{"id":38713,"date":"2026-09-18T04:12:09","date_gmt":"2026-09-18T04:12:09","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=38713"},"modified":"2026-09-18T04:12:23","modified_gmt":"2026-09-18T04:12:23","slug":"low-voltage-distribution-cabinet","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","title":{"rendered":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide"},"content":{"rendered":"<p class=\"wp-block-wd-paragraph wd-7a9bb216\">A <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/ggd-low-voltage-distribution-cabinet-for-power-distribution\/\" data-type=\"product\" data-id=\"37463\">low-voltage distribution cabinet<\/a><\/strong> is one of the last major stages between a transformer and the electrical loads inside a factory, commercial building, data center, industrial park, or infrastructure project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f8e1b420\">Its job is not simply to \u201cdistribute electricity.\u201d<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-24391cb3\">A properly designed low-voltage cabinet must distribute power safely, isolate faults, protect outgoing circuits, support metering and control, and leave enough capacity for future loads.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e7f669d3\">This means buyers should not request a quotation by saying only:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c8882d4c\"><strong>\u201cWe need a 400V low-voltage distribution cabinet.\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7c286db3\">The manufacturer still needs to know the rated current, short-circuit level, number of feeders, breaker configuration, busbar requirements, protection functions, cable arrangement, IP rating, installation environment, and applicable standards.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6a955aba\">DHDL manufactures low-voltage distribution equipment as part of its transformer and power-distribution portfolio, with project-specific customization for industrial, commercial, utility, renewable-energy, and data-center applications.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5011dc07\">This guide explains the technical parameters buyers should confirm before purchasing a <strong>low-voltage distribution cabinet<\/strong>, including several details that are frequently missed during the RFQ stage.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#1_What_Is_a_Low-Voltage_Distribution_Cabinet\" >1. What Is a Low-Voltage Distribution Cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#2_Key_Specifications_Buyers_Should_Confirm\" >2. Key Specifications Buyers Should Confirm<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#3_Rated_Current_Do_Not_Select_It_from_Transformer_kVA_Alone\" >3. Rated Current: Do Not Select It from Transformer kVA Alone<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#4_Short-Circuit_Rating_Can_Be_More_Important_Than_Normal_Load_Current\" >4. Short-Circuit Rating Can Be More Important Than Normal Load Current<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#5_GGD_vs_MNS_Which_Low-Voltage_Cabinet_Fits_the_Project\" >5. GGD vs MNS: Which Low-Voltage Cabinet Fits the Project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#6_Real_Project_Example_Harbin_Intelligent_Computing_Center\" >6. Real Project Example: Harbin Intelligent Computing Center<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#7_The_Hidden_Specification_Incoming_and_Outgoing_Feeders\" >7. The Hidden Specification: Incoming and Outgoing Feeders<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#8_Breaker_Configuration_ACB_MCCB_and_Protection\" >8. Breaker Configuration: ACB, MCCB and Protection<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#9_Busbar_Design_Matters\" >9. Busbar Design Matters<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#10_Cable_Entry_and_Cabinet_Layout_Can_Create_Site_Problems\" >10. Cable Entry and Cabinet Layout Can Create Site Problems<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#11_Do_You_Need_Reactive_Power_Compensation\" >11. Do You Need Reactive Power Compensation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#12_Standards_Testing_and_Documentation\" >12. Standards, Testing and Documentation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#13_Low-Voltage_Distribution_Cabinet_RFQ_Checklist\" >13. Low-Voltage Distribution Cabinet RFQ Checklist<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#Recommended_RFQ_Attachments\" >Recommended RFQ Attachments<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#Choose_DHDL_for_Your_Transformer_Solutions\" >Choose&nbsp;DHDL for Your Transformer Solutions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#1_What_is_a_low-voltage_distribution_cabinet_used_for\" >1. What is a low-voltage distribution cabinet used for?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#2_What_information_is_required_to_quote_a_low-voltage_distribution_cabinet\" >2. What information is required to quote a low-voltage distribution cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#3_What_is_the_difference_between_GGD_and_MNS_low-voltage_switchgear\" >3. What is the difference between GGD and MNS low-voltage switchgear?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#4_How_do_I_calculate_the_current_for_a_1000kVA_400V_transformer\" >4. How do I calculate the current for a 1,000kVA 400V transformer?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#5_Why_is_short-circuit_rating_important_for_an_LV_cabinet\" >5. Why is short-circuit rating important for an LV cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#6_Can_DHDL_integrate_low-voltage_cabinets_into_a_complete_substation\" >6. Can DHDL integrate low-voltage cabinets into a complete substation?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-15e58492\"><span class=\"ez-toc-section\" id=\"1_What_Is_a_Low-Voltage_Distribution_Cabinet\"><\/span>1. What Is a Low-Voltage Distribution Cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81b77dae\">A low-voltage distribution cabinet receives electrical power from a transformer or upstream low-voltage source and distributes it to downstream loads through protected outgoing circuits.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5ba74f52\">In a typical industrial power system, the electrical path may look like this:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3945921d\"><strong>Medium-Voltage Network \u2192 Transformer \u2192 Low-Voltage Main Cabinet \u2192 Distribution Feeders \u2192 Motors \/ Buildings \/ Equipment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7e7427fe\">Depending on the electrical design, a low-voltage cabinet may perform several functions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Substation-Power-Distribution-1.png\" data-type=\"attachment\" data-id=\"38519\">Power distribution<\/a><\/li>\n\n\n\n<li>Circuit protection<\/li>\n\n\n\n<li>Switching and isolation<\/li>\n\n\n\n<li>Electrical metering<\/li>\n\n\n\n<li>Motor feeder control<\/li>\n\n\n\n<li>Power-factor correction<\/li>\n\n\n\n<li>Automatic transfer<\/li>\n\n\n\n<li>Local or remote monitoring<\/li>\n\n\n\n<li>Connection to downstream distribution panels<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cbffb85c\">DHDL&#8217;s<a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/ggd-low-voltage-distribution-cabinet-for-power-distribution\/\" data-type=\"product\" data-id=\"37463\"> <strong>GGD low-voltage cabinet<\/strong><\/a> is designed for low-voltage power distribution, control, protection, and metering in industrial, commercial, and public-building power systems. Cabinet dimensions, incoming and outgoing circuits, breaker configurations, busbar systems, protection levels, and standards can be customized according to the project.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-426aa058\"><span class=\"ez-toc-section\" id=\"2_Key_Specifications_Buyers_Should_Confirm\"><\/span>2. Key Specifications Buyers Should Confirm<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f190dced\">Voltage alone does not define a low-voltage cabinet.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-ed0667a6\"><img decoding=\"async\" width=\"1536\" height=\"1024\" class=\"wp-image-38715 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-400x267.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-1200x800.png 1200w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-768x512.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-18x12.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-430x287.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-700x467.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-150x100.png 150w\" data-sizes=\"(max-width: 1536px) 100vw, 1536px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1536px; --smush-placeholder-aspect-ratio: 1536\/1024;\" \/><\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-777ccc24\">Before requesting a quotation, buyers should provide the main electrical parameters.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Parameter<\/th><th>Example Project Requirement<\/th><\/tr><\/thead><tbody><tr><td>System Voltage<\/td><td>400 \/ 415V<\/td><\/tr><tr><td>Fr\u00e9quence<\/td><td>50Hz<\/td><\/tr><tr><td>Phase<\/td><td>3 Phase + N + PE<\/td><\/tr><tr><td>Main Bus Current<\/td><td>2500A<\/td><\/tr><tr><td>Incoming Breaker<\/td><td>2500A ACB<\/td><\/tr><tr><td>Outgoing Feeders<\/td><td>Project Specific<\/td><\/tr><tr><td>Short-Circuit Rating<\/td><td>According to System Study<\/td><\/tr><tr><td>Busbar Material<\/td><td>Copper<\/td><\/tr><tr><td>Cabinet Type<\/td><td>GGD \/ MNS \/ Project Specific<\/td><\/tr><tr><td>Installation<\/td><td>Indoor<\/td><\/tr><tr><td>Cable Entry<\/td><td>Bottom<\/td><\/tr><tr><td>Protection Level<\/td><td>Project Specific<\/td><\/tr><tr><td>Metering<\/td><td>Multifunction Meter<\/td><\/tr><tr><td>Communication<\/td><td>Project Specific<\/td><\/tr><tr><td>Standard<\/td><td>IEC \/ Project Specification<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0b4ecc73\">The final values must be determined from the project&#8217;s electrical design rather than copied from another installation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5085b175\">Three specifications deserve particular attention: <strong>rated current, short-circuit rating, and feeder configuration<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-a114c49c\"><span class=\"ez-toc-section\" id=\"3_Rated_Current_Do_Not_Select_It_from_Transformer_kVA_Alone\"><\/span>3. Rated Current: Do Not Select It from Transformer kVA Alone<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c5ffc7c3\">Suppose a project uses a <strong>1,000kVA, 10\/0.4kV transformer<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-076e0809\">The approximate full-load secondary current is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9d8e780a\"><strong>I = 1000 \u00d7 1000 \u00f7 (\u221a3 \u00d7 400) \u2248 1,443A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1852e8cf\">This does not automatically mean that a 1,500A cabinet is the correct choice.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-368ecef6\">The engineer should also consider:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer overload capability<\/li>\n\n\n\n<li>Actual maximum demand<\/li>\n\n\n\n<li>Ambient temperature<\/li>\n\n\n\n<li>Busbar temperature rise<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Parallel transformer operation<\/li>\n\n\n\n<li>Diversity factor<\/li>\n\n\n\n<li>Main breaker rating<\/li>\n\n\n\n<li>Cable capacity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9c4b36a3\">A project expecting future load growth may therefore require a higher busbar rating than the transformer&#8217;s present operating current suggests.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81d56e73\"><strong>Hidden buyer tip:<\/strong> Ask whether the quoted current refers to the <strong>main busbar rating, incoming breaker rating, or actual load current<\/strong>. They are related, but they are not automatically the same number.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-59fbd4a2\"><span class=\"ez-toc-section\" id=\"4_Short-Circuit_Rating_Can_Be_More_Important_Than_Normal_Load_Current\"><\/span>4. Short-Circuit Rating Can Be More Important Than Normal Load Current<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4d4784c7\">This is one of the specifications buyers frequently overlook.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-511774da\">The cabinet must not only carry normal operating current. It must also withstand the electrical and thermal stress associated with a fault until the protection system clears it.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f75ad3b8\">The required short-circuit rating depends on factors such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer capacity<\/li>\n\n\n\n<li>Transformer impedance<\/li>\n\n\n\n<li>System voltage<\/li>\n\n\n\n<li>Cable impedance<\/li>\n\n\n\n<li>Parallel transformer operation<\/li>\n\n\n\n<li>Upstream network strength<\/li>\n\n\n\n<li>Protection clearing time<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b7c27b5f\">For example, two 400V systems carrying similar normal load current can have very different prospective fault currents if one is supplied by a small transformer and the other by multiple large transformers operating in parallel.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2924a4b4\">Therefore, do not write only:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a718f9d4\"><strong>Rated Current: 2500A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2ddd4aa6\">Also provide the calculated fault level or required short-time withstand and breaking capability according to the project design.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-90e524f7\">This allows the manufacturer to select the correct breaker and busbar system.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-c3777537\"><span class=\"ez-toc-section\" id=\"5_GGD_vs_MNS_Which_Low-Voltage_Cabinet_Fits_the_Project\"><\/span>5. GGD vs MNS: Which Low-Voltage Cabinet Fits the Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bcacc492\">Not every project needs the same cabinet structure.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-73b32cbe\">DHDL&#8217;s portfolio and published project information include both GGD low-voltage distribution cabinets and MNS withdrawable switchgear.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1a5385e2\">A simplified purchasing comparison is:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Feature<\/th><th>GGD Cabinet<\/th><th><a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/mns-low-voltage-withdrawable-switchgear-for-power-distribution\/\" data-type=\"product\" data-id=\"37466\">MNS Withdrawable Switchgear<\/a><\/th><\/tr><\/thead><tbody><tr><td>Structure<\/td><td>Fixed-type distribution cabinet<\/td><td>Modular withdrawable system<\/td><\/tr><tr><td>Typical Use<\/td><td>General distribution<\/td><td>More complex distribution systems<\/td><\/tr><tr><td>Maintenance<\/td><td>Conventional fixed arrangement<\/td><td>Withdrawable functional units can simplify servicing<\/td><\/tr><tr><td>Configuration<\/td><td>Incoming\/outgoing distribution<\/td><td>Multiple functional feeders<\/td><\/tr><tr><td>Typical Projects<\/td><td>Factories, buildings, general distribution<\/td><td>Data centers, larger industrial systems, critical loads<\/td><\/tr><tr><td>Customization<\/td><td>Breakers, busbars, feeders, enclosure<\/td><td>Feeders, drawers, protection, metering, control<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-90bd8247\">This does not mean MNS is automatically \u201cbetter\u201d than GGD.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d81c0f1e\">The correct choice depends on:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-54a33a72\"><strong>System Architecture + Maintenance Strategy + Reliability Requirement + Number of Feeders + Project Budget<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-99cd118c\">A straightforward factory distribution system may not need the same cabinet architecture as a 24\/7 data center.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-ed60cbb1\"><span class=\"ez-toc-section\" id=\"6_Real_Project_Example_Harbin_Intelligent_Computing_Center\"><\/span>6. Real Project Example: <a href=\"https:\/\/dinghongtransformer.com\/fr\/project\/harbin-intelligent-computing-center-phase-i-power-distribution-system-project\/\" data-type=\"page\" data-id=\"37334\">Harbin Intelligent Computing Center<\/a><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bef8f51e\">A useful example of low-voltage switchgear in a critical-load application comes from DHDL&#8217;s Harbin Intelligent Computing Center Phase I project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0c7461e8\">The published project information describes approximately <strong>18MW of new IT load<\/strong>, around <strong>1,800 additional cabinets<\/strong>, and a total project capacity of <strong>40MVA<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7855fcd7\">The electrical architecture uses dual power supplies, double busbars, and N+1 redundancy to support continuous data-center operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e004cdd4\">The equipment scope included:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Equipment<\/th><th>Project Configuration<\/th><\/tr><\/thead><tbody><tr><td>Dry-Type Transformers<\/td><td>16 Units<\/td><\/tr><tr><td>Transformer Capacity<\/td><td>2500kVA Each<\/td><\/tr><tr><td>KYN28A-12 MV Switchgear<\/td><td>32 Panels<\/td><\/tr><tr><td>MNS Low-Voltage Switchgear<\/td><td>156 Panels<\/td><\/tr><tr><td>IT Load<\/td><td>Approx. 18MW<\/td><\/tr><tr><td>Total Capacity<\/td><td>40MVA<\/td><\/tr><tr><td>Power Architecture<\/td><td>Dual Supply + Double Busbar<\/td><\/tr><tr><td>Redundancy<\/td><td>N+1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6265d526\">The MNS cabinets were used for low-voltage distribution supporting data-center operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5322e6f8\">This project illustrates why cabinet selection cannot be based on rated voltage alone.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-94486b06\">For a data center, buyers also need to consider:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Power-supply redundancy<\/li>\n\n\n\n<li>Bus segmentation<\/li>\n\n\n\n<li>Maintenance without unnecessary service interruption<\/li>\n\n\n\n<li>Protection coordination<\/li>\n\n\n\n<li>Monitoring<\/li>\n\n\n\n<li>Feeder organization<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Environmental conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-56941415\">In Harbin, the low-temperature environment was another project consideration, with winter temperatures approaching approximately \u221230\u00b0C according to DHDL&#8217;s project description.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5bb14ec4\"><span class=\"ez-toc-section\" id=\"7_The_Hidden_Specification_Incoming_and_Outgoing_Feeders\"><\/span>7. The Hidden Specification: Incoming and Outgoing Feeders<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-864b1af5\">A common RFQ might say:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6efbf554\"><strong>\u201cNeed 10 low-voltage cabinets, 400V, 2500A.\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-719f13eb\">That still does not define the actual cabinet lineup.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3949b3df\">The manufacturer needs the <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/single-phase-pad-mounted-transformer-buyers-guide\/\" data-type=\"post\" data-id=\"38057\">single-line diagram <\/a>(SLD)<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fe7b34bc\">The SLD should identify:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Incoming circuits<\/li>\n\n\n\n<li>Bus sections<\/li>\n\n\n\n<li>Bus coupler<\/li>\n\n\n\n<li>Outgoing feeders<\/li>\n\n\n\n<li>Motor feeders<\/li>\n\n\n\n<li>Capacitor compensation<\/li>\n\n\n\n<li>ATS requirements<\/li>\n\n\n\n<li>Metering circuits<\/li>\n\n\n\n<li>Spare feeders<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Generator or backup supply interfaces<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1124f2e5\">For example, one 2500A incoming cabinet may supply several different outgoing circuits.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-01a9a83b\">These feeders may require different breaker ratings, protection functions, metering, and cable connections.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-086cd123\">Without an SLD, two suppliers may quote completely different scopes even when both quotations say <strong>\u201c2500A Low-Voltage Cabinet.\u201d<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-644f6308\"><span class=\"ez-toc-section\" id=\"8_Breaker_Configuration_ACB_MCCB_and_Protection\"><\/span>8. Breaker Configuration: ACB, MCCB and Protection<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9cb3d6ca\">Circuit breakers should be selected according to the duty of each circuit.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f5f365bd\">A typical project may use:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ACB for main incomers<\/li>\n\n\n\n<li>ACB for bus couplers<\/li>\n\n\n\n<li>MCCB for larger outgoing feeders<\/li>\n\n\n\n<li>MCCB or other protective devices for smaller circuits<\/li>\n\n\n\n<li>Dedicated motor protection where required<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e5bff959\">The exact selection depends on current, fault level, protection coordination, operating sequence, and project requirements.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c589c5f9\">Buyers should define whether they require functions such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Overload protection<\/li>\n\n\n\n<li>Short-circuit protection<\/li>\n\n\n\n<li>Ground-fault protection<\/li>\n\n\n\n<li>Undervoltage protection<\/li>\n\n\n\n<li>Overvoltage monitoring<\/li>\n\n\n\n<li>Remote trip<\/li>\n\n\n\n<li>Shunt trip<\/li>\n\n\n\n<li>Electrical interlocking<\/li>\n\n\n\n<li>Mechanical interlocking<\/li>\n\n\n\n<li>Communication interface<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-60bff139\"><strong>Hidden procurement issue:<\/strong> The breaker brand and protection trip unit can significantly affect cabinet price.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d708d323\">When comparing quotations, make sure suppliers are quoting equivalent breaker specifications rather than comparing only cabinet dimensions and rated current.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-c571d3a4\"><span class=\"ez-toc-section\" id=\"9_Busbar_Design_Matters\"><\/span>9. Busbar Design Matters<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aabd92e9\">The busbar is the main current-carrying path inside the cabinet.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5a9821fe\">Buyers should confirm:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rated busbar current<\/li>\n\n\n\n<li>Copper or aluminum<\/li>\n\n\n\n<li>Neutral busbar requirements<\/li>\n\n\n\n<li>PE busbar requirements<\/li>\n\n\n\n<li>Short-time withstand rating<\/li>\n\n\n\n<li>Busbar arrangement<\/li>\n\n\n\n<li>Temperature-rise requirements<\/li>\n\n\n\n<li>Surface treatment if required<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a8381895\">For nonlinear loads such as data centers, UPS systems, LED lighting, and certain electronic equipment, neutral-current and harmonic conditions may also require engineering review.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-17d03306\">Do not automatically assume the neutral conductor should be designed only from the phase current without checking the actual load characteristics.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-6e5be060\"><span class=\"ez-toc-section\" id=\"10_Cable_Entry_and_Cabinet_Layout_Can_Create_Site_Problems\"><\/span>10. Cable Entry and Cabinet Layout Can Create Site Problems<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e186cc6c\">A cabinet can be electrically correct and still be difficult to install.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-32dd35c2\">Before production, confirm:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Top or bottom cable entry<\/li>\n\n\n\n<li>Cable trench position<\/li>\n\n\n\n<li>Incoming cable quantity<\/li>\n\n\n\n<li>Cable cross-section<\/li>\n\n\n\n<li>Cable bending radius<\/li>\n\n\n\n<li>Front access<\/li>\n\n\n\n<li>Rear access<\/li>\n\n\n\n<li>Cabinet lineup length<\/li>\n\n\n\n<li>Cabinet height and depth<\/li>\n\n\n\n<li>Wall clearance<\/li>\n\n\n\n<li>Maintenance space<\/li>\n\n\n\n<li>Future extension direction<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4fe94ee9\">This is especially important when the low-voltage cabinet is integrated into a <strong>prefabricated substation cabin<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-62092bf6\">DHDL&#8217;s prefabricated cabin guidance notes that low-voltage configuration may depend on rated voltage, main bus current, outgoing feeders, circuit-breaker requirements, motor loads, metering, power-factor correction, automatic transfer, external cable arrangement, and future feeder reserves.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-7341f400\"><span class=\"ez-toc-section\" id=\"11_Do_You_Need_Reactive_Power_Compensation\"><\/span>11. Do You Need Reactive Power Compensation?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-259d0abe\">Industrial facilities with motors, pumps, compressors, HVAC equipment, and other inductive loads may operate with a lower power factor.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9a4cd350\">In these cases, a <strong>reactive power compensation cabinet<\/strong> may be incorporated into the low-voltage system.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d0a62585\">DHDL&#8217;s GGJ low-voltage reactive power compensation cabinet uses capacitors, controllers, switching devices, protection components, and monitoring units to adjust reactive power according to load changes.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8247d068\">When requesting compensation equipment, provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>System voltage<\/li>\n\n\n\n<li>Existing power factor<\/li>\n\n\n\n<li>Target power factor<\/li>\n\n\n\n<li>Active load<\/li>\n\n\n\n<li>Required compensation capacity<\/li>\n\n\n\n<li>Harmonic conditions<\/li>\n\n\n\n<li>Load fluctuation<\/li>\n\n\n\n<li>Capacitor configuration requirements<\/li>\n\n\n\n<li>Controller requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-84dbc7d7\">Do not select capacitor capacity only from transformer kVA.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-05b95356\">The actual load profile and harmonic environment should be reviewed first.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5bb7177d\"><span class=\"ez-toc-section\" id=\"12_Standards_Testing_and_Documentation\"><\/span>12. Standards, Testing and Documentation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4969820d\">For international projects, buyers should specify the applicable standard at the beginning of the RFQ.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e4c8ba92\">DHDL states that its power equipment can be adapted to IEC, ANSI, and project-specific technical requirements.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-253f86ff\">Depending on the project, buyers should request relevant inspection and verification documentation for the cabinet configuration.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-02175b0a\">The technical document package may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Approved single-line diagram<\/li>\n\n\n\n<li>Cabinet arrangement drawing<\/li>\n\n\n\n<li>Technical datasheet<\/li>\n\n\n\n<li>Component list<\/li>\n\n\n\n<li>Busbar information<\/li>\n\n\n\n<li>Wiring diagram<\/li>\n\n\n\n<li>Terminal diagram<\/li>\n\n\n\n<li>Nameplate information<\/li>\n\n\n\n<li>Test reports<\/li>\n\n\n\n<li>Packing list<\/li>\n\n\n\n<li>Installation documentation<\/li>\n\n\n\n<li>Operation and maintenance manual<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-34914c32\">DHDL&#8217;s website also lists an <strong>MNS Switchgear Type Test Report<\/strong> among its quality and compliance materials.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ed2c8864\">For export projects, confirm documentation requirements before production rather than asking for additional files immediately before shipment.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0e88a2ee\"><span class=\"ez-toc-section\" id=\"13_Low-Voltage_Distribution_Cabinet_RFQ_Checklist\"><\/span>13. Low-Voltage Distribution Cabinet RFQ Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-da726886\">Before requesting a quotation, prepare the following information:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>RFQ Item<\/th><th>Buyer Input<\/th><\/tr><\/thead><tbody><tr><td>Application<\/td><td>__________<\/td><\/tr><tr><td>System Voltage<\/td><td>_____ V<\/td><\/tr><tr><td>Fr\u00e9quence<\/td><td>50 \/ 60Hz<\/td><\/tr><tr><td>Phase<\/td><td>__________<\/td><\/tr><tr><td>Main Bus Current<\/td><td>_____ A<\/td><\/tr><tr><td>Incoming Breaker<\/td><td>__________<\/td><\/tr><tr><td>Outgoing Feeders<\/td><td>__________<\/td><\/tr><tr><td>Short-Circuit Level<\/td><td>_____ kA<\/td><\/tr><tr><td>Cabinet Type<\/td><td>GGD \/ MNS \/ Other<\/td><\/tr><tr><td>Busbar Material<\/td><td>Cu \/ Al<\/td><\/tr><tr><td>Cable Entry<\/td><td>Top \/ Bottom<\/td><\/tr><tr><td>Installation<\/td><td>Indoor \/ Outdoor<\/td><\/tr><tr><td>IP Rating<\/td><td>__________<\/td><\/tr><tr><td>Metering<\/td><td>__________<\/td><\/tr><tr><td>Protection Functions<\/td><td>__________<\/td><\/tr><tr><td>Communication<\/td><td>__________<\/td><\/tr><tr><td>Compensation Requirement<\/td><td>_____ kvar<\/td><\/tr><tr><td>Applicable Standard<\/td><td>__________<\/td><\/tr><tr><td>Quantity<\/td><td>_____ Panels<\/td><\/tr><tr><td>Destination<\/td><td>__________<\/td><\/tr><tr><td>Required Delivery<\/td><td>__________<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-f3725f61\"><span class=\"ez-toc-section\" id=\"Recommended_RFQ_Attachments\"><\/span><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-rfq-checklist-specifications-buyers-must-provide-for-an-accurate-quote\/\" data-type=\"post\" data-id=\"38577\">Recommended RFQ Attachments<\/a><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-55532d14\">Whenever possible, attach:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Single-Line Diagram<\/li>\n\n\n\n<li>Load schedule<\/li>\n\n\n\n<li>Transformer specifications<\/li>\n\n\n\n<li>Short-circuit calculation<\/li>\n\n\n\n<li>Protection philosophy<\/li>\n\n\n\n<li>Cable schedule<\/li>\n\n\n\n<li>Power-room layout<\/li>\n\n\n\n<li>Required component brands<\/li>\n\n\n\n<li>Metering requirements<\/li>\n\n\n\n<li>Communication requirements<\/li>\n\n\n\n<li>Applicable technical standard<\/li>\n\n\n\n<li>Tender specification<\/li>\n\n\n\n<li>Project schedule<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-00b4bdb1\">For substations and switchgear projects, DHDL specifically recommends providing the <strong>SLD, IP rating, site conditions, and project schedule<\/strong> to support technical confirmation.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-1032f7ba\"><span class=\"ez-toc-section\" id=\"Choose_DHDL_for_Your_Transformer_Solutions\"><\/span>Choose&nbsp;<a href=\"https:\/\/dinghongtransformer.com\/fr\/\">DHDL for Your Transformer Solutions<\/a><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1eb05c78\">DHDL is a professional transformer manufacturer specializing in<a href=\"https:\/\/dinghongtransformer.com\/fr\/shop\/\"><mark>dry-type transformers, oil-immersed transformers, power transformers, distribution transformers, and complete power distribution solutions.<\/mark><\/a><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4f29f39d\">We support customized transformer designs based on\u00a0<a href=\"https:\/\/dinghongtransformer.com\/fr\/tag\/project\/\"><strong><mark>project voltage<\/mark><\/strong><\/a>, capacity, frequency, installation environment, and international standards.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d159ce56\">Whether for industrial facilities, renewable energy projects, data centers, utilities, or infrastructure applications, DHDL delivers reliable, efficient, and customized power solutions worldwide.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-31c455ed\"><a href=\"https:\/\/dinghongtransformer.com\/fr\/contactez-nous\/\"><strong><mark>Contact DHDL today for professional transformer selection support and a customized quotation.<\/mark><\/strong><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5569e9e7\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-137e14cd\"><span class=\"ez-toc-section\" id=\"1_What_is_a_low-voltage_distribution_cabinet_used_for\"><\/span>1. What is a low-voltage distribution cabinet used for?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2c59580e\">A low-voltage distribution cabinet receives power from a transformer or upstream source and distributes it to downstream electrical loads.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aaf7ee3b\">Depending on the project, it can provide switching, protection, metering, control, feeder distribution, and monitoring functions. DHDL&#8217;s GGD cabinet is designed for industrial, commercial, and public-building power systems.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-66f17a27\"><span class=\"ez-toc-section\" id=\"2_What_information_is_required_to_quote_a_low-voltage_distribution_cabinet\"><\/span>2. What information is required to quote a low-voltage distribution cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c04488c1\">Provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>System voltage<\/li>\n\n\n\n<li>Fr\u00e9quence<\/li>\n\n\n\n<li>Rated current<\/li>\n\n\n\n<li>Short-circuit level<\/li>\n\n\n\n<li>Incoming breaker<\/li>\n\n\n\n<li>Outgoing feeders<\/li>\n\n\n\n<li>Busbar requirements<\/li>\n\n\n\n<li>Cable-entry direction<\/li>\n\n\n\n<li>IP rating<\/li>\n\n\n\n<li>Protection requirements<\/li>\n\n\n\n<li>Applicable standard<\/li>\n\n\n\n<li>Quantity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3c977951\">A Single-Line Diagram is strongly recommended.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-87ad1219\"><span class=\"ez-toc-section\" id=\"3_What_is_the_difference_between_GGD_and_MNS_low-voltage_switchgear\"><\/span>3. What is the difference between GGD and MNS low-voltage switchgear?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-096459f5\">GGD is generally used as a fixed low-voltage distribution cabinet, while MNS uses a modular withdrawable structure that can be suitable for more complex systems and applications requiring flexible feeder organization and maintenance.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d4e3a84c\">The final choice should follow the approved electrical design rather than cabinet type alone.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-8b96b0e9\"><span class=\"ez-toc-section\" id=\"4_How_do_I_calculate_the_current_for_a_1000kVA_400V_transformer\"><\/span>4. How do I calculate the current for a 1,000kVA 400V transformer?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9fa23118\">For a three-phase system:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-034cf01c\"><strong>I = S \u00f7 (\u221a3 \u00d7 V)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bd185dcb\">For a 1,000kVA transformer at 400V, the approximate full-load current is <strong>1,443A<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-39a0f5aa\">However, the final cabinet and busbar rating should also consider overload, temperature, future expansion, protection coordination, and project requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-121ef68a\"><span class=\"ez-toc-section\" id=\"5_Why_is_short-circuit_rating_important_for_an_LV_cabinet\"><\/span>5. Why is short-circuit rating important for an LV cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-870ed87a\">The cabinet and breakers must safely withstand and interrupt fault conditions according to the electrical system design.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ea6f7cad\">Fault current can depend on transformer capacity, transformer impedance, network configuration, cables, and whether transformers operate in parallel.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-7ad6be6d\"><span class=\"ez-toc-section\" id=\"6_Can_DHDL_integrate_low-voltage_cabinets_into_a_complete_substation\"><\/span>6. Can DHDL integrate low-voltage cabinets into a complete substation?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-eb07c97c\">Yes. DHDL&#8217;s prefabricated substation cabin solution can integrate transformers, high-voltage switchgear, low-voltage switchgear, metering, protection, control, and monitoring equipment in a modular enclosure.<\/p>","protected":false},"excerpt":{"rendered":"<p>Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.<\/p>","protected":false},"author":1,"featured_media":38714,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-38713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-18T04:12:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-18T04:12:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide\",\"datePublished\":\"2026-09-18T04:12:09+00:00\",\"dateModified\":\"2026-09-18T04:12:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"},\"wordCount\":2137,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\",\"name\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"datePublished\":\"2026-09-18T04:12:09+00:00\",\"dateModified\":\"2026-09-18T04:12:23+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"width\":1536,\"height\":1024,\"caption\":\"Low-Voltage Distribution Cabinet\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/fr\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","og_locale":"fr_FR","og_type":"article","og_title":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","og_description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","og_url":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-09-18T04:12:09+00:00","article_modified_time":"2026-09-18T04:12:23+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"DHDL","Dur\u00e9e de lecture estim\u00e9e":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide","datePublished":"2026-09-18T04:12:09+00:00","dateModified":"2026-09-18T04:12:23+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"},"wordCount":2137,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","articleSection":["Blog"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/","url":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/","name":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","datePublished":"2026-09-18T04:12:09+00:00","dateModified":"2026-09-18T04:12:23+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","width":1536,"height":1024,"caption":"Low-Voltage Distribution Cabinet"},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrique des transformateurs, des armoires de distribution haute et basse tension, des sous-stations pr\u00e9fabriqu\u00e9es, des armoires de stockage d'\u00e9nergie et des \u00e9quipements de recharge pour VE destin\u00e9s aux projets de services publics, industriels et d'\u00e9nergies nouvelles dans le monde entier.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/fr\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=38713"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713\/revisions"}],"predecessor-version":[{"id":38717,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713\/revisions\/38717"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media\/38714"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=38713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=38713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=38713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}