{"id":37374,"date":"2026-07-05T13:00:04","date_gmt":"2026-07-05T13:00:04","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=37374"},"modified":"2026-08-31T07:20:15","modified_gmt":"2026-08-31T07:20:15","slug":"thailand-industrial-park-power-distribution-expansion-project","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/","title":{"rendered":"Thailand Industrial Park Power Distribution Expansion Project"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice de contenidos<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar tabla de contenidos\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#Thailand_Industrial_Park_Power_Distribution_Expansion_Project\" >Thailand Industrial Park Power Distribution Expansion Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#Project_Overview\" >Project Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#Tight_Delivery_Schedule\" >Tight Delivery Schedule<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#High-temperature_Environment\" >High-temperature Environment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#First_Direct_Purchase_from_China\" >First Direct Purchase from China<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#Need_a_Transformer_for_Your_Power_Distribution_Project\" >Need a Transformer for Your Power Distribution Project?<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-ba0f6780\"><span class=\"ez-toc-section\" id=\"Thailand_Industrial_Park_Power_Distribution_Expansion_Project\"><\/span>Thailand Industrial Park Power Distribution Expansion Project<br><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-03cd7c76\">In early 2025, DHDL successfully delivered one S-8000\/33 oil-immersed distribution transformer for a power distribution expansion project in an industrial park in eastern Thailand. The project helped the customer increase power supply capacity, improve distribution stability, and support the growing electricity demand of new factories and production lines.<\/p>\n\n\n\n<style>\n  .dhdl-project-overview {\n    --blue: #0b84d8;\n    --dark: #07142a;\n    --text: #334155;\n    --muted: #64748b;\n    --border: #e2edf7;\n    --soft: #f7f9fc;\n    font-family: inherit;\n    padding: 40px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-project-overview * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-project-overview-card {\n    background: var(--soft);\n    border: 1px solid var(--border);\n    border-radius: 26px;\n    padding: 32px 34px 34px;\n  }\n\n  .dhdl-project-overview-title {\n    font-size: 28px;\n    line-height: 1.25;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 28px;\n  }\n\n  .dhdl-project-table {\n    width: 100%;\n    border-collapse: separate;\n    border-spacing: 0;\n    overflow: hidden;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    background: #ffffff;\n  }\n\n  .dhdl-project-table tr:not(:last-child) td {\n    border-bottom: 1px solid var(--border);\n  }\n\n  .dhdl-project-table td {\n    padding: 20px 22px;\n    font-size: 16px;\n    line-height: 1.45;\n    vertical-align: middle;\n  }\n\n  .dhdl-project-table .label {\n    width: 21%;\n    background: #f0f5fb;\n    color: #64748b;\n    font-weight: 800;\n  }\n\n  .dhdl-project-table .value {\n    width: 29%;\n    background: #ffffff;\n    color: var(--dark);\n    font-weight: 900;\n  }\n\n  .dhdl-project-table .label:nth-child(3) {\n    border-left: 1px solid var(--border);\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-project-overview {\n      padding: 30px 0;\n    }\n\n    .dhdl-project-overview-card {\n      padding: 24px 18px;\n      border-radius: 20px;\n    }\n\n    .dhdl-project-overview-title {\n      font-size: 24px;\n      margin-bottom: 22px;\n    }\n\n    .dhdl-project-table,\n    .dhdl-project-table tbody,\n    .dhdl-project-table tr,\n    .dhdl-project-table td {\n      display: block;\n      width: 100%;\n    }\n\n    .dhdl-project-table tr:not(:last-child) td {\n      border-bottom: none;\n    }\n\n    .dhdl-project-table td {\n      padding: 13px 16px;\n    }\n\n    .dhdl-project-table .label {\n      width: 100%;\n      border-top: 1px solid var(--border);\n    }\n\n    .dhdl-project-table tr:first-child .label:first-child {\n      border-top: none;\n    }\n\n    .dhdl-project-table .value {\n      width: 100%;\n      border-bottom: 1px solid var(--border);\n    }\n\n    .dhdl-project-table .label:nth-child(3) {\n      border-left: none;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-project-overview\">\n  <div class=\"dhdl-project-overview-card\">\n\n    <h2 class=\"dhdl-project-overview-title\"><span class=\"ez-toc-section\" id=\"Project_Overview\"><\/span>Project Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n    <table class=\"dhdl-project-table\">\n      <tbody>\n        <tr>\n          <td class=\"label\">Country<\/td>\n          <td class=\"value\">Tailandia<\/td>\n          <td class=\"label\">Solicitud<\/td>\n          <td class=\"value\">Industrial Park Power Distribution<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Producto<\/td>\n          <td class=\"value\">Oil-immersed Distribution Transformer<\/td>\n          <td class=\"label\">Model<\/td>\n          <td class=\"value\">S-8000\/33<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Capacity<\/td>\n          <td class=\"value\">8000kVA<\/td>\n          <td class=\"label\">Voltage<\/td>\n          <td class=\"value\">33kV \/ 0.416kV<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Frecuencia<\/td>\n          <td class=\"value\">50Hz<\/td>\n          <td class=\"label\">M\u00e9todo de enfriamiento<\/td>\n          <td class=\"value\">On\u00e1n<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Instalaci\u00f3n<\/td>\n          <td class=\"value\">Outdoor Installation<\/td>\n          <td class=\"label\">Production &amp; Testing<\/td>\n          <td class=\"value\">38 Days<\/td>\n        <\/tr>\n      <\/tbody>\n    <\/table>\n\n  <\/div>\n<\/section>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"550\" height=\"399\" data-id=\"37316\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u56fe\u72471.png\" alt=\"\" class=\"wp-image-37316 lazyload\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u56fe\u72471.png 550w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u56fe\u72471-400x290.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u56fe\u72471-430x312.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u56fe\u72471-150x109.png 150w\" data-sizes=\"(max-width: 550px) 100vw, 550px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 550px; --smush-placeholder-aspect-ratio: 550\/399;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1067\" height=\"800\" data-id=\"37325\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-1067x800.jpg\" alt=\"\" class=\"wp-image-37325 lazyload\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-1067x800.jpg 1067w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-400x300.jpg 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-768x576.jpg 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-1536x1152.jpg 1536w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-430x323.jpg 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-700x525.jpg 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159-150x113.jpg 150w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260701190302_812_159.jpg 1920w\" data-sizes=\"(max-width: 1067px) 100vw, 1067px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1067px; --smush-placeholder-aspect-ratio: 1067\/800;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5d521aef\">Project Background<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1d8f0b01\">The customer is a Thai EPC contractor specializing in power engineering projects, including substation construction, industrial park distribution system upgrades, and power infrastructure improvement projects.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f3072d4f\">At the end of 2024, the customer undertook a power distribution expansion project for an industrial park in eastern Thailand. With the continuous growth of electronics manufacturing, automotive parts, and food processing industries in the region, the existing distribution system was approaching its designed capacity.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-20434b6a\">To meet the power demand for the next three to five years, the industrial park planned to add one 8000kVA distribution transformer to the existing 33kV power network. Since the project had already entered the construction stage, the equipment procurement schedule was tight.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3de8d962\">Customer Challenges<br><\/p>\n\n\n\n<div class=\"wp-block-wd-section wd-a807d94a\">\n<div class=\"wp-block-wd-row wd-c6ecf08d\">\n<div class=\"wp-block-wd-column wd-967ae739\">\n<div class=\"wp-block-wd-infobox wd-hover-parent wd-align wd-icon-top wd-15cb41c9\"><a class=\"wd-block-infobox-link wd-fill\" href=\"#\" aria-label=\"Infobox link\"><\/a>\n<div class=\"wp-block-wd-container wd-dir-col wd-9da9e709\">\n<h2 class=\"wp-block-wd-title title wd-align wd-36028171\"><span class=\"ez-toc-section\" id=\"Tight_Delivery_Schedule\"><\/span>Tight Delivery Schedule<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-align wd-446455ab\">The transformer had to be manufactured and shipped within 45 days to avoid delaying the substation energization plan.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-wd-column wd-17911984\">\n<div class=\"wp-block-wd-infobox wd-hover-parent wd-align wd-icon-top wd-464061e6\"><a class=\"wd-block-infobox-link wd-fill\" href=\"#\" aria-label=\"Infobox link\"><\/a>\n<div class=\"wp-block-wd-container wd-dir-col wd-47ca1b2f\">\n<h2 class=\"wp-block-wd-title title wd-96494212\"><span class=\"ez-toc-section\" id=\"High-temperature_Environment\"><\/span>High-temperature Environment<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-31aebaf1\">The site is located in a hot and humid area, with ambient temperatures often exceeding 40\u00b0C during the hottest months.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-wd-column wd-054c6191\">\n<div class=\"wp-block-wd-infobox wd-hover-parent wd-align wd-icon-top wd-2ad2b87e\"><a class=\"wd-block-infobox-link wd-fill\" href=\"#\" aria-label=\"Infobox link\"><\/a>\n<div class=\"wp-block-wd-container wd-dir-col wd-350b5337\">\n<h2 class=\"wp-block-wd-title title wd-389344ed\"><span class=\"ez-toc-section\" id=\"First_Direct_Purchase_from_China\"><\/span>First Direct Purchase from China<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-31a8eaa1\">The customer paid close attention to quality control, factory testing, delivery management, and after-sales response.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9288d277\">Why the Customer Chose DHDL<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b67ddaea\">During nearly three weeks of technical communication, the customer compared transformer suppliers from China, Vietnam, and Thailand. DHDL was finally selected because of its professional technical response, overseas project experience, transparent production process, and reliable delivery commitment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DHDL\u2019s engineering team responded to technical questions within 24 hours and provided optimized suggestions based on the actual project conditions. DHDL also shared the production schedule and quality control process, covering raw material preparation, winding, assembly, testing, and final inspection.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-70cef39e\">DHDL Solution<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5e7c7520\">For the high-temperature operating environment, DHDL optimized the heat dissipation design by adding fans to improve cooling performance. Higher-grade insulation materials were also selected to improve long-term reliability under continuous load operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During production, DHDL assigned a dedicated project manager to follow up the production schedule and provide weekly progress updates to the customer. This helped the customer monitor equipment status and coordinate the project schedule more effectively.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d557ff7f\">Factory Tests<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-c4ef3ead\">Before shipment, the transformer completed a full set of factory tests. After all test data was confirmed by the customer, DHDL arranged shipment.<br><\/p>\n\n\n\n<style>\n  .dhdl-test-items-section {\n    --blue: #0b84d8;\n    --dark: #07142a;\n    --text: #334155;\n    --border: #e2edf7;\n    --icon-bg: #eaf5ff;\n    font-family: inherit;\n    padding: 20px 0 28px;\n    color: var(--dark);\n  }\n\n  .dhdl-test-items-grid {\n    display: grid;\n    grid-template-columns: repeat(2, 1fr);\n    gap: 12px 16px;\n  }\n\n  .dhdl-test-item {\n    display: flex;\n    align-items: center;\n    gap: 10px;\n    background: #ffffff;\n    border: 1px solid var(--border);\n    border-radius: 12px;\n    padding: 12px 14px;\n    min-height: 52px;\n    color: var(--text);\n    font-size: 14px;\n    line-height: 1.35;\n    font-weight: 700;\n    box-shadow: 0 3px 10px rgba(15, 23, 42, 0.015);\n  }\n\n  .dhdl-test-item::before {\n    content: \"\u2713\";\n    width: 24px;\n    height: 24px;\n    border-radius: 50%;\n    background: var(--icon-bg);\n    color: var(--blue);\n    display: inline-flex;\n    align-items: center;\n    justify-content: center;\n    font-size: 14px;\n    font-weight: 900;\n    flex: 0 0 auto;\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-test-items-grid {\n      grid-template-columns: 1fr;\n      gap: 10px;\n    }\n\n    .dhdl-test-item {\n      font-size: 13px;\n      padding: 11px 13px;\n      min-height: 48px;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-test-items-section\">\n  <div class=\"dhdl-test-items-grid\">\n\n    <div class=\"dhdl-test-item\">Insulation Resistance Test<\/div>\n\n    <div class=\"dhdl-test-item\">Winding DC Resistance Test<\/div>\n\n    <div class=\"dhdl-test-item\">Voltage Ratio Test<\/div>\n\n    <div class=\"dhdl-test-item\">Vector Group Test<\/div>\n\n    <div class=\"dhdl-test-item\">No-load Loss and No-load Current Test<\/div>\n\n    <div class=\"dhdl-test-item\">Load Loss and Impedance Voltage Test<\/div>\n\n    <div class=\"dhdl-test-item\">Power Frequency Withstand Voltage Test<\/div>\n\n    <div class=\"dhdl-test-item\">Induced Withstand Voltage Test<\/div>\n\n    <div class=\"dhdl-test-item\">Sealing Test<\/div>\n\n  <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1ae0107c\">Delivery and Result<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e1db2519\">The production order was officially released in March 2025. From material preparation to final factory testing, the whole process took 38 days. After testing was completed, the transformer was shipped by sea to Laem Chabang Port in Thailand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project was completed five days earlier than the contractual delivery schedule. After the equipment arrived on site, it was successfully installed, energized, and put into operation.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-27cebdd0\"> After one month of operation, the customer reported that the transformer was running stably and all operating    parameters met the design requirements. The customer also recognized DHDL\u2019s communication efficiency, especially the regular production updates and test reports provided during project execution.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-696c96d2\">Follow-up Cooperation<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-478d5493\">After the successful commissioning of this project, the cooperation between both parties was further strengthened. In September of the same year, the customer contacted DHDL again for another industrial park power distribution upgrade project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The two parties later signed a second batch purchase intention, including 33kV distribution transformers and supporting high-voltage switchgear. The customer stated that DHDL would be given priority in future industrial park and infrastructure power projects in Thailand.<br><br><\/p>\n\n\n\n<div class=\"wp-block-wd-section color-scheme-light wd-22649c94\">\n<div class=\"wp-block-wd-container wd-dir-col wd-align wd-af67b972\">\n<h2 class=\"wp-block-wd-title title wd-c03b3cc3\"><span class=\"ez-toc-section\" id=\"Need_a_Transformer_for_Your_Power_Distribution_Project\"><\/span>Need a Transformer for Your Power Distribution Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e1c460c8 wd-custom-width\">Send us your capacity, voltage, quantity, application, and destination country. DHDL will help you confirm a suitable transformer solution.<\/p>\n\n\n\n<a class=\"wp-block-wd-button btn btn-style-default btn-color-primary btn-size-default btn-shape-semi-round wd-86d5f864\" href=\"#\"><span>ReQUEST A QUOTE<\/span><\/a>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.<\/p>","protected":false},"author":1,"featured_media":37378,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,101],"tags":[103],"class_list":["post-37374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-grid-distribution","tag-project"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-05T13:00:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-31T07:20:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Thailand Industrial Park Power Distribution Expansion Project\",\"datePublished\":\"2026-07-05T13:00:04+00:00\",\"dateModified\":\"2026-08-31T07:20:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/\"},\"wordCount\":695,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/thailand-project.png\",\"keywords\":[\"#project\"],\"articleSection\":[\"Blog\",\"Grid &amp; Distribution\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/\",\"name\":\"Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/thailand-project.png\",\"datePublished\":\"2026-07-05T13:00:04+00:00\",\"dateModified\":\"2026-08-31T07:20:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/thailand-project.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/thailand-project.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/thailand-industrial-park-power-distribution-expansion-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Thailand Industrial Park Power Distribution Expansion Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/es\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer","description":"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/","og_locale":"es_ES","og_type":"article","og_title":"Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer","og_description":"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.","og_url":"https:\/\/dinghongtransformer.com\/es\/blog\/thailand-industrial-park-power-distribution-expansion-project\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-07-05T13:00:04+00:00","article_modified_time":"2026-08-31T07:20:15+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"DHDL","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Thailand Industrial Park Power Distribution Expansion Project","datePublished":"2026-07-05T13:00:04+00:00","dateModified":"2026-08-31T07:20:15+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/"},"wordCount":695,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png","keywords":["#project"],"articleSection":["Blog","Grid &amp; Distribution"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/","url":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/","name":"Thailand Industrial Park Power Distribution Expansion Project - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png","datePublished":"2026-07-05T13:00:04+00:00","dateModified":"2026-08-31T07:20:15+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"See how DHDL delivered an 8000kVA, 33kV oil-immersed transformer for an industrial park power expansion project in hot and humid eastern Thailand.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/thailand-project.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/thailand-industrial-park-power-distribution-expansion-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Thailand Industrial Park Power Distribution Expansion Project"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrica transformadores, armarios de distribuci\u00f3n de alta y baja tensi\u00f3n, subestaciones prefabricadas, armarios de almacenamiento de energ\u00eda y equipos de carga para veh\u00edculos el\u00e9ctricos para proyectos de servicios p\u00fablicos, industriales y de nuevas energ\u00edas en todo el mundo.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/es\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/comments?post=37374"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37374\/revisions"}],"predecessor-version":[{"id":38558,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37374\/revisions\/38558"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media\/37378"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media?parent=37374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/categories?post=37374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/tags?post=37374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}