{"id":37074,"date":"2026-06-20T12:12:52","date_gmt":"2026-06-20T12:12:52","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=37074"},"modified":"2026-06-20T12:27:14","modified_gmt":"2026-06-20T12:27:14","slug":"from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/","title":{"rendered":"\u041e\u0442 20 \u0435\u0434\u0438\u043d\u0438\u0446 \u0434\u043e 63 \u041c\u0412\u0410: DHDL \u0443\u0441\u043f\u0435\u0448\u043d\u043e \u0440\u0435\u0430\u043b\u0438\u0437\u043e\u0432\u0430\u043b\u0430 \u043a\u0440\u0443\u043f\u043d\u043e\u043c\u0430\u0441\u0448\u0442\u0430\u0431\u043d\u044b\u0439 \u043f\u0440\u043e\u0435\u043a\u0442 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u043e\u0432 \u0432 \u042d\u0444\u0438\u043e\u043f\u0438\u0438"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0421\u043e\u0434\u0435\u0440\u0436\u0430\u043d\u0438\u0435<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">\u041f\u0435\u0440\u0435\u043a\u043b\u044e\u0447\u0438\u0442\u044c<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Introduction\" >\u0412\u0432\u0435\u0434\u0435\u043d\u0438\u0435<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Table_of_Contents\" >\u0421\u043e\u0434\u0435\u0440\u0436\u0430\u043d\u0438\u0435<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#1_Project_Overview\" >1. Project Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#2_Why_This_Project_Matters\" >2. Why This Project Matters<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#3_Project_Challenges\" >3. Project Challenges<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Large-Scale_Batch_Delivery\" >Large-Scale Batch Delivery<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Harsh_Outdoor_Operating_Environment\" >Harsh Outdoor Operating Environment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#International_Transportation_Risk\" >International Transportation Risk<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Installation_and_Technical_Coordination\" >Installation and Technical Coordination<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#4_DHDLs_Customized_Solution\" >4. DHDL\u2019s Customized Solution<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Batch_Production_Management\" >Batch Production Management<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#Reinforced_Structure_for_Outdoor_Operation\" >Reinforced Structure for Outdoor Operation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#IEC_Standard_Compliance\" >IEC Standard Compliance<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#5_Manufacturing_and_Quality_Control\" >5. Manufacturing and Quality Control<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#6_Export_Packaging_and_Transportation_Support\" >6. Export Packaging and Transportation Support<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#7_On-Site_Technical_Support_and_Project_Operation\" >7. On-Site Technical Support and Project Operation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#8_What_This_Project_Means_for_DHDLs_Global_Market\" >8. What This Project Means for DHDL\u2019s Global Market<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#9_About_DHDL\" >9. About DHDL<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#10_Conclusion\" >10. Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#11_Follow_DHDL_for_More_Project_News\" >11. Follow DHDL for More Project News<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-85b1e93e\"><span class=\"ez-toc-section\" id=\"Introduction\"><\/span>\u0412\u0432\u0435\u0434\u0435\u043d\u0438\u0435<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5f74f15f\">DHDL is pleased to announce the successful delivery and operation of a large-scale power distribution project in Ethiopia.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-446eb8ed\">For this project, DHDL supplied 20 units of 3.15MVA oil-immersed power transformers, with a total project capacity of 63MVA. The transformers are used for local industrial facilities and regional power distribution system construction, helping improve power supply stability and infrastructure reliability.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-77d495b8\">The project required strong manufacturing coordination, stable batch delivery, reliable outdoor performance, and technical support for overseas installation. With mature production management, strict factory testing, professional export packaging, and on-site technical assistance, DHDL successfully completed the project and supported the customer\u2019s power infrastructure development.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-bbefe39a\"><span class=\"ez-toc-section\" id=\"Table_of_Contents\"><\/span>\u0421\u043e\u0434\u0435\u0440\u0436\u0430\u043d\u0438\u0435<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Project Overview<\/li>\n\n\n\n<li>Why This Project Matters<\/li>\n\n\n\n<li>Project Challenges<\/li>\n\n\n\n<li>DHDL\u2019s Customized Solution<\/li>\n\n\n\n<li>Manufacturing and Quality Control<\/li>\n\n\n\n<li>Export Packaging and Transportation Support<\/li>\n\n\n\n<li>On-Site Technical Support and Project Operation<\/li>\n\n\n\n<li>What This Project Means for DHDL\u2019s Global Market<\/li>\n\n\n\n<li>\u041e DHDL<\/li>\n\n\n\n<li>\u0417\u0430\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u0435<\/li>\n\n\n\n<li>Follow DHDL for More Project News<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-55e791ca\"><span class=\"ez-toc-section\" id=\"1_Project_Overview\"><\/span>1. Project Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1d2a9c68\">This Ethiopia power distribution project is one of DHDL\u2019s important overseas transformer delivery cases in the African market.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81eb5740\">The project included:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6067c11e\">Project Country: Ethiopia<br>Product Type: Oil-Immersed Power Transformer<br>Capacity: 3.15MVA per unit<br>Total Project Capacity: 63MVA<br>Quantity: 20 Units<br>Voltage Level: 33kV<br>Standard: IEC Standard<br>Application: Industrial Park and Regional Power Distribution System<br>Installation Environment: High-temperature, dusty, outdoor environment<br>Delivery Time: 50 Days<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-504bbca9\">The transformers were designed for long-term outdoor operation and stable power distribution performance under challenging local environmental conditions.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-f05e8c38\"><span class=\"ez-toc-section\" id=\"2_Why_This_Project_Matters\"><\/span>2. Why This Project Matters<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c1cd792a\">Reliable power distribution equipment is essential for industrial development, infrastructure construction, and regional electricity supply.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0eed22a8\">In many overseas markets, especially in areas with high temperature, dust, long transportation routes, and outdoor installation conditions, transformers must be designed not only for rated capacity but also for real operating environments.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-34b144e1\">This project was not a single-unit delivery. It involved 20 transformers delivered as a complete batch. That means the customer required:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a4266e9d\">Consistent product performance<br>Stable electrical parameters<br>Reliable insulation and cooling design<br>Strict factory inspection<br>Efficient production scheduling<br>Professional export packaging<br>Smooth international transportation<br>Technical support for installation and operation<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5f7ae233\">For DHDL, the project demonstrated its ability to manage large-volume transformer orders for overseas power infrastructure projects.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-107bd334\"><span class=\"ez-toc-section\" id=\"3_Project_Challenges\"><\/span>3. Project Challenges<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-1d29d446\"><span class=\"ez-toc-section\" id=\"Large-Scale_Batch_Delivery\"><\/span>Large-Scale Batch Delivery<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-31bf5f6c\">The project required 20 units of 3.15MVA transformers. Batch delivery places higher requirements on factory capacity, production planning, raw material coordination, and quality consistency.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e30a35a1\">Each unit needed to meet the same technical standard and performance expectations. For power distribution projects, consistency is especially important because unstable product quality may increase future maintenance risks.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-539bff7f\"><span class=\"ez-toc-section\" id=\"Harsh_Outdoor_Operating_Environment\"><\/span>Harsh Outdoor Operating Environment<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9422626c\">The project site in Ethiopia required transformers to operate in a high-temperature and dusty outdoor environment.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-15e00ab0\">This created higher requirements for:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-167dd411\">Heat dissipation<br>Anti-corrosion performance<br>Sealing structure<br>Insulation reliability<br>Long-term mechanical stability<br>Outdoor protection design<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-133dc72b\">A standard design without environmental adaptation may increase the risk of overheating, insulation aging, dust-related issues, or reduced service life.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-952df930\"><span class=\"ez-toc-section\" id=\"International_Transportation_Risk\"><\/span>International Transportation Risk<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2902f032\">The project involved long-distance international shipping and local transportation. Transformers are heavy electrical equipment, so transportation safety was a key concern.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cfac9bfe\">During overseas delivery, transformers may face humidity, vibration, port handling, road transportation, and storage uncertainty. Proper packaging and loading protection are critical to reducing transportation damage.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-9c9a9a0b\"><span class=\"ez-toc-section\" id=\"Installation_and_Technical_Coordination\"><\/span>Installation and Technical Coordination<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-94e528bd\">For overseas power equipment projects, delivery is only one part of the work. The customer also needs support for installation, technical confirmation, and smooth commissioning.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c2e8d44b\">DHDL provided technical support to help the customer complete project implementation more efficiently.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-8aa291d4\"><span class=\"ez-toc-section\" id=\"4_DHDLs_Customized_Solution\"><\/span>4. DHDL\u2019s Customized Solution<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0b342898\">To meet the customer\u2019s project requirements, DHDL provided a complete solution covering product design, manufacturing, testing, export packaging, delivery coordination, and technical support.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-4727dadc\"><span class=\"ez-toc-section\" id=\"Batch_Production_Management\"><\/span>Batch Production Management<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-93c338d4\">DHDL created a dedicated production plan for the 20-unit transformer order. The production team coordinated materials, production schedules, assembly processes, and inspection steps to ensure timely delivery.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6cce4309\">This helped the customer reduce project delays and keep the power distribution construction schedule moving forward.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-b8ccc31c\"><span class=\"ez-toc-section\" id=\"Reinforced_Structure_for_Outdoor_Operation\"><\/span>Reinforced Structure for Outdoor Operation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d9af3737\">According to the local high-temperature and dusty conditions, DHDL optimized the transformer design for better long-term operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-edaf8fe0\">The solution focused on:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-eb52d7b4\">Improved heat dissipation design<br>Reliable insulation structure<br>Anti-corrosion treatment<br>Stable sealing performance<br>Outdoor operation adaptability<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e534b316\">These design considerations help improve transformer reliability in demanding environments.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-bef166e0\"><span class=\"ez-toc-section\" id=\"IEC_Standard_Compliance\"><\/span>IEC Standard Compliance<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7c6db67c\">The transformers were manufactured according to IEC standard requirements. This was important for project acceptance, safe operation, and technical compatibility with the customer\u2019s power distribution system.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9720a0fd\">For overseas customers, standard compliance helps reduce project risk and makes later operation, maintenance, and technical documentation more reliable.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-1c6b64af\"><span class=\"ez-toc-section\" id=\"5_Manufacturing_and_Quality_Control\"><\/span>5. Manufacturing and Quality Control<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1688a52b\">For transformer projects, manufacturing quality is one of the most important factors affecting long-term operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a596507b\">DHDL focuses on process control, not only final inspection. From raw material inspection to core assembly, coil winding, insulation treatment, vacuum drying, final assembly, and factory testing, each step affects the transformer\u2019s performance.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e1b7dd95\">For this Ethiopia project, DHDL paid special attention to:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c36a6138\">Core and coil manufacturing stability<br>Insulation treatment<br>Cooling performance<br>Electrical parameter consistency<br>Mechanical structure reliability<br>Factory testing before shipment<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3f24a646\">Before delivery, the transformers went through strict inspection to confirm that they met the project requirements and were ready for overseas operation.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-aeb76b2a\"><span class=\"ez-toc-section\" id=\"6_Export_Packaging_and_Transportation_Support\"><\/span>6. Export Packaging and Transportation Support<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ce87c186\">Because the project involved international transportation, packaging was a key part of the delivery plan.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-282909d4\">DHDL adopted professional export protection to reduce transportation risks during sea freight and local delivery.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-58e9f6a0\">The packaging solution focused on:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cdc8a1f8\">Moisture protection<br>Anti-vibration reinforcement<br>Stable equipment fixing<br>Transportation safety<br>Accessory protection<br>Container loading coordination<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-71761b1a\">For large transformer orders, professional packaging is not a small detail. It directly affects whether the equipment can arrive safely and be installed without unnecessary delays.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-28639fc7\"><span class=\"ez-toc-section\" id=\"7_On-Site_Technical_Support_and_Project_Operation\"><\/span>7. On-Site Technical Support and Project Operation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-076af96e\">After delivery, DHDL provided technical guidance and support for project installation and operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-66b3bf17\">The technical support helped the customer:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e7a7d00f\">Confirm installation requirements<br>Understand transformer operation points<br>Complete commissioning more efficiently<br>Reduce installation uncertainty<br>Improve project execution speed<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6738366f\">After the project was put into operation, the equipment performed stably and met the customer\u2019s local power distribution needs.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0d146af5\">This successful operation further proved DHDL\u2019s ability to support overseas power projects from production to delivery and technical service.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-75ac6e91\"><span class=\"ez-toc-section\" id=\"8_What_This_Project_Means_for_DHDLs_Global_Market\"><\/span>8. What This Project Means for DHDL\u2019s Global Market<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5d9cb72f\">The successful delivery of the Ethiopia 63MVA transformer project is an important step for DHDL in the African power equipment market.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7e894428\">Africa has strong demand for reliable power infrastructure, including industrial power systems, regional distribution networks, renewable energy supporting systems, and urban infrastructure projects.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81ea0e63\">Through this project, DHDL strengthened its experience in:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3a7555c3\">Large-volume transformer delivery<br>High-temperature outdoor equipment design<br>Dusty environment adaptation<br>International shipping protection<br>Overseas technical coordination<br>Power infrastructure project support<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9df2ff96\">This project also reflects DHDL\u2019s long-term commitment to providing reliable transformer and power distribution solutions for global customers.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-e93f4add\"><span class=\"ez-toc-section\" id=\"9_About_DHDL\"><\/span>9. About <a href=\"https:\/\/dinghongtransformer.com\/ru\/\">\u0414\u0425\u0414\u041b<\/a><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-438a674a\"><a href=\"https:\/\/dinghongtransformer.com\/ru\/\">\u0414\u0425\u0414\u041b<\/a> is a power equipment manufacturer focused on transformers, power distribution equipment, and new energy power system solutions.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c0391520\">Our main products include:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-553f0ab2\">Oil-immersed transformers<br>Dry-type transformers<br>Power transformers<br>Special transformers<br>High-voltage switchgear<br>Low-voltage distribution cabinets<br>Prefabricated substations<br>Energy storage cabinets<br>EV charging equipment<br>Renewable energy power distribution solutions<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4446c106\">DHDL supports OEM, ODM, and customized transformer solutions for different countries, grid standards, installation environments, and project requirements.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6fda26a9\">With stable manufacturing capability, strict quality control, export project experience, and responsive technical support, DHDL continues to serve customers in Africa, Southeast Asia, the Middle East, Europe, and other international markets.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-fe988f7c\"><span class=\"ez-toc-section\" id=\"10_Conclusion\"><\/span>10. Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2599727c\">The successful completion of the Ethiopia 20\u00d73.15MVA transformer project shows DHDL\u2019s ability to support large-scale overseas power distribution projects with reliable products and practical engineering service.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-397d0393\">From batch production and quality control to export packaging and technical support, DHDL helped the customer complete the project smoothly and improve local power distribution reliability.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6a5dfdce\">For global customers looking for oil-immersed transformers, power transformers, prefabricated substations, or complete power distribution solutions, DHDL can provide customized support based on your voltage level, capacity, installation environment, technical standard, and delivery schedule.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ee24f81e\">Contact DHDL today to discuss your next transformer project.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-33b1ac8e\"><span class=\"ez-toc-section\" id=\"11_Follow_DHDL_for_More_Project_News\"><\/span>11. Follow <a href=\"https:\/\/dinghongtransformer.com\/ru\/\">\u0414\u0425\u0414\u041b<\/a> for More Project News<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c46efaaa\">Stay connected with DHDL for more transformer project updates, product news, technical insights, and power distribution solutions.<\/p>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":37033,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[74],"tags":[],"class_list":["post-37074","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-20T12:12:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-20T12:27:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1125\" \/>\n\t<meta property=\"og:image:height\" content=\"627\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 \u043c\u0438\u043d\u0443\u0442\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia\",\"datePublished\":\"2026-06-20T12:12:52+00:00\",\"dateModified\":\"2026-06-20T12:27:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/\"},\"wordCount\":1280,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/IMG_E7867.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ru-RU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/\",\"name\":\"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/IMG_E7867.jpg\",\"datePublished\":\"2026-06-20T12:12:52+00:00\",\"dateModified\":\"2026-06-20T12:27:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/IMG_E7867.jpg\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/IMG_E7867.jpg\",\"width\":1125,\"height\":627},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/news\\\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/ru\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/","og_locale":"ru_RU","og_type":"article","og_title":"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer","og_url":"https:\/\/dinghongtransformer.com\/ru\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-06-20T12:12:52+00:00","article_modified_time":"2026-06-20T12:27:14+00:00","og_image":[{"width":1125,"height":627,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg","type":"image\/jpeg"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c":"DHDL","\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"6 \u043c\u0438\u043d\u0443\u0442"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia","datePublished":"2026-06-20T12:12:52+00:00","dateModified":"2026-06-20T12:27:14+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/"},"wordCount":1280,"image":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg","articleSection":["News"],"inLanguage":"ru-RU"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/","url":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/","name":"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg","datePublished":"2026-06-20T12:12:52+00:00","dateModified":"2026-06-20T12:27:14+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/"]}]},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/06\/IMG_E7867.jpg","width":1125,"height":627},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/news\/from-20-units-to-63mva-dhdl-successfully-delivers-a-large-scale-transformer-project-in-ethiopia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"From 20 Units to 63MVA: DHDL Successfully Delivers a Large-Scale Transformer Project in Ethiopia"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL \u043f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0438\u0442 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u044b, \u0440\u0430\u0441\u043f\u0440\u0435\u0434\u0435\u043b\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0435 \u0448\u043a\u0430\u0444\u044b \u0432\u044b\u0441\u043e\u043a\u043e\u0433\u043e \u0438 \u043d\u0438\u0437\u043a\u043e\u0433\u043e \u043d\u0430\u043f\u0440\u044f\u0436\u0435\u043d\u0438\u044f, \u043a\u043e\u043c\u043f\u043b\u0435\u043a\u0442\u043d\u044b\u0435 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u043d\u044b\u0435 \u043f\u043e\u0434\u0441\u0442\u0430\u043d\u0446\u0438\u0438, \u0448\u043a\u0430\u0444\u044b \u043d\u0430\u043a\u043e\u043f\u0438\u0442\u0435\u043b\u0435\u0439 \u044d\u043d\u0435\u0440\u0433\u0438\u0438 \u0438 \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u0435 \u0434\u043b\u044f \u0437\u0430\u0440\u044f\u0434\u043a\u0438 \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u043c\u043e\u0431\u0438\u043b\u0435\u0439 \u0434\u043b\u044f \u044d\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u0447\u0435\u0441\u043a\u0438\u0445, \u043f\u0440\u043e\u043c\u044b\u0448\u043b\u0435\u043d\u043d\u044b\u0445 \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u0432 \u0438 \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u0432 \u0432 \u043e\u0431\u043b\u0430\u0441\u0442\u0438 \u0432\u043e\u0437\u043e\u0431\u043d\u043e\u0432\u043b\u044f\u0435\u043c\u044b\u0445 \u0438\u0441\u0442\u043e\u0447\u043d\u0438\u043a\u043e\u0432 \u044d\u043d\u0435\u0440\u0433\u0438\u0438 \u043f\u043e \u0432\u0441\u0435\u043c\u0443 \u043c\u0438\u0440\u0443.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"\u0414\u0425\u0414\u041b","image":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/ru\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/37074","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/comments?post=37074"}],"version-history":[{"count":1,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/37074\/revisions"}],"predecessor-version":[{"id":37076,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/posts\/37074\/revisions\/37076"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/media\/37033"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/media?parent=37074"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/categories?post=37074"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/ru\/wp-json\/wp\/v2\/tags?post=37074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}