{"id":39015,"date":"2026-11-16T05:23:18","date_gmt":"2026-11-16T05:23:18","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=39015"},"modified":"2026-11-16T05:23:21","modified_gmt":"2026-11-16T05:23:21","slug":"66kv-step-up-transformer-wind-solar-ukraine","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/","title":{"rendered":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers"},"content":{"rendered":"<p class=\"wp-block-wd-paragraph wd-f6ee1bc4\">A <strong><a href=\"https:\/\/dinghongtransformer.com\/ru\/product\/66kv-high-voltage-oil-immersed-power-transformer\/\" data-type=\"product\" data-id=\"37438\"><em>66kV step-up transformer<\/em><\/a><\/strong> connects renewable generation to a higher-voltage collection or transmission network. For wind and solar EPC projects, incorrect transformer specifications can cause protection conflicts, excessive losses, and commissioning delays.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5ab63f82\">In <strong><em><a href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/ukraine-distribution-network-recovery-and-industrial-power-reconstruction-project\/\" data-type=\"post\" data-id=\"37372\">\u0423\u043a\u0440\u0430\u0438\u043d\u0430<\/a><\/em><\/strong>, buyers must first verify the approved grid connection voltage. Not every renewable project uses 66kV; some require 35kV, 110kV, or other utility-specified levels.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a5b81f9a\">This guide covers ten essential specifications, practical sizing, hidden costs, and a <strong>66kV transformer RFQ checklist<\/strong>.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0421\u043e\u0434\u0435\u0440\u0436\u0430\u043d\u0438\u0435<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">\u041f\u0435\u0440\u0435\u043a\u043b\u044e\u0447\u0438\u0442\u044c<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#1_Confirm_the_Grid_Connection_Before_Selecting_66kV\" >1. Confirm the Grid Connection Before Selecting 66kV<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#2_Ten_Technical_Specifications_Buyers_Must_Provide\" >2. Ten Technical Specifications Buyers Must Provide<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#3_How_to_Estimate_Transformer_Capacity\" >3. How to Estimate Transformer Capacity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#4_Real_Equipment_Reference_and_Ukraine_Project_Scenario\" >4. Real Equipment Reference and Ukraine Project Scenario<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#5_Ukraine-Specific_Installation_Risks\" >5. Ukraine-Specific Installation Risks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#6_Hidden_Costs_in_66kV_Transformer_Quotations\" >6. Hidden Costs in 66kV Transformer Quotations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#7_66kV_Step-Up_Transformer_RFQ_Checklist\" >7. 66kV Step-Up Transformer RFQ Checklist<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#8_Request_a_66kV_Transformer_Quotation_from_DHDL\" >8. Request a 66kV Transformer Quotation from DHDL<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#Is_66kV_suitable_for_every_wind_or_solar_farm_in_Ukraine\" >Is 66kV suitable for every wind or solar farm in Ukraine?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#How_do_I_calculate_step-up_transformer_capacity\" >How do I calculate step-up transformer capacity?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#Is_ONAN_or_ONAF_better_for_renewable_projects\" >Is ONAN or ONAF better for renewable projects?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#What_documents_are_essential_before_ordering\" >What documents are essential before ordering?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-c644717a\"><span class=\"ez-toc-section\" id=\"1_Confirm_the_Grid_Connection_Before_Selecting_66kV\"><\/span>1. Confirm the Grid Connection Before Selecting 66kV<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4f0660a5\">Wind turbines and solar inverters typically connect through lower-voltage collection systems before power reaches the grid.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-22580c87\"><img decoding=\"async\" width=\"1671\" height=\"941\" class=\"wp-image-39017 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer.png 1671w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-400x225.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-1300x732.png 1300w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-768x432.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-1536x865.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-18x10.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-430x242.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-700x394.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-wind-farm-transformer-solar-farm-transformer-150x84.png 150w\" data-sizes=\"(max-width: 1671px) 100vw, 1671px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1671px; --smush-placeholder-aspect-ratio: 1671\/941;\" \/><\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c11fcac7\">A possible arrangement is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8fe8e216\"><strong>Wind Turbines \/ Solar Inverters \u2192 33kV Collection System \u2192 33\/66kV Step-Up Transformer \u2192 Grid Substation<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5b94bf19\">The actual voltage ratio must follow the approved Single-Line Diagram (SLD).<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ded2a68e\">For Ukrainian renewable projects, confirm the point of interconnection, voltage range, reactive-power obligations, and utility protection requirements before requesting a quotation.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-eb9d6099\"><span class=\"ez-toc-section\" id=\"2_Ten_Technical_Specifications_Buyers_Must_Provide\"><\/span>2. Ten Technical Specifications Buyers Must Provide<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>RFQ Parameter<\/th><th>Example \/ Requirement<\/th><\/tr><tr><td>Rated Capacity<\/td><td>20 \/ 40 \/ 63MVA<\/td><\/tr><tr><td>Voltage Ratio<\/td><td>33\/66kV, if approved<\/td><\/tr><tr><td>\u0427\u0430\u0441\u0442\u043e\u0442\u0430<\/td><td>50Hz<\/td><\/tr><tr><td>Transformer Type<\/td><td>Oil-immersed, outdoor<\/td><\/tr><tr><td>Cooling<\/td><td>ONAN \/ ONAF<\/td><\/tr><tr><td>Vector Group<\/td><td>As specified by grid study<\/td><\/tr><tr><td>Short-Circuit Impedance<\/td><td>Project-specific<\/td><\/tr><tr><td>Tap Changer<\/td><td>OLTC \/ Off-circuit<\/td><\/tr><tr><td>\u0423\u0440\u043e\u0432\u0435\u043d\u044c \u0438\u0437\u043e\u043b\u044f\u0446\u0438\u0438<\/td><td>IEC 60076 \/ utility specification<\/td><\/tr><tr><td>Loss Guarantees<\/td><td>No-load and load losses<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-dbe629ff\"><em>Values are illustrative, not confirmed DHDL model ratings.<\/em><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-334eae80\">DHDL&#8217;s published <strong><em><a href=\"https:\/\/dinghongtransformer.com\/ru\/product\/66kv-high-voltage-oil-immersed-power-transformer\/\" data-type=\"product\" data-id=\"37438\">66kV high-voltage transformer<\/a><\/em><\/strong> range supports customized capacity, voltage ratio, cooling, impedance, insulation, and accessories.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-f1a69d38\"><span class=\"ez-toc-section\" id=\"3_How_to_Estimate_Transformer_Capacity\"><\/span>3. How to Estimate Transformer Capacity<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0f0dbc09\">Consider a proposed <strong>30MW solar farm in Ukraine<\/strong> operating at 0.95 power factor.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b071a11a\">A simplified apparent-power calculation is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f2cbec58\"><strong>S = P \/ PF = 30 \/ 0.95 \u2248 31.6MVA<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e67a2bee\">A 40MVA transformer may be evaluated as a preliminary option.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6fe97ddb\">However, final selection must consider inverter capability, reactive-power requirements, export limits, temperature, cooling, and future expansion.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a2a2ba3d\">For wind farms, use the actual turbine generation profile and simultaneous output rather than simply adding nameplate capacities.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-07a63ab7\"><span class=\"ez-toc-section\" id=\"4_Real_Equipment_Reference_and_Ukraine_Project_Scenario\"><\/span>4. Real Equipment Reference and Ukraine Project Scenario<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0a572291\">DHDL publishes a <strong><em><a href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-high-voltage-oil-immersed-power-transformer-buyers-guide\/\" data-type=\"post\" data-id=\"37925\">66kV high-voltage oil-immersed power transformer<\/a><\/em><\/strong> for substations, power transmission, and renewable energy grid connection. Its product information identifies customizable capacity and ONAN\/ONAF cooling options.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f1e14dda\">For a proposed Ukrainian wind farm using a 33kV collection network and an approved 66kV connection, the EPC contractor should provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Approved SLD and grid connection agreement<\/li>\n\n\n\n<li>Maximum export capacity and generation profile<\/li>\n\n\n\n<li>Voltage ratio, vector group, and grounding requirements<\/li>\n\n\n\n<li>Harmonic and reactive-power studies<\/li>\n\n\n\n<li>Short-circuit levels and protection settings<\/li>\n\n\n\n<li>Site temperature and transport restrictions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-baa10329\"><strong>Project clarification:<\/strong> This is an illustrative Ukrainian engineering scenario, not a claimed DHDL wind-farm delivery.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0e32bc38\"><span class=\"ez-toc-section\" id=\"5_Ukraine-Specific_Installation_Risks\"><\/span>5. Ukraine-Specific Installation Risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-59cfcf1f\">Ukraine projects may require additional review of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Minimum winter ambient temperature<\/li>\n\n\n\n<li>Transformer oil and accessory temperature suitability<\/li>\n\n\n\n<li>Snow, wind, and outdoor installation conditions<\/li>\n\n\n\n<li>Voltage regulation and grid-code compliance<\/li>\n\n\n\n<li>Remote monitoring and protection interfaces<\/li>\n\n\n\n<li>Transport access and unloading capacity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4006b0f5\">For <strong>Uzbekistan and Russia<\/strong>, temperature extremes may also influence transformer design.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-05286ec0\">For <strong>\u042d\u0444\u0438\u043e\u043f\u0438\u044f<\/strong>, altitude and cooling performance deserve attention. Projects in <strong>Vietnam, Thailand, Myanmar, and Nigeria<\/strong> may require site-specific humidity, corrosion, heat, or logistics assessments.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-f09da972\"><span class=\"ez-toc-section\" id=\"6_Hidden_Costs_in_66kV_Transformer_Quotations\"><\/span>6. Hidden Costs in <em><a href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-high-voltage-oil-immersed-power-transformer-buyers-guide\/\" data-type=\"post\" data-id=\"37925\">66kV Transformer Quotations<\/a><\/em><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5a931b06\">Two suppliers may quote the same MVA rating while excluding different items.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2206c4b0\">Verify whether the price includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>On-load tap changer and control cabinet<\/li>\n\n\n\n<li>Bushings, surge arresters, and protection accessories<\/li>\n\n\n\n<li>Cooling fans and monitoring equipment<\/li>\n\n\n\n<li>Guaranteed losses and testing<\/li>\n\n\n\n<li>Factory Acceptance Testing (FAT) witness arrangements<\/li>\n\n\n\n<li>Export packing, transport, and site support<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b8feb05d\"><strong>Buyer tip:<\/strong> Compare guaranteed no-load and load losses, not only purchase price. For example, an additional 5kW of continuous no-load loss represents approximately <strong>43,800kWh annually<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-78c9d585\"><span class=\"ez-toc-section\" id=\"7_66kV_Step-Up_Transformer_RFQ_Checklist\"><\/span>7. 66kV Step-Up Transformer RFQ Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Required Information<\/th><th>Buyer Input<\/th><\/tr><tr><td>Country \/ Project<\/td><td>Ukraine \/ _____<\/td><\/tr><tr><td>Application<\/td><td>Wind \/ Solar<\/td><\/tr><tr><td>Plant Capacity<\/td><td>_____ MW<\/td><\/tr><tr><td>Export Capacity \/ PF<\/td><td>_____ MW \/ _____<\/td><\/tr><tr><td>Voltage Ratio \/ Frequency<\/td><td>_____ kV \/ 50Hz<\/td><\/tr><tr><td>Transformer Capacity<\/td><td>_____ MVA<\/td><\/tr><tr><td>Vector Group \/ Grounding<\/td><td>_____<\/td><\/tr><tr><td>Impedance \/ Tap Range<\/td><td>_____<\/td><\/tr><tr><td>Cooling \/ Loss Limits<\/td><td>_____<\/td><\/tr><tr><td>Minimum Temperature \/ Altitude<\/td><td>_____<\/td><\/tr><tr><td>IEC \/ Utility Standards<\/td><td>_____<\/td><\/tr><tr><td>Quantity \/ Delivery \/ Incoterms<\/td><td>_____<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-68f0f066\"><strong>Attach:<\/strong> SLD, grid connection requirements, generation profile, technical specification, protection study, site layout, transport limits, and inspection requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-21213a41\"><span class=\"ez-toc-section\" id=\"8_Request_a_66kV_Transformer_Quotation_from_DHDL\"><\/span>8. Request a 66kV Transformer Quotation from DHDL<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ec711629\">DHDL offers customized high-voltage oil-immersed power transformers for substations and renewable energy applications.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ce956666\">For projects in <strong>Ukraine, Ethiopia, Vietnam, Thailand, Myanmar, Uzbekistan, Russia, and Nigeria<\/strong>, submit the approved voltage ratio, capacity, grid requirements, drawings, and delivery destination for technical review.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d9ea8e7d\"><strong><em><a href=\"https:\/\/dinghongtransformer.com\/ru\/%d1%81%d0%b2%d1%8f%d0%b7%d0%b0%d1%82%d1%8c%d1%81%d1%8f-%d1%81-%d0%bd%d0%b0%d0%bc%d0%b8\/\">Contact DHDL for a Technical Quotation<\/a><\/em><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-166f018e\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-7bb4d6da\"><span class=\"ez-toc-section\" id=\"Is_66kV_suitable_for_every_wind_or_solar_farm_in_Ukraine\"><\/span>Is 66kV suitable for every wind or solar farm in Ukraine?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fb4a3a47\">No. The voltage must match the approved utility connection and project design.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-c6904c8f\"><span class=\"ez-toc-section\" id=\"How_do_I_calculate_step-up_transformer_capacity\"><\/span>How do I calculate step-up transformer capacity?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-abfc0b3b\">Start with generation MW and required power factor, then assess reactive power, operating duty, cooling, and grid requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-90e81942\"><span class=\"ez-toc-section\" id=\"Is_ONAN_or_ONAF_better_for_renewable_projects\"><\/span>Is ONAN or ONAF better for renewable projects?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-980c2386\">The choice depends on continuous loading, peak generation, ambient conditions, redundancy, and lifecycle costs.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-0ad3a83b\"><span class=\"ez-toc-section\" id=\"What_documents_are_essential_before_ordering\"><\/span>What documents are essential before ordering?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d5ec384b\">Provide the SLD, grid connection agreement, technical datasheet, protection requirements, site conditions, and FAT documentation requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.<\/p>","protected":false},"author":1,"featured_media":39016,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-39015","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-16T05:23:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-16T05:23:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 \u043c\u0438\u043d\u0443\u0442\u044b\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers\",\"datePublished\":\"2026-11-16T05:23:18+00:00\",\"dateModified\":\"2026-11-16T05:23:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/\"},\"wordCount\":778,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"ru-RU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/\",\"name\":\"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png\",\"datePublished\":\"2026-11-16T05:23:18+00:00\",\"dateModified\":\"2026-11-16T05:23:21+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png\",\"width\":1672,\"height\":941,\"caption\":\"66kV Step-Up Transformers for Wind & Solar Farms\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/66kv-step-up-transformer-wind-solar-ukraine\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/ru\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer","description":"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/","og_locale":"ru_RU","og_type":"article","og_title":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer","og_description":"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.","og_url":"https:\/\/dinghongtransformer.com\/ru\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-11-16T05:23:18+00:00","article_modified_time":"2026-11-16T05:23:21+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c":"DHDL","\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"4 \u043c\u0438\u043d\u0443\u0442\u044b"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers","datePublished":"2026-11-16T05:23:18+00:00","dateModified":"2026-11-16T05:23:21+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/"},"wordCount":778,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png","articleSection":["Blog"],"inLanguage":"ru-RU"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/","url":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/","name":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png","datePublished":"2026-11-16T05:23:18+00:00","dateModified":"2026-11-16T05:23:21+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"Sourcing a 66kV step-up transformer for wind or solar farms? Check sizing, voltage ratio, cooling, grid requirements and RFQ documents for Ukraine EPC projects.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/"]}]},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/11\/66kV-Step-Up-Transformers-for-Wind-Solar-Farms.png","width":1672,"height":941,"caption":"66kV Step-Up Transformers for Wind & Solar Farms"},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/66kv-step-up-transformer-wind-solar-ukraine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"66kV Step-Up Transformers for Wind &amp; Solar Farms: 10 RFQ Checks for Ukraine EPC Buyers"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL \u043f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0438\u0442 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u044b, \u0440\u0430\u0441\u043f\u0440\u0435\u0434\u0435\u043b\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0435 \u0448\u043a\u0430\u0444\u044b \u0432\u044b\u0441\u043e\u043a\u043e\u0433\u043e \u0438 \u043d\u0438\u0437\u043a\u043e\u0433\u043e \u043d\u0430\u043f\u0440\u044f\u0436\u0435\u043d\u0438\u044f, \u043a\u043e\u043c\u043f\u043b\u0435\u043a\u0442\u043d\u044b\u0435 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u043d\u044b\u0435 \u043f\u043e\u0434\u0441\u0442\u0430\u043d\u0446\u0438\u0438, \u0448\u043a\u0430\u0444\u044b \u043d\u0430\u043a\u043e\u043f\u0438\u0442\u0435\u043b\u0435\u0439 \u044d\u043d\u0435\u0440\u0433\u0438\u0438 \u0438 \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u0435 \u0434\u043b\u044f \u0437\u0430\u0440\u044f\u0434\u043a\u0438 \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u043c\u043e\u0431\u0438\u043b\u0435\u0439 \u0434\u043b\u044f \u044d\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u0447\u0435\u0441\u043a\u0438\u0445, \u043f\u0440\u043e\u043c\u044b\u0448\u043b\u0435\u043d\u043d\u044b\u0445 \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u0432 \u0438 \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u0432 \u0432 \u043e\u0431\u043b\u0430\u0441\u0442\u0438 \u0432\u043e\u0437\u043e\u0431\u043d\u043e\u0432\u043b\u044f\u0435\u043c\u044b\u0445 \u0438\u0441\u0442\u043e\u0447\u043d\u0438\u043a\u043e\u0432 \u044d\u043d\u0435\u0440\u0433\u0438\u0438 \u043f\u043e \u0432\u0441\u0435\u043c\u0443 \u043c\u0438\u0440\u0443.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"\u0414\u0425\u0414\u041b","image":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/ru\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/39015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/comments?post=39015"}],"version-history":[{"count":1,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/39015\/revisions"}],"predecessor-version":[{"id":39018,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/39015\/revisions\/39018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/media\/39016"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/media?parent=39015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/categories?post=39015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/tags?post=39015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}