{"id":38713,"date":"2026-09-18T04:12:09","date_gmt":"2026-09-18T04:12:09","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=38713"},"modified":"2026-09-18T04:12:23","modified_gmt":"2026-09-18T04:12:23","slug":"low-voltage-distribution-cabinet","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","title":{"rendered":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide"},"content":{"rendered":"<p class=\"wp-block-wd-paragraph wd-7a9bb216\">A <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/ggd-low-voltage-distribution-cabinet-for-power-distribution\/\" data-type=\"product\" data-id=\"37463\">low-voltage distribution cabinet<\/a><\/strong> is one of the last major stages between a transformer and the electrical loads inside a factory, commercial building, data center, industrial park, or infrastructure project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f8e1b420\">Its job is not simply to \u201cdistribute electricity.\u201d<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-24391cb3\">A properly designed low-voltage cabinet must distribute power safely, isolate faults, protect outgoing circuits, support metering and control, and leave enough capacity for future loads.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e7f669d3\">This means buyers should not request a quotation by saying only:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c8882d4c\"><strong>\u201cWe need a 400V low-voltage distribution cabinet.\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7c286db3\">The manufacturer still needs to know the rated current, short-circuit level, number of feeders, breaker configuration, busbar requirements, protection functions, cable arrangement, IP rating, installation environment, and applicable standards.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6a955aba\">DHDL manufactures low-voltage distribution equipment as part of its transformer and power-distribution portfolio, with project-specific customization for industrial, commercial, utility, renewable-energy, and data-center applications.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5011dc07\">This guide explains the technical parameters buyers should confirm before purchasing a <strong>low-voltage distribution cabinet<\/strong>, including several details that are frequently missed during the RFQ stage.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table des mati\u00e8res<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#1_What_Is_a_Low-Voltage_Distribution_Cabinet\" >1. What Is a Low-Voltage Distribution Cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#2_Key_Specifications_Buyers_Should_Confirm\" >2. Key Specifications Buyers Should Confirm<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#3_Rated_Current_Do_Not_Select_It_from_Transformer_kVA_Alone\" >3. Rated Current: Do Not Select It from Transformer kVA Alone<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#4_Short-Circuit_Rating_Can_Be_More_Important_Than_Normal_Load_Current\" >4. Short-Circuit Rating Can Be More Important Than Normal Load Current<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#5_GGD_vs_MNS_Which_Low-Voltage_Cabinet_Fits_the_Project\" >5. GGD vs MNS: Which Low-Voltage Cabinet Fits the Project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#6_Real_Project_Example_Harbin_Intelligent_Computing_Center\" >6. Real Project Example: Harbin Intelligent Computing Center<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#7_The_Hidden_Specification_Incoming_and_Outgoing_Feeders\" >7. The Hidden Specification: Incoming and Outgoing Feeders<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#8_Breaker_Configuration_ACB_MCCB_and_Protection\" >8. Breaker Configuration: ACB, MCCB and Protection<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#9_Busbar_Design_Matters\" >9. Busbar Design Matters<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#10_Cable_Entry_and_Cabinet_Layout_Can_Create_Site_Problems\" >10. Cable Entry and Cabinet Layout Can Create Site Problems<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#11_Do_You_Need_Reactive_Power_Compensation\" >11. Do You Need Reactive Power Compensation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#12_Standards_Testing_and_Documentation\" >12. Standards, Testing and Documentation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#13_Low-Voltage_Distribution_Cabinet_RFQ_Checklist\" >13. Low-Voltage Distribution Cabinet RFQ Checklist<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#Recommended_RFQ_Attachments\" >Recommended RFQ Attachments<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#Choose_DHDL_for_Your_Transformer_Solutions\" >Choisissez DHDL pour vos solutions de transformateurs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#1_What_is_a_low-voltage_distribution_cabinet_used_for\" >1. What is a low-voltage distribution cabinet used for?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#2_What_information_is_required_to_quote_a_low-voltage_distribution_cabinet\" >2. What information is required to quote a low-voltage distribution cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#3_What_is_the_difference_between_GGD_and_MNS_low-voltage_switchgear\" >3. What is the difference between GGD and MNS low-voltage switchgear?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#4_How_do_I_calculate_the_current_for_a_1000kVA_400V_transformer\" >4. How do I calculate the current for a 1,000kVA 400V transformer?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#5_Why_is_short-circuit_rating_important_for_an_LV_cabinet\" >5. Why is short-circuit rating important for an LV cabinet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/#6_Can_DHDL_integrate_low-voltage_cabinets_into_a_complete_substation\" >6. Can DHDL integrate low-voltage cabinets into a complete substation?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-15e58492\"><span class=\"ez-toc-section\" id=\"1_What_Is_a_Low-Voltage_Distribution_Cabinet\"><\/span>1. What Is a Low-Voltage Distribution Cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81b77dae\">A low-voltage distribution cabinet receives electrical power from a transformer or upstream low-voltage source and distributes it to downstream loads through protected outgoing circuits.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5ba74f52\">In a typical industrial power system, the electrical path may look like this:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3945921d\"><strong>Medium-Voltage Network \u2192 Transformer \u2192 Low-Voltage Main Cabinet \u2192 Distribution Feeders \u2192 Motors \/ Buildings \/ Equipment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7e7427fe\">Depending on the electrical design, a low-voltage cabinet may perform several functions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Substation-Power-Distribution-1.png\" data-type=\"attachment\" data-id=\"38519\">Distribution d'\u00e9nergie<\/a><\/li>\n\n\n\n<li>Circuit protection<\/li>\n\n\n\n<li>Switching and isolation<\/li>\n\n\n\n<li>Electrical metering<\/li>\n\n\n\n<li>Motor feeder control<\/li>\n\n\n\n<li>Power-factor correction<\/li>\n\n\n\n<li>Automatic transfer<\/li>\n\n\n\n<li>Local or remote monitoring<\/li>\n\n\n\n<li>Connection to downstream distribution panels<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cbffb85c\">DHDL&#8217;s<a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/ggd-low-voltage-distribution-cabinet-for-power-distribution\/\" data-type=\"product\" data-id=\"37463\"> <strong>GGD low-voltage cabinet<\/strong><\/a> is designed for low-voltage power distribution, control, protection, and metering in industrial, commercial, and public-building power systems. Cabinet dimensions, incoming and outgoing circuits, breaker configurations, busbar systems, protection levels, and standards can be customized according to the project.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-426aa058\"><span class=\"ez-toc-section\" id=\"2_Key_Specifications_Buyers_Should_Confirm\"><\/span>2. Key Specifications Buyers Should Confirm<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f190dced\">Voltage alone does not define a low-voltage cabinet.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-ed0667a6\"><img decoding=\"async\" width=\"1536\" height=\"1024\" class=\"wp-image-38715 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-400x267.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-1200x800.png 1200w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-768x512.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-18x12.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-430x287.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-700x467.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet-content-150x100.png 150w\" data-sizes=\"(max-width: 1536px) 100vw, 1536px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1536px; --smush-placeholder-aspect-ratio: 1536\/1024;\" \/><\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-777ccc24\">Before requesting a quotation, buyers should provide the main electrical parameters.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Parameter<\/th><th>Example Project Requirement<\/th><\/tr><\/thead><tbody><tr><td>System Voltage<\/td><td>400 \/ 415V<\/td><\/tr><tr><td>Fr\u00e9quence<\/td><td>50Hz<\/td><\/tr><tr><td>Phase<\/td><td>3 Phase + N + PE<\/td><\/tr><tr><td>Main Bus Current<\/td><td>2500A<\/td><\/tr><tr><td>Incoming Breaker<\/td><td>2500A ACB<\/td><\/tr><tr><td>Outgoing Feeders<\/td><td>Project Specific<\/td><\/tr><tr><td>Short-Circuit Rating<\/td><td>According to System Study<\/td><\/tr><tr><td>Busbar Material<\/td><td>Copper<\/td><\/tr><tr><td>Cabinet Type<\/td><td>GGD \/ MNS \/ Project Specific<\/td><\/tr><tr><td>Installation<\/td><td>Indoor<\/td><\/tr><tr><td>Cable Entry<\/td><td>Bottom<\/td><\/tr><tr><td>Protection Level<\/td><td>Project Specific<\/td><\/tr><tr><td>Metering<\/td><td>Multifunction Meter<\/td><\/tr><tr><td>Communication<\/td><td>Project Specific<\/td><\/tr><tr><td>Standard<\/td><td>IEC \/ Project Specification<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0b4ecc73\">The final values must be determined from the project&#8217;s electrical design rather than copied from another installation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5085b175\">Three specifications deserve particular attention: <strong>rated current, short-circuit rating, and feeder configuration<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-a114c49c\"><span class=\"ez-toc-section\" id=\"3_Rated_Current_Do_Not_Select_It_from_Transformer_kVA_Alone\"><\/span>3. Rated Current: Do Not Select It from Transformer kVA Alone<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c5ffc7c3\">Suppose a project uses a <strong>1,000kVA, 10\/0.4kV transformer<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-076e0809\">The approximate full-load secondary current is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9d8e780a\"><strong>I = 1000 \u00d7 1000 \u00f7 (\u221a3 \u00d7 400) \u2248 1,443A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1852e8cf\">This does not automatically mean that a 1,500A cabinet is the correct choice.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-368ecef6\">The engineer should also consider:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer overload capability<\/li>\n\n\n\n<li>Actual maximum demand<\/li>\n\n\n\n<li>Ambient temperature<\/li>\n\n\n\n<li>Busbar temperature rise<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Parallel transformer operation<\/li>\n\n\n\n<li>Diversity factor<\/li>\n\n\n\n<li>Main breaker rating<\/li>\n\n\n\n<li>Cable capacity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9c4b36a3\">A project expecting future load growth may therefore require a higher busbar rating than the transformer&#8217;s present operating current suggests.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-81d56e73\"><strong>Hidden buyer tip:<\/strong> Ask whether the quoted current refers to the <strong>main busbar rating, incoming breaker rating, or actual load current<\/strong>. They are related, but they are not automatically the same number.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-59fbd4a2\"><span class=\"ez-toc-section\" id=\"4_Short-Circuit_Rating_Can_Be_More_Important_Than_Normal_Load_Current\"><\/span>4. Short-Circuit Rating Can Be More Important Than Normal Load Current<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4d4784c7\">This is one of the specifications buyers frequently overlook.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-511774da\">The cabinet must not only carry normal operating current. It must also withstand the electrical and thermal stress associated with a fault until the protection system clears it.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f75ad3b8\">The required short-circuit rating depends on factors such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer capacity<\/li>\n\n\n\n<li>Transformer impedance<\/li>\n\n\n\n<li>System voltage<\/li>\n\n\n\n<li>Cable impedance<\/li>\n\n\n\n<li>Parallel transformer operation<\/li>\n\n\n\n<li>Upstream network strength<\/li>\n\n\n\n<li>Protection clearing time<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b7c27b5f\">For example, two 400V systems carrying similar normal load current can have very different prospective fault currents if one is supplied by a small transformer and the other by multiple large transformers operating in parallel.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2924a4b4\">Therefore, do not write only:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a718f9d4\"><strong>Rated Current: 2500A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2ddd4aa6\">Also provide the calculated fault level or required short-time withstand and breaking capability according to the project design.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-90e524f7\">This allows the manufacturer to select the correct breaker and busbar system.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-c3777537\"><span class=\"ez-toc-section\" id=\"5_GGD_vs_MNS_Which_Low-Voltage_Cabinet_Fits_the_Project\"><\/span>5. GGD vs MNS: Which Low-Voltage Cabinet Fits the Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bcacc492\">Not every project needs the same cabinet structure.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-73b32cbe\">DHDL&#8217;s portfolio and published project information include both GGD low-voltage distribution cabinets and MNS withdrawable switchgear.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1a5385e2\">A simplified purchasing comparison is:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Feature<\/th><th>GGD Cabinet<\/th><th><a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/mns-low-voltage-withdrawable-switchgear-for-power-distribution\/\" data-type=\"product\" data-id=\"37466\">MNS Withdrawable Switchgear<\/a><\/th><\/tr><\/thead><tbody><tr><td>Structure<\/td><td>Fixed-type distribution cabinet<\/td><td>Modular withdrawable system<\/td><\/tr><tr><td>Typical Use<\/td><td>General distribution<\/td><td>More complex distribution systems<\/td><\/tr><tr><td>Maintenance<\/td><td>Conventional fixed arrangement<\/td><td>Withdrawable functional units can simplify servicing<\/td><\/tr><tr><td>Configuration<\/td><td>Incoming\/outgoing distribution<\/td><td>Multiple functional feeders<\/td><\/tr><tr><td>Typical Projects<\/td><td>Factories, buildings, general distribution<\/td><td>Data centers, larger industrial systems, critical loads<\/td><\/tr><tr><td>Customization<\/td><td>Breakers, busbars, feeders, enclosure<\/td><td>Feeders, drawers, protection, metering, control<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-90bd8247\">This does not mean MNS is automatically \u201cbetter\u201d than GGD.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d81c0f1e\">The correct choice depends on:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-54a33a72\"><strong>System Architecture + Maintenance Strategy + Reliability Requirement + Number of Feeders + Project Budget<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-99cd118c\">A straightforward factory distribution system may not need the same cabinet architecture as a 24\/7 data center.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-ed60cbb1\"><span class=\"ez-toc-section\" id=\"6_Real_Project_Example_Harbin_Intelligent_Computing_Center\"><\/span>6. Real Project Example: <a href=\"https:\/\/dinghongtransformer.com\/fr\/project\/harbin-intelligent-computing-center-phase-i-power-distribution-system-project\/\" data-type=\"page\" data-id=\"37334\">Harbin Intelligent Computing Center<\/a><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bef8f51e\">A useful example of low-voltage switchgear in a critical-load application comes from DHDL&#8217;s Harbin Intelligent Computing Center Phase I project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0c7461e8\">The published project information describes approximately <strong>18MW of new IT load<\/strong>, around <strong>1,800 additional cabinets<\/strong>, and a total project capacity of <strong>40MVA<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7855fcd7\">The electrical architecture uses dual power supplies, double busbars, and N+1 redundancy to support continuous data-center operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e004cdd4\">The equipment scope included:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Equipment<\/th><th>Project Configuration<\/th><\/tr><\/thead><tbody><tr><td>Transformateurs \u00e0 type sec<\/td><td>16 Units<\/td><\/tr><tr><td>Transformer Capacity<\/td><td>2500kVA Each<\/td><\/tr><tr><td>KYN28A-12 MV Switchgear<\/td><td>32 Panels<\/td><\/tr><tr><td>MNS Low-Voltage Switchgear<\/td><td>156 Panels<\/td><\/tr><tr><td>IT Load<\/td><td>Approx. 18MW<\/td><\/tr><tr><td>Total Capacity<\/td><td>40MVA<\/td><\/tr><tr><td>Power Architecture<\/td><td>Dual Supply + Double Busbar<\/td><\/tr><tr><td>Redundancy<\/td><td>N+1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6265d526\">The MNS cabinets were used for low-voltage distribution supporting data-center operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5322e6f8\">This project illustrates why cabinet selection cannot be based on rated voltage alone.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-94486b06\">For a data center, buyers also need to consider:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Power-supply redundancy<\/li>\n\n\n\n<li>Bus segmentation<\/li>\n\n\n\n<li>Maintenance without unnecessary service interruption<\/li>\n\n\n\n<li>Protection coordination<\/li>\n\n\n\n<li>Monitoring<\/li>\n\n\n\n<li>Feeder organization<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Environmental conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-56941415\">In Harbin, the low-temperature environment was another project consideration, with winter temperatures approaching approximately \u221230\u00b0C according to DHDL&#8217;s project description.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5bb14ec4\"><span class=\"ez-toc-section\" id=\"7_The_Hidden_Specification_Incoming_and_Outgoing_Feeders\"><\/span>7. The Hidden Specification: Incoming and Outgoing Feeders<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-864b1af5\">A common RFQ might say:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6efbf554\"><strong>\u201cNeed 10 low-voltage cabinets, 400V, 2500A.\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-719f13eb\">That still does not define the actual cabinet lineup.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3949b3df\">The manufacturer needs the <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/single-phase-pad-mounted-transformer-buyers-guide\/\" data-type=\"post\" data-id=\"38057\">single-line diagram <\/a>(SLD)<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fe7b34bc\">The SLD should identify:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Incoming circuits<\/li>\n\n\n\n<li>Bus sections<\/li>\n\n\n\n<li>Bus coupler<\/li>\n\n\n\n<li>Outgoing feeders<\/li>\n\n\n\n<li>Motor feeders<\/li>\n\n\n\n<li>Capacitor compensation<\/li>\n\n\n\n<li>ATS requirements<\/li>\n\n\n\n<li>Metering circuits<\/li>\n\n\n\n<li>Spare feeders<\/li>\n\n\n\n<li>Future expansion<\/li>\n\n\n\n<li>Generator or backup supply interfaces<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1124f2e5\">For example, one 2500A incoming cabinet may supply several different outgoing circuits.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-01a9a83b\">These feeders may require different breaker ratings, protection functions, metering, and cable connections.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-086cd123\">Without an SLD, two suppliers may quote completely different scopes even when both quotations say <strong>\u201c2500A Low-Voltage Cabinet.\u201d<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-644f6308\"><span class=\"ez-toc-section\" id=\"8_Breaker_Configuration_ACB_MCCB_and_Protection\"><\/span>8. Breaker Configuration: ACB, MCCB and Protection<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9cb3d6ca\">Circuit breakers should be selected according to the duty of each circuit.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f5f365bd\">A typical project may use:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ACB for main incomers<\/li>\n\n\n\n<li>ACB for bus couplers<\/li>\n\n\n\n<li>MCCB for larger outgoing feeders<\/li>\n\n\n\n<li>MCCB or other protective devices for smaller circuits<\/li>\n\n\n\n<li>Dedicated motor protection where required<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e5bff959\">The exact selection depends on current, fault level, protection coordination, operating sequence, and project requirements.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c589c5f9\">Buyers should define whether they require functions such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Overload protection<\/li>\n\n\n\n<li>Short-circuit protection<\/li>\n\n\n\n<li>Ground-fault protection<\/li>\n\n\n\n<li>Undervoltage protection<\/li>\n\n\n\n<li>Overvoltage monitoring<\/li>\n\n\n\n<li>Remote trip<\/li>\n\n\n\n<li>Shunt trip<\/li>\n\n\n\n<li>Electrical interlocking<\/li>\n\n\n\n<li>Mechanical interlocking<\/li>\n\n\n\n<li>Communication interface<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-60bff139\"><strong>Hidden procurement issue:<\/strong> The breaker brand and protection trip unit can significantly affect cabinet price.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d708d323\">When comparing quotations, make sure suppliers are quoting equivalent breaker specifications rather than comparing only cabinet dimensions and rated current.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-c571d3a4\"><span class=\"ez-toc-section\" id=\"9_Busbar_Design_Matters\"><\/span>9. Busbar Design Matters<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aabd92e9\">The busbar is the main current-carrying path inside the cabinet.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5a9821fe\">Buyers should confirm:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rated busbar current<\/li>\n\n\n\n<li>Copper or aluminum<\/li>\n\n\n\n<li>Neutral busbar requirements<\/li>\n\n\n\n<li>PE busbar requirements<\/li>\n\n\n\n<li>Short-time withstand rating<\/li>\n\n\n\n<li>Busbar arrangement<\/li>\n\n\n\n<li>Temperature-rise requirements<\/li>\n\n\n\n<li>Surface treatment if required<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a8381895\">For nonlinear loads such as data centers, UPS systems, LED lighting, and certain electronic equipment, neutral-current and harmonic conditions may also require engineering review.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-17d03306\">Do not automatically assume the neutral conductor should be designed only from the phase current without checking the actual load characteristics.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-6e5be060\"><span class=\"ez-toc-section\" id=\"10_Cable_Entry_and_Cabinet_Layout_Can_Create_Site_Problems\"><\/span>10. Cable Entry and Cabinet Layout Can Create Site Problems<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e186cc6c\">A cabinet can be electrically correct and still be difficult to install.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-32dd35c2\">Before production, confirm:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Top or bottom cable entry<\/li>\n\n\n\n<li>Cable trench position<\/li>\n\n\n\n<li>Incoming cable quantity<\/li>\n\n\n\n<li>Cable cross-section<\/li>\n\n\n\n<li>Cable bending radius<\/li>\n\n\n\n<li>Front access<\/li>\n\n\n\n<li>Rear access<\/li>\n\n\n\n<li>Cabinet lineup length<\/li>\n\n\n\n<li>Cabinet height and depth<\/li>\n\n\n\n<li>Wall clearance<\/li>\n\n\n\n<li>Maintenance space<\/li>\n\n\n\n<li>Future extension direction<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4fe94ee9\">This is especially important when the low-voltage cabinet is integrated into a <strong>prefabricated substation cabin<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-62092bf6\">DHDL&#8217;s prefabricated cabin guidance notes that low-voltage configuration may depend on rated voltage, main bus current, outgoing feeders, circuit-breaker requirements, motor loads, metering, power-factor correction, automatic transfer, external cable arrangement, and future feeder reserves.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-7341f400\"><span class=\"ez-toc-section\" id=\"11_Do_You_Need_Reactive_Power_Compensation\"><\/span>11. Do You Need Reactive Power Compensation?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-259d0abe\">Industrial facilities with motors, pumps, compressors, HVAC equipment, and other inductive loads may operate with a lower power factor.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9a4cd350\">In these cases, a <strong>reactive power compensation cabinet<\/strong> may be incorporated into the low-voltage system.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d0a62585\">DHDL&#8217;s GGJ low-voltage reactive power compensation cabinet uses capacitors, controllers, switching devices, protection components, and monitoring units to adjust reactive power according to load changes.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8247d068\">When requesting compensation equipment, provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>System voltage<\/li>\n\n\n\n<li>Existing power factor<\/li>\n\n\n\n<li>Target power factor<\/li>\n\n\n\n<li>Active load<\/li>\n\n\n\n<li>Required compensation capacity<\/li>\n\n\n\n<li>Harmonic conditions<\/li>\n\n\n\n<li>Load fluctuation<\/li>\n\n\n\n<li>Capacitor configuration requirements<\/li>\n\n\n\n<li>Controller requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-84dbc7d7\">Do not select capacitor capacity only from transformer kVA.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-05b95356\">The actual load profile and harmonic environment should be reviewed first.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5bb7177d\"><span class=\"ez-toc-section\" id=\"12_Standards_Testing_and_Documentation\"><\/span>12. Standards, Testing and Documentation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4969820d\">For international projects, buyers should specify the applicable standard at the beginning of the RFQ.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e4c8ba92\">DHDL states that its power equipment can be adapted to IEC, ANSI, and project-specific technical requirements.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-253f86ff\">Depending on the project, buyers should request relevant inspection and verification documentation for the cabinet configuration.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-02175b0a\">The technical document package may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Approved single-line diagram<\/li>\n\n\n\n<li>Cabinet arrangement drawing<\/li>\n\n\n\n<li>Technical datasheet<\/li>\n\n\n\n<li>Component list<\/li>\n\n\n\n<li>Busbar information<\/li>\n\n\n\n<li>Wiring diagram<\/li>\n\n\n\n<li>Terminal diagram<\/li>\n\n\n\n<li>Nameplate information<\/li>\n\n\n\n<li>Test reports<\/li>\n\n\n\n<li>Packing list<\/li>\n\n\n\n<li>Installation documentation<\/li>\n\n\n\n<li>Operation and maintenance manual<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-34914c32\">DHDL&#8217;s website also lists an <strong>MNS Switchgear Type Test Report<\/strong> among its quality and compliance materials.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ed2c8864\">For export projects, confirm documentation requirements before production rather than asking for additional files immediately before shipment.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0e88a2ee\"><span class=\"ez-toc-section\" id=\"13_Low-Voltage_Distribution_Cabinet_RFQ_Checklist\"><\/span>13. Low-Voltage Distribution Cabinet RFQ Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-da726886\">Before requesting a quotation, prepare the following information:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>RFQ Item<\/th><th>Buyer Input<\/th><\/tr><\/thead><tbody><tr><td>Application<\/td><td>__________<\/td><\/tr><tr><td>System Voltage<\/td><td>_____ V<\/td><\/tr><tr><td>Fr\u00e9quence<\/td><td>50 \/ 60Hz<\/td><\/tr><tr><td>Phase<\/td><td>__________<\/td><\/tr><tr><td>Main Bus Current<\/td><td>_____ A<\/td><\/tr><tr><td>Incoming Breaker<\/td><td>__________<\/td><\/tr><tr><td>Outgoing Feeders<\/td><td>__________<\/td><\/tr><tr><td>Short-Circuit Level<\/td><td>_____ kA<\/td><\/tr><tr><td>Cabinet Type<\/td><td>GGD \/ MNS \/ Other<\/td><\/tr><tr><td>Busbar Material<\/td><td>Cu \/ Al<\/td><\/tr><tr><td>Cable Entry<\/td><td>Top \/ Bottom<\/td><\/tr><tr><td>Installation<\/td><td>Indoor \/ Outdoor<\/td><\/tr><tr><td>IP Rating<\/td><td>__________<\/td><\/tr><tr><td>Metering<\/td><td>__________<\/td><\/tr><tr><td>Protection Functions<\/td><td>__________<\/td><\/tr><tr><td>Communication<\/td><td>__________<\/td><\/tr><tr><td>Compensation Requirement<\/td><td>_____ kvar<\/td><\/tr><tr><td>Applicable Standard<\/td><td>__________<\/td><\/tr><tr><td>Quantity<\/td><td>_____ Panels<\/td><\/tr><tr><td>Destination<\/td><td>__________<\/td><\/tr><tr><td>Required Delivery<\/td><td>__________<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-f3725f61\"><span class=\"ez-toc-section\" id=\"Recommended_RFQ_Attachments\"><\/span><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-rfq-checklist-specifications-buyers-must-provide-for-an-accurate-quote\/\" data-type=\"post\" data-id=\"38577\">Recommended RFQ Attachments<\/a><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-55532d14\">Whenever possible, attach:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Single-Line Diagram<\/li>\n\n\n\n<li>Load schedule<\/li>\n\n\n\n<li>Transformer specifications<\/li>\n\n\n\n<li>Short-circuit calculation<\/li>\n\n\n\n<li>Protection philosophy<\/li>\n\n\n\n<li>Cable schedule<\/li>\n\n\n\n<li>Power-room layout<\/li>\n\n\n\n<li>Required component brands<\/li>\n\n\n\n<li>Metering requirements<\/li>\n\n\n\n<li>Communication requirements<\/li>\n\n\n\n<li>Applicable technical standard<\/li>\n\n\n\n<li>Tender specification<\/li>\n\n\n\n<li>Project schedule<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-00b4bdb1\">For substations and switchgear projects, DHDL specifically recommends providing the <strong>SLD, IP rating, site conditions, and project schedule<\/strong> to support technical confirmation.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-1032f7ba\"><span class=\"ez-toc-section\" id=\"Choose_DHDL_for_Your_Transformer_Solutions\"><\/span>Choisissez&nbsp;<a href=\"https:\/\/dinghongtransformer.com\/fr\/\">DHDL pour vos solutions de transformateur<\/a><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1eb05c78\">DHDL est un fabricant professionnel de transformateurs sp\u00e9cialis\u00e9 dans<a href=\"https:\/\/dinghongtransformer.com\/fr\/shop\/\"><mark>transformateurs \u00e0 type sec, transformateurs immerg\u00e9s dans l\u2019huile, transformateurs de puissance, transformateurs de distribution et solutions compl\u00e8tes de distribution d\u2019\u00e9nergie.<\/mark><\/a><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4f29f39d\">Nous proposons des conceptions de transformateurs sur-mesure bas\u00e9es sur\u00a0<a href=\"https:\/\/dinghongtransformer.com\/fr\/tag\/project\/\"><strong><mark>tension du projet<\/mark><\/strong><\/a>, Capacit\u00e9, fr\u00e9quence, environnement d\u2019installation et normes internationales.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d159ce56\">Que ce soit pour des installations industrielles, des projets d\u2019\u00e9nergie renouvelable, des centres de donn\u00e9es, des services publics ou des applications d\u2019infrastructure, DHDL propose des solutions d\u2019alimentation fiables, efficaces et personnalis\u00e9es dans le monde entier.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-31c455ed\"><a href=\"https:\/\/dinghongtransformer.com\/fr\/contactez-nous\/\"><strong><mark>Contactez DHDL d\u00e8s aujourd\u2019hui pour obtenir un soutien professionnel dans le choix des transformateurs et une offre personnalis\u00e9e.<\/mark><\/strong><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-5569e9e7\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-137e14cd\"><span class=\"ez-toc-section\" id=\"1_What_is_a_low-voltage_distribution_cabinet_used_for\"><\/span>1. What is a low-voltage distribution cabinet used for?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2c59580e\">A low-voltage distribution cabinet receives power from a transformer or upstream source and distributes it to downstream electrical loads.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aaf7ee3b\">Depending on the project, it can provide switching, protection, metering, control, feeder distribution, and monitoring functions. DHDL&#8217;s GGD cabinet is designed for industrial, commercial, and public-building power systems.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-66f17a27\"><span class=\"ez-toc-section\" id=\"2_What_information_is_required_to_quote_a_low-voltage_distribution_cabinet\"><\/span>2. What information is required to quote a low-voltage distribution cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c04488c1\">Provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>System voltage<\/li>\n\n\n\n<li>Fr\u00e9quence<\/li>\n\n\n\n<li>Rated current<\/li>\n\n\n\n<li>Short-circuit level<\/li>\n\n\n\n<li>Incoming breaker<\/li>\n\n\n\n<li>Outgoing feeders<\/li>\n\n\n\n<li>Busbar requirements<\/li>\n\n\n\n<li>Cable-entry direction<\/li>\n\n\n\n<li>IP rating<\/li>\n\n\n\n<li>Protection requirements<\/li>\n\n\n\n<li>Applicable standard<\/li>\n\n\n\n<li>Quantity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3c977951\">A Single-Line Diagram is strongly recommended.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-87ad1219\"><span class=\"ez-toc-section\" id=\"3_What_is_the_difference_between_GGD_and_MNS_low-voltage_switchgear\"><\/span>3. What is the difference between GGD and MNS low-voltage switchgear?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-096459f5\">GGD is generally used as a fixed low-voltage distribution cabinet, while MNS uses a modular withdrawable structure that can be suitable for more complex systems and applications requiring flexible feeder organization and maintenance.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d4e3a84c\">The final choice should follow the approved electrical design rather than cabinet type alone.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-8b96b0e9\"><span class=\"ez-toc-section\" id=\"4_How_do_I_calculate_the_current_for_a_1000kVA_400V_transformer\"><\/span>4. How do I calculate the current for a 1,000kVA 400V transformer?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9fa23118\">For a three-phase system:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-034cf01c\"><strong>I = S \u00f7 (\u221a3 \u00d7 V)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bd185dcb\">For a 1,000kVA transformer at 400V, the approximate full-load current is <strong>1,443A<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-39a0f5aa\">However, the final cabinet and busbar rating should also consider overload, temperature, future expansion, protection coordination, and project requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-121ef68a\"><span class=\"ez-toc-section\" id=\"5_Why_is_short-circuit_rating_important_for_an_LV_cabinet\"><\/span>5. Why is short-circuit rating important for an LV cabinet?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-870ed87a\">The cabinet and breakers must safely withstand and interrupt fault conditions according to the electrical system design.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ea6f7cad\">Fault current can depend on transformer capacity, transformer impedance, network configuration, cables, and whether transformers operate in parallel.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-7ad6be6d\"><span class=\"ez-toc-section\" id=\"6_Can_DHDL_integrate_low-voltage_cabinets_into_a_complete_substation\"><\/span>6. Can DHDL integrate low-voltage cabinets into a complete substation?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-eb07c97c\">Yes. DHDL&#8217;s prefabricated substation cabin solution can integrate transformers, high-voltage switchgear, low-voltage switchgear, metering, protection, control, and monitoring equipment in a modular enclosure.<\/p>","protected":false},"excerpt":{"rendered":"<p>Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.<\/p>","protected":false},"author":1,"featured_media":38714,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-38713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-18T04:12:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-18T04:12:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide\",\"datePublished\":\"2026-09-18T04:12:09+00:00\",\"dateModified\":\"2026-09-18T04:12:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"},\"wordCount\":2137,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\",\"name\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"datePublished\":\"2026-09-18T04:12:09+00:00\",\"dateModified\":\"2026-09-18T04:12:23+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Low-Voltage-Distribution-Cabinet.png\",\"width\":1536,\"height\":1024,\"caption\":\"Low-Voltage Distribution Cabinet\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/low-voltage-distribution-cabinet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/fr\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","og_locale":"fr_FR","og_type":"article","og_title":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","og_description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","og_url":"https:\/\/dinghongtransformer.com\/fr\/blog\/low-voltage-distribution-cabinet\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-09-18T04:12:09+00:00","article_modified_time":"2026-09-18T04:12:23+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"DHDL","Dur\u00e9e de lecture estim\u00e9e":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide","datePublished":"2026-09-18T04:12:09+00:00","dateModified":"2026-09-18T04:12:23+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"},"wordCount":2137,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","articleSection":["Blog"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/","url":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/","name":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","datePublished":"2026-09-18T04:12:09+00:00","dateModified":"2026-09-18T04:12:23+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"Learn how to select a low-voltage distribution cabinet for industrial, commercial and data-center projects. Compare rated current, short-circuit rating, GGD vs MNS, breakers, busbars and RFQ requirements.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/09\/Low-Voltage-Distribution-Cabinet.png","width":1536,"height":1024,"caption":"Low-Voltage Distribution Cabinet"},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/low-voltage-distribution-cabinet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Low-Voltage Distribution Cabinet: Specifications, Applications &amp; Buyer\u2019s Guide"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrique des transformateurs, des armoires de distribution haute et basse tension, des sous-stations pr\u00e9fabriqu\u00e9es, des armoires de stockage d'\u00e9nergie et des \u00e9quipements de recharge pour VE destin\u00e9s aux projets de services publics, industriels et d'\u00e9nergies nouvelles dans le monde entier.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/fr\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=38713"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713\/revisions"}],"predecessor-version":[{"id":38717,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38713\/revisions\/38717"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media\/38714"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=38713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=38713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=38713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}