{"id":39004,"date":"2026-11-12T03:34:54","date_gmt":"2026-11-12T03:34:54","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=39004"},"modified":"2026-11-12T03:34:57","modified_gmt":"2026-11-12T03:34:57","slug":"switchgear-type-test-vs-routine-test-ukraine","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/","title":{"rendered":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers"},"content":{"rendered":"<p class=\"wp-block-wd-paragraph wd-0cb6cd8f\">For Ukraine&#8217;s power distribution upgrades, a switchgear quotation is only as reliable as its supporting test documents.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5dfde4d6\"><strong>Switchgear type test reports<\/strong> demonstrate that a representative design meets specified performance requirements. <strong>Routine test reports<\/strong> verify individual manufactured assemblies before delivery.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c07befdb\">EPC contractors purchasing 10kV or 20kV <strong><em><a href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/kyn28-metal-clad-withdrawable-switchgear-buyers-guide\/\" data-type=\"post\" data-id=\"37965\">switchgear<\/a><\/em><\/strong> should verify both. A generic IEC certificate or an unrelated factory report may not satisfy project acceptance requirements.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#1_Type_Tests_vs_Routine_Tests_Whats_the_Difference\" >1. Type Tests vs Routine Tests: What&#8217;s the Difference?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#2_Seven_Checks_Before_Accepting_Test_Reports\" >2. Seven Checks Before Accepting Test Reports<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_1_Match_the_Tested_Model\" >Check 1: Match the Tested Model<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_2_Verify_Electrical_Ratings\" >Check 2: Verify Electrical Ratings<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_3_Review_Design_Qualification_Tests\" >Check 3: Review Design Qualification Tests<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_4_Verify_Routine-Test_Records\" >Check 4: Verify Routine-Test Records<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_5_Check_Report_Authenticity\" >Check 5: Check Report Authenticity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_6_Confirm_FAT_Witness_Requirements\" >Check 6: Confirm FAT Witness Requirements<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Check_7_Review_the_Complete_Documentation_Package\" >Check 7: Review the Complete Documentation Package<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#3_Real_Ukraine_Project_Reference_DHDL_Distribution_Equipment_Supply\" >3. Real Ukraine Project Reference: DHDL Distribution Equipment Supply<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#4_Ukraine-Specific_Procurement_Risks\" >4. Ukraine-Specific Procurement Risks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#5_Hidden_Costs_Behind_Incomplete_Test_Reports\" >5. Hidden Costs Behind Incomplete Test Reports<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#6_Switchgear_Test_Documentation_RFQ_Checklist\" >6. Switchgear Test Documentation RFQ Checklist<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#7_Request_Switchgear_Documentation_from_DHDL\" >7. Request Switchgear Documentation from DHDL<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Are_type_tests_required_for_every_switchgear_panel\" >Are type tests required for every switchgear panel?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Can_one_type-test_report_cover_different_switchgear_ratings\" >Can one type-test report cover different switchgear ratings?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#Does_IEC_62271_compliance_guarantee_Ukraine_utility_approval\" >Does IEC 62271 compliance guarantee Ukraine utility approval?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#What_should_an_EPC_buyer_request_before_FAT\" >What should an EPC buyer request before FAT?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-4f34e777\"><span class=\"ez-toc-section\" id=\"1_Type_Tests_vs_Routine_Tests_Whats_the_Difference\"><\/span>1. Type Tests vs Routine Tests: What&#8217;s the Difference?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Item<\/th><th>Type Test<\/th><th>Routine Test<\/th><\/tr><tr><td>Purpose<\/td><td>Validate equipment design<\/td><td>Verify manufactured assembly<\/td><\/tr><tr><td>Test Sample<\/td><td>Representative configuration<\/td><td>Each applicable production assembly<\/td><\/tr><tr><td>Timing<\/td><td>Design qualification<\/td><td>Manufacturing completion<\/td><\/tr><tr><td>Evidence<\/td><td>Type-test report<\/td><td>Unit-specific routine-test report<\/td><\/tr><tr><td>Buyer Focus<\/td><td>Design and rating coverage<\/td><td>Serial number and test results<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a834bb86\">For metal-enclosed <strong><em><a href=\"https:\/\/dinghongtransformer.com\/uk\/product\/gis-gas-insulated-switchgear\/\" data-type=\"product\" data-id=\"37473\">medium-voltage switchgear<\/a><\/em><\/strong>, <strong>IEC 62271-200<\/strong> provides relevant requirements. Circuit breakers and other components may also require applicable IEC 62271 standards.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-b1a622c7\"><img decoding=\"async\" width=\"1670\" height=\"941\" class=\"wp-image-39006 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine.png 1670w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-400x225.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-1300x733.png 1300w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-768x433.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-1536x865.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-18x10.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-430x242.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-700x394.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-vs-routine-test-ukraine-150x85.png 150w\" data-sizes=\"(max-width: 1670px) 100vw, 1670px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1670px; --smush-placeholder-aspect-ratio: 1670\/941;\" \/><\/div>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-c6bf9131\"><span class=\"ez-toc-section\" id=\"2_Seven_Checks_Before_Accepting_Test_Reports\"><\/span>2. Seven Checks Before Accepting Test Reports<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-fbbf2d2e\"><span class=\"ez-toc-section\" id=\"Check_1_Match_the_Tested_Model\"><\/span>Check 1: Match the Tested Model<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cbdb27f0\">Confirm the manufacturer, model, enclosure design, breaker configuration, and applicable standard edition.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d1bf549f\">A report for one switchgear family does not automatically qualify every customized arrangement.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-7dec298f\"><span class=\"ez-toc-section\" id=\"Check_2_Verify_Electrical_Ratings\"><\/span>Check 2: Verify Electrical Ratings<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-139e69d6\">Compare the offered equipment against the report:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Parameter<\/th><th>Example Requirement<\/th><\/tr><tr><td>Rated Voltage<\/td><td>12kV<\/td><\/tr><tr><td>Frequency<\/td><td>50Hz<\/td><\/tr><tr><td>Rated Current<\/td><td>1250A<\/td><\/tr><tr><td>Short-Circuit Breaking Current<\/td><td>25kA<\/td><\/tr><tr><td>Short-Time Withstand<\/td><td>25kA \/ 3s<\/td><\/tr><tr><td>Insulation<\/td><td>Project-specified withstand levels<\/td><\/tr><tr><td>Internal Arc<\/td><td>IAC classification, if required<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-019c3fdd\"><em>Illustrative specifications; not a verified DHDL model rating.<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-e6633611\"><span class=\"ez-toc-section\" id=\"Check_3_Review_Design_Qualification_Tests\"><\/span>Check 3: Review Design Qualification Tests<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1844a059\">Depending on the equipment and applicable standard, type-test evidence may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dielectric withstand<\/li>\n\n\n\n<li>Temperature-rise performance<\/li>\n\n\n\n<li>Short-time and peak-current withstand<\/li>\n\n\n\n<li>Switching-device making and breaking capacity<\/li>\n\n\n\n<li>Mechanical operation<\/li>\n\n\n\n<li>Internal arc classification, where specified<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-164080f7\"><span class=\"ez-toc-section\" id=\"Check_4_Verify_Routine-Test_Records\"><\/span>Check 4: Verify Routine-Test Records<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-96227473\">Request evidence covering applicable production checks, including main-circuit dielectric tests, circuit resistance, mechanical operation, auxiliary circuits, visual inspection, and relevant enclosure checks.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-96b68908\"><span class=\"ez-toc-section\" id=\"Check_5_Check_Report_Authenticity\"><\/span>Check 5: Check Report Authenticity<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f9d72b97\">Verify the issuing laboratory, report number, test dates, equipment identification, and laboratory accreditation where required.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-e8ca2974\"><span class=\"ez-toc-section\" id=\"Check_6_Confirm_FAT_Witness_Requirements\"><\/span>Check 6: Confirm FAT Witness Requirements<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a59bd015\">Specify whether the Ukrainian EPC contractor, utility, or third-party inspector must witness factory tests.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-18e8c49c\">Agree on inspection notice periods and acceptance criteria before production.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-fc35cb1e\"><span class=\"ez-toc-section\" id=\"Check_7_Review_the_Complete_Documentation_Package\"><\/span>Check 7: Review the Complete Documentation Package<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-612f7fc7\">Match the test records with approved drawings, nameplates, component lists, protection schemes, and the final manufacturing configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-ca7f1f7d\"><span class=\"ez-toc-section\" id=\"3_Real_Ukraine_Project_Reference_DHDL_Distribution_Equipment_Supply\"><\/span>3. Real <em><a href=\"https:\/\/dinghongtransformer.com\/uk\/project\/ukraine-distribution-network-recovery-and-industrial-power-reconstruction-project\/\" data-type=\"page\" data-id=\"37359\">Ukraine Project Reference: DHDL Distribution Equipment Supply<\/a><\/em><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d79d5800\">DHDL publishes a Ukraine project involving <strong>80 distribution transformers<\/strong>, rated from <strong>100kVA to 1250kVA<\/strong>, for urban distribution and power infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cb33bbec\">The project highlights the importance of consistent specifications and batch documentation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-caae9a31\">Although this is a transformer supply reference\u2014not a verified switchgear delivery\u2014it illustrates why Ukraine EPC buyers should require equipment-specific inspection records and traceable documentation for multi-unit orders.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2fae8b74\">For a comparable switchgear procurement, each panel should be identifiable against its approved drawings, test records, and delivery documents.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-ae4e33ae\"><span class=\"ez-toc-section\" id=\"4_Ukraine-Specific_Procurement_Risks\"><\/span>4. Ukraine-Specific Procurement Risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9814b4a7\"><strong><em><a href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/ukraine-distribution-network-recovery-and-industrial-power-reconstruction-project\/\" data-type=\"post\" data-id=\"37372\">Ukraine<\/a><\/em><\/strong> buyers should confirm the actual utility requirements, system voltage, winter operating temperatures, indoor heating, installation environment, and documentation language.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-69e7edb9\">A <strong>12kV-rated switchgear panel<\/strong> should not automatically be assumed suitable for a <strong>20kV network<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bda3197c\">Other markets also require project-specific checks:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Uzbekistan and Russia:<\/strong> low-temperature operation and documentation.<\/li>\n\n\n\n<li><strong>Ethiopia and Nigeria:<\/strong> altitude, heat, dust, and utility acceptance.<\/li>\n\n\n\n<li><strong>Vietnam, Thailand, and Myanmar:<\/strong> humidity, condensation, and enclosure protection.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-04d8b14d\">Country-level conditions do not replace approved site specifications.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-2dfb1fdc\"><span class=\"ez-toc-section\" id=\"5_Hidden_Costs_Behind_Incomplete_Test_Reports\"><\/span>5. Hidden Costs Behind Incomplete Test Reports<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-437e0381\">Missing test documentation can result in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Additional third-party inspection fees<\/li>\n\n\n\n<li>Retesting or design clarification<\/li>\n\n\n\n<li>Utility approval delays<\/li>\n\n\n\n<li>Factory Acceptance Testing rescheduling<\/li>\n\n\n\n<li>Replacement components or revised drawings<\/li>\n\n\n\n<li>Delayed shipment and commissioning<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4ac91302\"><strong>Buyer tip:<\/strong> Request a report applicability matrix before comparing final quotations.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5a27bfbd\"><span class=\"ez-toc-section\" id=\"6_Switchgear_Test_Documentation_RFQ_Checklist\"><\/span>6. Switchgear Test Documentation RFQ Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Required Information<\/th><th>Buyer Input<\/th><\/tr><tr><td>Project Country \/ Utility<\/td><td>Ukraine \/ _____<\/td><\/tr><tr><td>Switchgear Model<\/td><td>_____<\/td><\/tr><tr><td>Rated Voltage \/ Current<\/td><td>_____ kV \/ _____ A<\/td><\/tr><tr><td>Short-Circuit Rating<\/td><td>_____ kA \/ _____ s<\/td><\/tr><tr><td>Applicable IEC Edition<\/td><td>_____<\/td><\/tr><tr><td>Type-Test Report Numbers<\/td><td>_____<\/td><\/tr><tr><td>Routine-Test Scope<\/td><td>_____<\/td><\/tr><tr><td>Internal Arc Requirement<\/td><td>_____<\/td><\/tr><tr><td>FAT Witness Arrangement<\/td><td>_____<\/td><\/tr><tr><td>Required Document Language<\/td><td>_____<\/td><\/tr><tr><td>Panel Quantity \/ Delivery<\/td><td>_____<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d5d026a8\"><strong>Attach:<\/strong> Single-Line Diagram, technical datasheet, switchgear layout, protection schematic, compliance matrix, inspection and test plan, and approved document register.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0ec6a8d4\"><span class=\"ez-toc-section\" id=\"7_Request_Switchgear_Documentation_from_DHDL\"><\/span>7. Request Switchgear Documentation from <strong><em><a href=\"https:\/\/dinghongtransformer.com\/uk\/contact-us\/\" data-type=\"page\" data-id=\"5288\">DHDL<\/a><\/em><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fe0970b2\">DHDL offers <strong><em><a href=\"https:\/\/dinghongtransformer.com\/uk\/product\/kyn28-metal-clad-withdrawable-switchgear\/\" data-type=\"product\" data-id=\"37476\">KYN28 metal-clad withdrawable switchgear<\/a><\/em><\/strong> and customized power distribution solutions.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bf58b297\">For projects in <strong>Ukraine<\/strong>, request confirmation of the exact model, available type-test evidence, routine-test scope, and project-specific compliance documents before placing an order.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-00b24f27\"><a href=\"https:\/\/dinghongtransformer.com\/uk\/contact-us\/\"><strong><em>Contact DHDL for a Technical Quotation<\/em><\/strong><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-bd688465\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-99d919b6\"><span class=\"ez-toc-section\" id=\"Are_type_tests_required_for_every_switchgear_panel\"><\/span>Are type tests required for every switchgear panel?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-99289b07\">No. Type tests qualify representative designs; applicable routine tests verify production assemblies.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-a131645e\"><span class=\"ez-toc-section\" id=\"Can_one_type-test_report_cover_different_switchgear_ratings\"><\/span>Can one type-test report cover different switchgear ratings?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3b0e0586\">Only where the applicable standard and documented design applicability support that coverage.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-af5fb985\"><span class=\"ez-toc-section\" id=\"Does_IEC_62271_compliance_guarantee_Ukraine_utility_approval\"><\/span>Does IEC 62271 compliance guarantee Ukraine utility approval?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f35a2017\">No. Buyers must confirm project-specific utility acceptance and local requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-4a21d728\"><span class=\"ez-toc-section\" id=\"What_should_an_EPC_buyer_request_before_FAT\"><\/span>What should an EPC buyer request before FAT?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4f83dab9\">An approved inspection and test plan, drawings, applicable test procedures, witness schedule, and acceptance criteria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.<\/p>","protected":false},"author":1,"featured_media":39005,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,71,101,98],"tags":[],"class_list":["post-39004","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-case-studies","category-grid-distribution","category-industrial-power-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/\" \/>\n<meta property=\"og:locale\" content=\"uk_UA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-12T03:34:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-12T03:34:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1670\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 \u0445\u0432\u0438\u043b\u0438\u043d\u0438\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers\",\"datePublished\":\"2026-11-12T03:34:54+00:00\",\"dateModified\":\"2026-11-12T03:34:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/\"},\"wordCount\":762,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/switchgear-type-test-reports-vs-routine-tests.png\",\"articleSection\":[\"Blog\",\"Case Studies\",\"Grid &amp; Distribution\",\"Industrial Power Projects\"],\"inLanguage\":\"uk\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/\",\"name\":\"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/switchgear-type-test-reports-vs-routine-tests.png\",\"datePublished\":\"2026-11-12T03:34:54+00:00\",\"dateModified\":\"2026-11-12T03:34:57+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#breadcrumb\"},\"inLanguage\":\"uk\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/switchgear-type-test-reports-vs-routine-tests.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/switchgear-type-test-reports-vs-routine-tests.png\",\"width\":1670,\"height\":941,\"caption\":\"switchgear type test reports vs routine tests\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/switchgear-type-test-vs-routine-test-ukraine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"uk\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/uk\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer","description":"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/","og_locale":"uk_UA","og_type":"article","og_title":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer","og_description":"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.","og_url":"https:\/\/dinghongtransformer.com\/uk\/blog\/switchgear-type-test-vs-routine-test-ukraine\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-11-12T03:34:54+00:00","article_modified_time":"2026-11-12T03:34:57+00:00","og_image":[{"width":1670,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"Written by":"DHDL","Est. reading time":"4 \u0445\u0432\u0438\u043b\u0438\u043d\u0438"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers","datePublished":"2026-11-12T03:34:54+00:00","dateModified":"2026-11-12T03:34:57+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/"},"wordCount":762,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png","articleSection":["Blog","Case Studies","Grid &amp; Distribution","Industrial Power Projects"],"inLanguage":"uk"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/","url":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/","name":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png","datePublished":"2026-11-12T03:34:54+00:00","dateModified":"2026-11-12T03:34:57+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"Compare switchgear type and routine tests under IEC 62271. Learn 7 report checks, FAT requirements and RFQ documents for Ukraine EPC projects.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#breadcrumb"},"inLanguage":"uk","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/"]}]},{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/switchgear-type-test-reports-vs-routine-tests.png","width":1670,"height":941,"caption":"switchgear type test reports vs routine tests"},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/switchgear-type-test-vs-routine-test-ukraine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Switchgear Type Test vs Routine Test: 7 Checks for Ukraine EPC Buyers"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"\u0414\u0456\u043d\u0445\u043e\u043d\u0441\u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0435\u0440","description":"DHDL \u0432\u0438\u0440\u043e\u0431\u043b\u044f\u0454 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u0438, \u0432\u0438\u0441\u043e\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u0456 \u0442\u0430 \u043d\u0438\u0437\u044c\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u0456 \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u044c\u043d\u0456 \u0449\u0438\u0442\u0438, \u0437\u0431\u0456\u0440\u043d\u0456 \u043f\u0456\u0434\u0441\u0442\u0430\u043d\u0446\u0456\u0457, \u043a\u0430\u043c\u0435\u0440\u0438 \u043d\u0430\u043a\u043e\u043f\u0438\u0447\u0435\u043d\u043d\u044f \u0435\u043d\u0435\u0440\u0433\u0456\u0457 \u0442\u0430 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f \u0434\u043b\u044f \u0437\u0430\u0440\u044f\u0434\u043a\u0438 \u0435\u043b\u0435\u043a\u0442\u0440\u043e\u043c\u043e\u0431\u0456\u043b\u0456\u0432 \u0434\u043b\u044f \u043a\u043e\u043c\u0443\u043d\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432, \u043f\u0440\u043e\u043c\u0438\u0441\u043b\u043e\u0432\u0438\u0445 \u0442\u0430 \u043d\u043e\u0432\u0438\u0445 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u0447\u043d\u0438\u0445 \u043f\u0440\u043e\u0454\u043a\u0442\u0456\u0432 \u043f\u043e \u0432\u0441\u044c\u043e\u043c\u0443 \u0441\u0432\u0456\u0442\u0443.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"uk"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/uk\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/posts\/39004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/comments?post=39004"}],"version-history":[{"count":1,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/posts\/39004\/revisions"}],"predecessor-version":[{"id":39007,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/posts\/39004\/revisions\/39007"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/media\/39005"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/media?parent=39004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/categories?post=39004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/uk\/wp-json\/wp\/v2\/tags?post=39004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}