{"id":38568,"date":"2026-08-31T19:55:00","date_gmt":"2026-08-31T19:55:00","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=38568"},"modified":"2026-11-02T09:57:17","modified_gmt":"2026-11-02T09:57:17","slug":"transformer-winding-resistance-test-what-the-results-tell-engineers","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/","title":{"rendered":"Transformer Winding Resistance Test: What the Results Tell Engineers"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A transformer winding resistance test can reveal problems that are difficult to identify from a visual inspection alone. An unusual reading may point to a loose connection, a damaged conductor, or a tap-changer contact that needs further investigation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5951336c\">However, a resistance value is only useful when it is compared under the right conditions. Temperature, tap position, winding connection, test equipment, and the factory baseline can all affect the interpretation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2a11e8d5\">For transformer buyers,<strong><em> <a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/how-oem-odm-transformer-manufacturing-works-a-complete-guide\/\" data-type=\"post\" data-id=\"38064\">EPC contractors<\/a><\/em><\/strong>, and maintenance engineers, the key question is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fc19fda2\"><strong>Does the test report provide enough information to distinguish a genuine problem from a difference in test conditions?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-75b0c035\">This guide explains what winding resistance results mean, how temperature correction works, and what to request before a transformer leaves the factory.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table des mati\u00e8res<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_Is_a_Transformer_Winding_Resistance_Test\" >What Is a Transformer Winding Resistance Test?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_Can_a_Winding_Resistance_Test_Detect\" >What Can a Winding Resistance Test Detect?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Why_Does_Temperature_Matter\" >Why Does Temperature Matter?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Transformer_Winding_Resistance_Temperature_Correction\" >Transformer Winding Resistance Temperature Correction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Example_Correcting_a_Copper_Winding_Reading\" >Example: Correcting a Copper Winding Reading<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#How_Should_Engineers_Compare_Winding_Resistance_Results\" >How Should Engineers Compare Winding Resistance Results?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#1_Compare_Equivalent_Phase_Measurements\" >1. Compare Equivalent Phase Measurements<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#2_Compare_with_the_Factory_Baseline\" >2. Compare with the Factory Baseline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#3_Compare_Results_Over_Time\" >3. Compare Results Over Time<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_Do_Abnormal_Results_Mean\" >What Do Abnormal Results Mean?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_Are_the_Acceptance_Criteria_for_Transformer_Winding_Resistance\" >What Are the Acceptance Criteria for Transformer Winding Resistance?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Why_Should_Tap_Positions_Be_Included_in_the_Test\" >Why Should Tap Positions Be Included in the Test?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#How_Is_a_Transformer_Winding_Resistance_Test_Performed\" >How Is a Transformer Winding Resistance Test Performed?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Example_Comparing_Factory_and_Site_Test_Results\" >Example: Comparing Factory and Site Test Results<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_Should_Buyers_Request_in_a_Winding_Resistance_Test_Report\" >What Should Buyers Request in a Winding Resistance Test Report?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Transformer_RFQ_and_Testing_Checklist\" >Transformer RFQ and Testing Checklist<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Basic_Transformer_Information\" >Basic Transformer Information<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Testing_and_Documentation_Requirements\" >Testing and Documentation Requirements<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Frequently_Asked_Questions\" >Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#What_does_a_transformer_winding_resistance_test_measure\" >What does a transformer winding resistance test measure?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Is_winding_resistance_the_same_as_insulation_resistance\" >Is winding resistance the same as insulation resistance?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Does_a_high_winding_resistance_reading_always_mean_a_fault\" >Does a high winding resistance reading always mean a fault?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Why_are_factory_winding_resistance_results_important\" >Why are factory winding resistance results important?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Should_every_tap_position_be_tested\" >Should every tap position be tested?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Can_winding_resistance_testing_identify_a_shorted_turn\" >Can winding resistance testing identify a shorted turn?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#Discuss_Your_Transformer_Testing_Requirements_with_DHDL\" >Discuss Your Transformer Testing Requirements with DHDL<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-8be98608\"><span class=\"ez-toc-section\" id=\"What_Is_a_Transformer_Winding_Resistance_Test\"><\/span>What Is a Transformer Winding Resistance Test?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0ccca266\">A transformer winding resistance test measures the <strong>DC resistance<\/strong> of a winding and the electrical connections included in the measurement path.<\/p>\n\n\n\n<div class=\"wp-block-wd-image wd-block-image wd-0089d478\"><img decoding=\"async\" width=\"1672\" height=\"941\" class=\"wp-image-38953 lazyload\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test.png\" alt=\"\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test.png 1672w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-400x225.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-1300x732.png 1300w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-768x432.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-1536x864.png 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-18x10.png 18w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-430x242.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-700x394.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/Transformer-winding-resistance-test-150x84.png 150w\" data-sizes=\"(max-width: 1672px) 100vw, 1672px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1672px; --smush-placeholder-aspect-ratio: 1672\/941;\" \/><\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-253418a4\">A test instrument applies a controlled direct current and measures the voltage drop. The resistance is calculated as:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-45e63b8f\"><strong>Resistance (\u03a9) = Voltage (V) \u00f7 Current (A)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8725f7f5\">Depending on the transformer design and test plan, measurements are taken between specified winding terminals and at relevant tap positions.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c9750a78\">The test is commonly performed during:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Factory routine testing and factory acceptance testing, or <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/case-studies\/transformer-fat-vs-sat-testing-checklist\/\" data-type=\"post\" data-id=\"38910\"><em>FAT<\/em><\/a><\/strong><\/li>\n\n\n\n<li>Site acceptance testing, or SAT<\/li>\n\n\n\n<li>Commissioning after transportation and installation<\/li>\n\n\n\n<li>Scheduled maintenance<\/li>\n\n\n\n<li>Troubleshooting after an abnormal event or repair<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8e6c096a\">The factory result is especially valuable because it provides a baseline for later comparisons.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-e1dbf4b6\"><span class=\"ez-toc-section\" id=\"What_Can_a_Winding_Resistance_Test_Detect\"><\/span>What Can a Winding Resistance Test Detect?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-627f3a46\">Winding resistance testing helps assess the condition of the transformer\u2019s current-carrying path. Depending on the measurement pattern, abnormal results may indicate:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Possible issue<\/th><th>What engineers may observe<\/th><\/tr><\/thead><tbody><tr><td>Loose terminal or internal connection<\/td><td>Higher resistance in the affected measurement path<\/td><\/tr><tr><td>Poor tap-changer contact<\/td><td>An unexpected result at one or more tap positions<\/td><\/tr><tr><td>Damaged conductor or broken strands<\/td><td>A change compared with equivalent phases or previous results<\/td><\/tr><tr><td>Incorrect test connection<\/td><td>An inconsistent result that changes after the setup is checked<\/td><\/tr><tr><td>Temperature difference<\/td><td>A broadly higher or lower reading compared with an uncorrected reference<\/td><\/tr><tr><td>Open circuit<\/td><td>No stable resistance reading through the intended path<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-92b80ac4\">A test result <strong>can indicate a possible problem, but it does not identify the exact fault by itself<\/strong>. Engineers should review the test setup and supporting evidence before reaching a conclusion. The U.S. Bureau of Reclamation identifies winding resistance measurement as a useful test for finding broken strands, loose connections and poor tap-changer contacts. <a href=\"https:\/\/www.usbr.gov\/tsc\/techreferences\/mands\/mands-pdfs\/Trnsfrmr.pdf?utm_source=chatgpt.com\">usbr.gov<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0b90f3e4\"><span class=\"ez-toc-section\" id=\"Why_Does_Temperature_Matter\"><\/span>Why Does Temperature Matter?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-08ebc047\">Copper and aluminium winding resistance increases as the conductor temperature rises. This means a transformer can produce different resistance readings at the factory and on site even when its electrical condition has not changed.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a382980c\">For a meaningful comparison:<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Record the winding temperature, or the agreed method used to estimate it.<\/li>\n\n\n\n<li>Confirm the winding conductor material.<\/li>\n\n\n\n<li>Correct both readings to the same reference temperature.<\/li>\n\n\n\n<li>Compare the same winding, terminals, and tap position.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cf8f9d5d\">Ambient temperature alone may not represent the actual winding temperature, especially if the transformer has recently been operating. The reliability of the correction depends on how well the recorded temperature represents the winding.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-1af938a0\"><span class=\"ez-toc-section\" id=\"Transformer_Winding_Resistance_Temperature_Correction\"><\/span>Transformer Winding Resistance Temperature Correction<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fa02b3fc\">A commonly used correction formula is:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-66eb408e\"><strong>R\u2082 = R\u2081 \u00d7 (T\u2082 + K) \u00f7 (T\u2081 + K)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6cda4eda\">O\u00f9 :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>R\u2081<\/strong> = measured resistance<\/li>\n\n\n\n<li><strong>R\u2082<\/strong> = resistance corrected to the reference temperature<\/li>\n\n\n\n<li><strong>T\u2081<\/strong> = winding temperature at the time of measurement, in \u00b0C<\/li>\n\n\n\n<li><strong>T\u2082<\/strong> = reference temperature, in \u00b0C<\/li>\n\n\n\n<li><strong>K<\/strong> = temperature constant; commonly approximately <strong>235 for copper<\/strong> et <strong>225 for aluminium<\/strong>, subject to the conductor material and applicable test method<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7864d56a\">Use the constants and reference temperature specified by the manufacturer, applicable standard, or project test procedure.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-1d9d90f7\"><span class=\"ez-toc-section\" id=\"Example_Correcting_a_Copper_Winding_Reading\"><\/span>Example: Correcting a Copper Winding Reading<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-a7e2282b\">Suppose a copper winding measures <strong>0.1200 \u03a9 at 25\u00b0C<\/strong>. To compare it at a reference temperature of <strong>75\u00b0C<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-adc44a95\"><strong>R\u2082 = 0.1200 \u00d7 (75 + 235) \u00f7 (25 + 235)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-aa4f1bd9\"><strong>R\u2082 \u2248 0.1431 \u03a9<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-00fad8ec\">The corrected value is approximately <strong>0.1431 \u03a9 at 75\u00b0C<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-11efcf45\">This is an illustrative calculation. It does not establish an acceptable value for a particular transformer.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-98614770\"><span class=\"ez-toc-section\" id=\"How_Should_Engineers_Compare_Winding_Resistance_Results\"><\/span>How Should Engineers Compare Winding Resistance Results?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-651fb188\">A resistance reading should be reviewed against the transformer\u2019s design and available records. The most useful comparisons are:<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-9678926d\"><span class=\"ez-toc-section\" id=\"1_Compare_Equivalent_Phase_Measurements\"><\/span>1. Compare Equivalent Phase Measurements<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b846e0af\">For a three-phase transformer, compare equivalent measurement paths where the winding arrangement allows a meaningful comparison.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4005999e\">Record the actual terminals tested\u2014for example, H1\u2013H2 or X1\u2013X0\u2014rather than simply writing \u201cPhase A.\u201d<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-881c3c58\"><strong>Important:<\/strong> Transformer winding connections and measurement paths can affect the expected values. Do not assume every terminal-to-terminal result must be identical without checking the vector group, winding arrangement, and manufacturer\u2019s instructions.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-bc4bceeb\"><span class=\"ez-toc-section\" id=\"2_Compare_with_the_Factory_Baseline\"><\/span>2. Compare with the Factory Baseline<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-10013ceb\">A site reading should be compared with the factory result for the:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Same winding and terminal pair<\/li>\n\n\n\n<li>Same tap position<\/li>\n\n\n\n<li>Same resistance unit<\/li>\n\n\n\n<li>Same reference temperature<\/li>\n\n\n\n<li>Comparable measurement method<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6fc6778e\">A difference after transportation does not automatically mean the transformer was damaged. First verify the test conditions and measurement connections.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-5b178069\"><span class=\"ez-toc-section\" id=\"3_Compare_Results_Over_Time\"><\/span>3. Compare Results Over Time<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-54787cbd\">For an operating transformer, historical measurements can help engineers identify a developing trend.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-df39962e\">For example, a gradual rise in corrected resistance on one measurement path may justify checking connections or tap-changer contacts. The investigation should consider other test results and the transformer\u2019s operating history.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-8a2d2064\"><span class=\"ez-toc-section\" id=\"What_Do_Abnormal_Results_Mean\"><\/span>What Do Abnormal Results Mean?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-73e3dcf6\">The table below is a practical starting point for reviewing an unusual reading.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Observation<\/th><th>Possible explanations<\/th><th>Recommended next step<\/th><\/tr><\/thead><tbody><tr><td>One comparable reading is higher than expected<\/td><td>Poor test lead contact, loose connection, damaged conductor, or contact issue<\/td><td>Verify the setup, repeat the test and compare with the baseline<\/td><\/tr><tr><td>All readings are higher than the factory values<\/td><td>Different winding temperature, incorrect temperature correction or measurement setup<\/td><td>Confirm temperatures, conductor material and reference temperature<\/td><\/tr><tr><td>One tap differs unexpectedly from adjacent taps<\/td><td>Tap contact or connection issue; test setup error<\/td><td>Repeat the measurement and review the tap-by-tap pattern<\/td><\/tr><tr><td>Reading does not stabilize<\/td><td>Winding inductance, insufficient stabilization time, poor connection or instrument settings<\/td><td>Follow the instrument and manufacturer\u2019s procedure<\/td><\/tr><tr><td>Reading changes significantly after transport<\/td><td>Different conditions, test connections or possible transport-related issue<\/td><td>Repeat under comparable conditions and consult the manufacturer<\/td><\/tr><tr><td>No reading through the intended path<\/td><td>Open circuit or incorrect connection<\/td><td>Stop and investigate under the approved safety procedure<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-df61b7e2\"><strong>Practical rule:<\/strong> repeat and verify an abnormal measurement before treating it as a confirmed transformer defect.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-34ebceeb\"><span class=\"ez-toc-section\" id=\"What_Are_the_Acceptance_Criteria_for_Transformer_Winding_Resistance\"><\/span>What Are the Acceptance Criteria for Transformer Winding Resistance?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bef49517\">There is no single resistance value or percentage that can be applied safely to every transformer.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-108d480b\">Acceptance depends on factors such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transformer design and winding configuration<\/li>\n\n\n\n<li>Terminal measurement path<\/li>\n\n\n\n<li>Tap position<\/li>\n\n\n\n<li>Measurement uncertainty<\/li>\n\n\n\n<li>Winding temperature and correction method<\/li>\n\n\n\n<li>Applicable standard and project specification<\/li>\n\n\n\n<li>Factory baseline and historical results<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ccd6e08d\">Some projects specify a permitted phase-to-phase or baseline deviation. Buyers should confirm the applicable criteria <strong>before testing<\/strong> rather than assuming that a percentage found online applies to their transformer.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-82836675\">If a result falls outside the agreed criteria, the test report should document the deviation, repeat measurements, investigation, and agreed disposition.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-4e119864\"><span class=\"ez-toc-section\" id=\"Why_Should_Tap_Positions_Be_Included_in_the_Test\"><\/span>Why Should Tap Positions Be Included in the Test?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ef654c35\">Tap changers adjust the effective number of winding turns to change the voltage ratio. Their contacts and connections are part of the electrical path, so an issue may appear only at a particular position.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3b94a708\">For example, a resistance pattern that changes as expected across several taps but shows an unusual value at one position may require further investigation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e620ce7b\">Before FAT, ask the manufacturer:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Which winding has the tap changer?<\/li>\n\n\n\n<li>Which tap positions will be measured?<\/li>\n\n\n\n<li>Will individual readings be included in the report?<\/li>\n\n\n\n<li>How will an abnormal tap-position reading be investigated?<\/li>\n\n\n\n<li>Is the tap changer on-load or de-energized?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-92f52cea\">Testing must follow the equipment manufacturer\u2019s instructions and the approved procedure. <strong>Tap operation during DC injection should only be performed with equipment and a procedure specifically designed for that purpose.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-9a9d99e5\"><span class=\"ez-toc-section\" id=\"How_Is_a_Transformer_Winding_Resistance_Test_Performed\"><\/span>How Is a Transformer Winding Resistance Test Performed?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-4b38afcc\">The exact procedure depends on the transformer and test instrument. A typical workflow includes:<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Review the transformer drawings, nameplate, terminal markings, tap arrangement, and test procedure.<\/li>\n\n\n\n<li>Isolate and prepare the transformer according to the approved electrical safety procedure.<\/li>\n\n\n\n<li>Record the winding temperature or agreed temperature estimate.<\/li>\n\n\n\n<li>Connect the test instrument to the specified terminals.<\/li>\n\n\n\n<li>Apply the appropriate DC test current and allow the reading to stabilize.<\/li>\n\n\n\n<li>Record the resistance, terminal pair, temperature, and tap position.<\/li>\n\n\n\n<li>Complete the required measurements and safely discharge the winding before removing connections.<\/li>\n\n\n\n<li>Correct and compare the results as required by the project specification.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b68c8a16\"><strong>Safety:<\/strong> Transformer windings store energy during DC testing. Testing and discharge must be carried out by qualified personnel using the manufacturer\u2019s instructions and the approved site procedure.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-22bc848d\"><span class=\"ez-toc-section\" id=\"Example_Comparing_Factory_and_Site_Test_Results\"><\/span>Example: Comparing Factory and Site Test Results<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3526d913\">The following is an <strong>illustrative scenario<\/strong>, not an actual DHDL project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-136eada8\">An EPC contractor receives an <em><strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/industry-standards\/what-you-need-to-know-about-oil-immersed-transformers\/\" data-type=\"post\" data-id=\"37691\">oil-immersed transforme<\/a><\/strong><\/em>r for an industrial project in Vietnam. During site acceptance testing, one winding resistance reading appears higher than the factory value.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Item<\/th><th>Factory test<\/th><th>Site test<\/th><\/tr><\/thead><tbody><tr><td>Transformer condition<\/td><td>Before shipment<\/td><td>After installation<\/td><\/tr><tr><td>Measured winding<\/td><td>Same terminal pair<\/td><td>Same terminal pair<\/td><\/tr><tr><td>Tap position<\/td><td>Position 3<\/td><td>Position 3<\/td><\/tr><tr><td>Recorded winding temperature<\/td><td>25\u00b0C<\/td><td>45\u00b0C<\/td><\/tr><tr><td>Initial observation<\/td><td>Baseline established<\/td><td>Uncorrected value appears higher<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-08bc3dd5\">The engineering team first checks the temperature correction, test leads, terminal identification, and tap position. After correcting both results to the same reference temperature, the difference becomes smaller.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c1322560\">If a difference remains outside the agreed project criteria, the team repeats the measurement and asks the manufacturer to review the full test data.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0a7f9f4f\"><strong>The lesson:<\/strong> an apparent change between<strong><em><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/case-studies\/transformer-fat-vs-sat-testing-checklist\/\" data-type=\"post\" data-id=\"38910\"> FAT and SAT<\/a><\/em><\/strong> should trigger a structured comparison\u2014not an immediate conclusion that the transformer is defective.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-52e758c0\">For a broader comparison of factory and site testing, see our guide to <a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/case-studies\/transformer-fat-vs-sat-testing-checklist\/?utm_source=chatgpt.com\">Transformer FAT vs SAT: Testing Checklist, Required Documents &amp; Buyer Responsibilities<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-3a1b0cab\"><span class=\"ez-toc-section\" id=\"What_Should_Buyers_Request_in_a_Winding_Resistance_Test_Report\"><\/span>What Should Buyers Request in a Winding Resistance Test Report?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2e95a88a\">A test report should make it possible to reproduce and compare the results later.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Report item<\/th><th>Why it matters<\/th><\/tr><\/thead><tbody><tr><td>Manufacturer, model and serial number<\/td><td>Identifies the exact transformer<\/td><\/tr><tr><td>Rated capacity and voltage<\/td><td>Confirms the equipment tested<\/td><\/tr><tr><td>Winding connection and terminal identification<\/td><td>Defines the measurement path<\/td><\/tr><tr><td>Tap position<\/td><td>Allows comparison of equivalent settings<\/td><\/tr><tr><td>Measured resistance and unit<\/td><td>Provides the original test data<\/td><\/tr><tr><td>Winding temperature or estimation method<\/td><td>Supports temperature correction<\/td><\/tr><tr><td>Reference temperature and corrected values, if required<\/td><td>Enables comparison with future results<\/td><\/tr><tr><td>Conductor material or applicable correction constant<\/td><td>Supports the correct calculation<\/td><\/tr><tr><td>Test instrument identification and calibration information<\/td><td>Supports traceability<\/td><\/tr><tr><td>Test date and test personnel<\/td><td>Documents when and by whom testing was performed<\/td><\/tr><tr><td>Applicable procedure and acceptance criteria<\/td><td>Shows how the results were assessed<\/td><\/tr><tr><td>Deviations and repeat-test results<\/td><td>Documents how abnormal results were resolved<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5403883d\">For international projects\u2014including those in <strong><a href=\"https:\/\/dinghongtransformer.com\/fr\/project\/thailand-industrial-park-power-distribution-expansion-project\/\" data-type=\"page\" data-id=\"37307\"><em>Tha\u00eflande<\/em><\/a>, Nigeria, Uzbekistan, and Vietnam<\/strong>\u2014agreeing on these requirements before manufacturing can reduce questions during inspection, shipping, and commissioning.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-0c7dc9fb\"><span class=\"ez-toc-section\" id=\"Transformer_RFQ_and_Testing_Checklist\"><\/span><a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/product-insights\/transformer-rfq-checklist\/\" data-type=\"post\" data-id=\"38222\"><em>Transformer RFQ<\/em><\/a> and Testing Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-673118e0\">When requesting a transformer quotation, provide the technical specifications and testing requirements together.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-91a05479\"><span class=\"ez-toc-section\" id=\"Basic_Transformer_Information\"><\/span>Basic Transformer Information<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rated capacity: kVA or MVA<\/li>\n\n\n\n<li>Primary and secondary voltage<\/li>\n\n\n\n<li>Frequency: 50 Hz or 60 Hz<\/li>\n\n\n\n<li>Transformer type: <strong><em><a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/66kv-high-voltage-oil-immersed-power-transformer\/\" data-type=\"product\" data-id=\"37438\">oil-immersed<\/a><\/em><\/strong> or dry-type<\/li>\n\n\n\n<li>Number of phases and vector group<\/li>\n\n\n\n<li>Cooling method<\/li>\n\n\n\n<li>Installation location and environmental conditions<\/li>\n\n\n\n<li>Applicable standard and project specification<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-25811567\"><span class=\"ez-toc-section\" id=\"Testing_and_Documentation_Requirements\"><\/span>Testing and Documentation Requirements<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Required routine and additional tests<\/li>\n\n\n\n<li>FAT witness requirements, if any<\/li>\n\n\n\n<li>Required tap-position measurements<\/li>\n\n\n\n<li>Agreed acceptance criteria<\/li>\n\n\n\n<li>Reference temperature and correction requirements<\/li>\n\n\n\n<li>Required test report format and language<\/li>\n\n\n\n<li>Third-party inspection requirements<\/li>\n\n\n\n<li>SAT and commissioning documentation needs<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3be945a4\">For a more complete procurement list, read our <a href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-rfq-checklist-specifications-buyers-must-provide-for-an-accurate-quote\/?utm_source=chatgpt.com\">Transformer RFQ Checklist<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-821a5750\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span>Frequently Asked Questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-9ec52c9a\"><span class=\"ez-toc-section\" id=\"What_does_a_transformer_winding_resistance_test_measure\"><\/span>What does a transformer winding resistance test measure?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ef7ccae0\">It measures the DC resistance of the selected winding and the connections included in the test path. Results help engineers assess winding connections and tap-changer contacts.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-03db4f6d\"><span class=\"ez-toc-section\" id=\"Is_winding_resistance_the_same_as_insulation_resistance\"><\/span>Is winding resistance the same as insulation resistance?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-16811812\">No. Winding resistance evaluates the resistance of the current-carrying path. Insulation resistance testing evaluates the electrical isolation between windings and ground, or between windings, according to the test setup.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-3864e439\"><span class=\"ez-toc-section\" id=\"Does_a_high_winding_resistance_reading_always_mean_a_fault\"><\/span>Does a high winding resistance reading always mean a fault?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-95b5eee5\">No. Temperature, test lead connections, tap position, measurement method, and instrument settings can affect the result. An abnormal reading should be verified and investigated against the relevant baseline and project criteria.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-fa54dba9\"><span class=\"ez-toc-section\" id=\"Why_are_factory_winding_resistance_results_important\"><\/span>Why are factory winding resistance results important?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-26e82427\">Factory results provide a documented baseline. Engineers can compare them with commissioning and maintenance readings when the same winding, terminals, tap position, and temperature conditions are considered.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-db5d2943\"><span class=\"ez-toc-section\" id=\"Should_every_tap_position_be_tested\"><\/span>Should every tap position be tested?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8c8dbe76\">The required positions depend on the transformer design, applicable standard, manufacturer\u2019s procedure, and project specification. Buyers should confirm the test scope before FAT.<\/p>\n\n\n\n<h3 class=\"wp-block-wd-title title wd-786bfc90\"><span class=\"ez-toc-section\" id=\"Can_winding_resistance_testing_identify_a_shorted_turn\"><\/span>Can winding resistance testing identify a shorted turn?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d7d9d876\">A winding resistance test alone may not reliably identify every shorted-turn condition. Engineers may need additional tests, such as a transformer turns ratio test or other diagnostic measurements, depending on the suspected issue.<\/p>\n\n\n\n<h2 class=\"wp-block-wd-title title wd-faef8e30\"><span class=\"ez-toc-section\" id=\"Discuss_Your_Transformer_Testing_Requirements_with_DHDL\"><\/span>Discuss Your Transformer Testing Requirements with DHDL<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-0830ccd2\">A useful winding resistance report should give your engineering team more than a pass or fail result. It should provide traceable measurements that can support future commissioning and maintenance decisions.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e98420c2\"><a href=\"https:\/\/dinghongtransformer.com\/fr\/\">Dinghong Transformer<\/a> supplies power and distribution transformers for industrial, utility, infrastructure, and renewable-energy applications.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f1d3bfc9\">If you are preparing a transformer RFQ, send us your capacity, voltage, frequency, installation conditions, applicable standard, and required test documents.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ff524760\"><strong>Email:<\/strong> <a href=\"mailto:service@dinghongtransformer.com\">service@dinghongtransformer.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Explore a product:<\/strong> <a href=\"https:\/\/dinghongtransformer.com\/fr\/produit\/66kv-high-voltage-oil-immersed-power-transformer\/?utm_source=chatgpt.com\">66 kV High-Voltage Oil-Immersed Power Transformer<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>A transformer winding resistance test can reveal problems that are difficult to identify from a visual inspection alone. An unusual<\/p>","protected":false},"author":2,"featured_media":38570,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-38568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-31T19:55:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-02T09:57:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"kai xin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"kai xin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/\"},\"author\":{\"name\":\"kai xin\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/e63997f0c2f46d2ded1f6754c89005bb\"},\"headline\":\"Transformer Winding Resistance Test: What the Results Tell Engineers\",\"datePublished\":\"2026-08-31T19:55:00+00:00\",\"dateModified\":\"2026-11-02T09:57:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/\"},\"wordCount\":2164,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/file_00000000445c81f4b0f2aa521ae2beb1-2.png\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/\",\"name\":\"Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/file_00000000445c81f4b0f2aa521ae2beb1-2.png\",\"datePublished\":\"2026-08-31T19:55:00+00:00\",\"dateModified\":\"2026-11-02T09:57:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/e63997f0c2f46d2ded1f6754c89005bb\"},\"description\":\"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/file_00000000445c81f4b0f2aa521ae2beb1-2.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/file_00000000445c81f4b0f2aa521ae2beb1-2.png\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/transformer-winding-resistance-test-what-the-results-tell-engineers\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transformer Winding Resistance Test: What the Results Tell Engineers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/e63997f0c2f46d2ded1f6754c89005bb\",\"name\":\"kai xin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g\",\"caption\":\"kai xin\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\\\/\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/fr\\\/author\\\/kaixin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer","description":"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/","og_locale":"fr_FR","og_type":"article","og_title":"Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer","og_description":"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.","og_url":"https:\/\/dinghongtransformer.com\/fr\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-08-31T19:55:00+00:00","article_modified_time":"2026-11-02T09:57:17+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png","type":"image\/png"}],"author":"kai xin","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"kai xin","Dur\u00e9e de lecture estim\u00e9e":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/"},"author":{"name":"kai xin","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/e63997f0c2f46d2ded1f6754c89005bb"},"headline":"Transformer Winding Resistance Test: What the Results Tell Engineers","datePublished":"2026-08-31T19:55:00+00:00","dateModified":"2026-11-02T09:57:17+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/"},"wordCount":2164,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png","articleSection":["Blog"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/","url":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/","name":"Transformer Winding Resistance Test: What the Results Tell Engineers - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png","datePublished":"2026-08-31T19:55:00+00:00","dateModified":"2026-11-02T09:57:17+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/e63997f0c2f46d2ded1f6754c89005bb"},"description":"Learn what transformer bushings are, how they work, the main types, common failure risks, maintenance requirements, and how to choose the right bushing.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/08\/file_00000000445c81f4b0f2aa521ae2beb1-2.png","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/transformer-winding-resistance-test-what-the-results-tell-engineers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Transformer Winding Resistance Test: What the Results Tell Engineers"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrique des transformateurs, des armoires de distribution haute et basse tension, des sous-stations pr\u00e9fabriqu\u00e9es, des armoires de stockage d'\u00e9nergie et des \u00e9quipements de recharge pour VE destin\u00e9s aux projets de services publics, industriels et d'\u00e9nergies nouvelles dans le monde entier.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/e63997f0c2f46d2ded1f6754c89005bb","name":"kai xin","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a505ff39ac3b707c24a6be2fbcc22075c0498732f5a9c687fcca08e66ea27711?s=96&d=mm&r=g","caption":"kai xin"},"sameAs":["https:\/\/dinghongtransformer.com\/"],"url":"https:\/\/dinghongtransformer.com\/fr\/author\/kaixin\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=38568"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38568\/revisions"}],"predecessor-version":[{"id":38954,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/posts\/38568\/revisions\/38954"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media\/38570"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=38568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=38568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=38568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}