\"><strong><em><a href=\"https:\/\/dinghongtransformer.com\/vi\/contact-us\/\">Contact DHDL for a Transformer and Switchgear Quote<\/a><\/em><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-24f0f9cf\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-10410ef9\"><span class=\"ez-toc-section\" id=\"How_should_EPC_buyers_compare_transformer_quotations\"><\/span>How should EPC buyers compare transformer quotations?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d1a69b18\">Compare electrical compliance, guaranteed losses, accessories, testing, delivery terms, and lifecycle costs.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-d079e232\"><span class=\"ez-toc-section\" id=\"Can_transformers_and_switchgear_be_purchased_together\"><\/span>Can transformers and switchgear be purchased together?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9c1b943a\">Yes, subject to equipment availability and project-specific interface verification.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-5b002b3a\"><span class=\"ez-toc-section\" id=\"What_is_a_technical_deviation_list\"><\/span>What is a technical deviation list?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ef53b6f5\">It identifies differences between the tender requirements and the supplier&#8217;s proposed equipment.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-9f43ef7d\"><span class=\"ez-toc-section\" id=\"Is_the_cheapest_equipment_quotation_always_the_best\"><\/span>Is the cheapest equipment quotation always the best?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aae8824a\">No. Excluded components, higher losses, inspection costs, and logistics can increase total project expenditure.<\/p>","protected":false},"excerpt":{"rendered":"<p>Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.<\/p>","protected":false},"author":1,"featured_media":39024,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,102,101,98,73],"tags":[],"class_list":["post-39023","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-charging-energy-storage","category-grid-distribution","category-industrial-power-projects","category-industry-standards"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/\" \/>\n<meta property=\"og:locale\" content=\"vi_VN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-25T05:30:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-25T05:31:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1671\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 ph\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers\",\"datePublished\":\"2026-11-25T05:30:41+00:00\",\"dateModified\":\"2026-11-25T05:31:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/\"},\"wordCount\":820,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/transformer-and-switchgear-quotation-comparison.png\",\"articleSection\":[\"Blog\",\"Charging &amp; Energy Storage\",\"Grid &amp; Distribution\",\"Industrial Power Projects\",\"Industry Standards\"],\"inLanguage\":\"vi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/\",\"name\":\"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/transformer-and-switchgear-quotation-comparison.png\",\"datePublished\":\"2026-11-25T05:30:41+00:00\",\"dateModified\":\"2026-11-25T05:31:08+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#breadcrumb\"},\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/transformer-and-switchgear-quotation-comparison.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/transformer-and-switchgear-quotation-comparison.png\",\"width\":1671,\"height\":941,\"caption\":\"transformer and switchgear quotation comparison\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/compare-transformer-switchgear-quotes-epc-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"vi\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/vi\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer","description":"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/","og_locale":"vi_VN","og_type":"article","og_title":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer","og_description":"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.","og_url":"https:\/\/dinghongtransformer.com\/vi\/blog\/compare-transformer-switchgear-quotes-epc-project\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-11-25T05:30:41+00:00","article_modified_time":"2026-11-25T05:31:08+00:00","og_image":[{"width":1671,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi":"DHDL","\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc":"5 ph\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers","datePublished":"2026-11-25T05:30:41+00:00","dateModified":"2026-11-25T05:31:08+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/"},"wordCount":820,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png","articleSection":["Blog","Charging &amp; Energy Storage","Grid &amp; Distribution","Industrial Power Projects","Industry Standards"],"inLanguage":"vi"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/","url":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/","name":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png","datePublished":"2026-11-25T05:30:41+00:00","dateModified":"2026-11-25T05:31:08+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"Compare transformer and switchgear quotes for Ukraine EPC projects. Check technical ratings, hidden costs, energy losses, FAT and RFQ requirements.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#breadcrumb"},"inLanguage":"vi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/"]}]},{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/transformer-and-switchgear-quotation-comparison.png","width":1671,"height":941,"caption":"transformer and switchgear quotation comparison"},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/compare-transformer-switchgear-quotes-epc-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"How to Compare Transformer and Switchgear Quotes: 8 Checks for Ukraine EPC Buyers"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"C\u00f4ng ty Dinghongtransformer","description":"DHDL s\u1ea3n xu\u1ea5t c\u00e1c lo\u1ea1i m\u00e1y bi\u1ebfn \u00e1p, t\u1ee7 ph\u00e2n ph\u1ed1i \u0111i\u1ec7n \u00e1p cao v\u00e0 th\u1ea5p, tr\u1ea1m bi\u1ebfn \u00e1p ti\u1ec1n ch\u1ebf, t\u1ee7 l\u01b0u tr\u1eef n\u0103ng l\u01b0\u1ee3ng v\u00e0 thi\u1ebft b\u1ecb s\u1ea1c \u0111i\u1ec7n cho c\u00e1c d\u1ef1 \u00e1n n\u0103ng l\u01b0\u1ee3ng c\u00f4ng \u00edch, c\u00f4ng nghi\u1ec7p v\u00e0 n\u0103ng l\u01b0\u1ee3ng m\u1edbi tr\u00ean to\u00e0n th\u1ebf gi\u1edbi.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"vi"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/vi\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/posts\/39023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/comments?post=39023"}],"version-history":[{"count":1,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/posts\/39023\/revisions"}],"predecessor-version":[{"id":39026,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/posts\/39023\/revisions\/39026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/media\/39024"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/media?parent=39023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/categories?post=39023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/vi\/wp-json\/wp\/v2\/tags?post=39023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}