{"id":37370,"date":"2026-07-05T12:50:09","date_gmt":"2026-07-05T12:50:09","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=37370"},"modified":"2026-08-31T07:16:54","modified_gmt":"2026-08-31T07:16:54","slug":"ethiopia-amhara-rural-power-grid-upgrade-project","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/","title":{"rendered":"Ethiopia Amhara Rural Power Grid Upgrade Project"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice de contenidos<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar tabla de contenidos\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Ethiopia_Amhara_Rural_Power_Grid_Upgrade_Project\" >Ethiopia Amhara Rural Power Grid Upgrade Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Project_Overview\" >Project Overview<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#33kV_Distribution_Transformers\" >33kV Distribution Transformers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#15kV_Distribution_Transformers\" >15kV Distribution Transformers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Total_Supply_Scope\" >Total Supply Scope<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Project_Application\" >Project Application<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#High_Reliability_Requirement\" >High Reliability Requirement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Low-temperature_Environment\" >Low-temperature Environment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Tight_Delivery_Schedule\" >Tight Delivery Schedule<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#Need_a_Transformer_for_Your_Power_Distribution_Project\" >Need a Transformer for Your Power Distribution Project?<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-ba0f6780\"><span class=\"ez-toc-section\" id=\"Ethiopia_Amhara_Rural_Power_Grid_Upgrade_Project\"><\/span>Ethiopia Amhara Rural Power Grid Upgrade Project<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-03cd7c76\">As Ethiopia continues to promote rural electrification, several towns and villages in the Amhara Region needed to upgrade their existing distribution networks. A local power contractor launched a rural grid improvement project to expand electricity coverage, improve supply stability and support long-term regional development. DHDL supplied 160 distribution transformers for this project, with a total capacity of about 58MVA.<br><\/p>\n\n\n\n<style>\n  .dhdl-project-overview-et {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    --soft: #f7f9fc;\n    --label-bg: #f0f5fb;\n    font-family: inherit;\n    padding: 40px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-project-overview-et * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-project-overview-et-card {\n    background: var(--soft);\n    border: 1px solid var(--border);\n    border-radius: 24px;\n    padding: 32px 34px 34px;\n  }\n\n  .dhdl-project-overview-et-title {\n    font-size: 28px;\n    line-height: 1.25;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 28px;\n  }\n\n  .dhdl-project-overview-et-table {\n    width: 100%;\n    border-collapse: separate;\n    border-spacing: 0;\n    overflow: hidden;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    background: #ffffff;\n  }\n\n  .dhdl-project-overview-et-table tr:not(:last-child) td {\n    border-bottom: 1px solid var(--border);\n  }\n\n  .dhdl-project-overview-et-table td {\n    padding: 18px 20px;\n    font-size: 16px;\n    line-height: 1.45;\n    vertical-align: middle;\n  }\n\n  .dhdl-project-overview-et-table .label {\n    width: 22%;\n    background: var(--label-bg);\n    color: var(--muted);\n    font-weight: 800;\n  }\n\n  .dhdl-project-overview-et-table .value {\n    width: 28%;\n    background: #ffffff;\n    color: var(--dark);\n    font-weight: 900;\n  }\n\n  .dhdl-project-overview-et-table .label:nth-child(3) {\n    border-left: 1px solid var(--border);\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-project-overview-et {\n      padding: 30px 0;\n    }\n\n    .dhdl-project-overview-et-card {\n      padding: 24px 18px;\n      border-radius: 20px;\n    }\n\n    .dhdl-project-overview-et-title {\n      font-size: 24px;\n      margin-bottom: 22px;\n    }\n\n    .dhdl-project-overview-et-table,\n    .dhdl-project-overview-et-table tbody,\n    .dhdl-project-overview-et-table tr,\n    .dhdl-project-overview-et-table td {\n      display: block;\n      width: 100%;\n    }\n\n    .dhdl-project-overview-et-table tr:not(:last-child) td {\n      border-bottom: none;\n    }\n\n    .dhdl-project-overview-et-table td {\n      padding: 13px 16px;\n    }\n\n    .dhdl-project-overview-et-table .label {\n      width: 100%;\n      border-top: 1px solid var(--border);\n    }\n\n    .dhdl-project-overview-et-table tr:first-child .label:first-child {\n      border-top: none;\n    }\n\n    .dhdl-project-overview-et-table .value {\n      width: 100%;\n      border-bottom: 1px solid var(--border);\n    }\n\n    .dhdl-project-overview-et-table .label:nth-child(3) {\n      border-left: none;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-project-overview-et\">\n  <div class=\"dhdl-project-overview-et-card\">\n\n    <h2 class=\"dhdl-project-overview-et-title\"><span class=\"ez-toc-section\" id=\"Project_Overview\"><\/span>Project Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n    <table class=\"dhdl-project-overview-et-table\">\n      <tbody>\n        <tr>\n          <td class=\"label\">Location<\/td>\n          <td class=\"value\">Amhara Region, Ethiopia<\/td>\n          <td class=\"label\">Solicitud<\/td>\n          <td class=\"value\">Rural Power Grid Upgrade<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Coverage Area<\/td>\n          <td class=\"value\">32 Townships<\/td>\n          <td class=\"label\">Villages Covered<\/td>\n          <td class=\"value\">More than 80 Villages<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Line Voltage<\/td>\n          <td class=\"value\">15kV and 33kV<\/td>\n          <td class=\"label\">Distribution Lines<\/td>\n          <td class=\"value\">Over 400km<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Total Quantity<\/td>\n          <td class=\"value\">160 Distribution Transformers<\/td>\n          <td class=\"label\">Total Capacity<\/td>\n          <td class=\"value\">About 58MVA<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Delivery Mode<\/td>\n          <td class=\"value\">Three Batches<\/td>\n          <td class=\"label\">Project Result<\/td>\n          <td class=\"value\">All Equipment Delivered on Schedule<\/td>\n        <\/tr>\n      <\/tbody>\n    <\/table>\n\n  <\/div>\n<\/section>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"844\" height=\"1276\" data-id=\"37348\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project.png\" alt=\"\" class=\"wp-image-37348 lazyload\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project.png 844w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-198x300.png 198w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-529x800.png 529w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-768x1161.png 768w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-430x650.png 430w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-700x1058.png 700w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Ethiopia-Amhara-Rural-Power-Grid-Upgrade-Project-150x227.png 150w\" data-sizes=\"(max-width: 844px) 100vw, 844px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 844px; --smush-placeholder-aspect-ratio: 844\/1276;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5d521aef\">Project Background<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8972cebf\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-82f9698b\">Ethiopia has been continuously promoting rural electrification in recent years. In the Amhara Region, the existing distribution networks in multiple towns and villages could no longer fully meet local power supply needs.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-89ca9ef7\">To improve power access and enhance the stability of rural electricity supply, a local power contractor started a distribution network upgrade project covering 32 townships and more than 80 villages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project included the construction and renovation of 15kV and 33kV distribution lines, with a total length of more than 400 kilometers.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f604ae5b\">Products Used in This Project<\/p>\n\n\n\n<style>\n  .dhdl-equipment-et {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    font-family: inherit;\n    padding: 36px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-equipment-et * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-equipment-et-grid {\n    display: grid;\n    grid-template-columns: repeat(2, 1fr);\n    gap: 22px 26px;\n  }\n\n  .dhdl-equipment-et-card {\n    background: #ffffff;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    padding: 26px 30px;\n    min-height: 210px;\n  }\n\n  .dhdl-equipment-et-card h3 {\n    font-size: 21px;\n    line-height: 1.35;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 18px;\n  }\n\n  .dhdl-equipment-et-card ul {\n    margin: 0;\n    padding-left: 22px;\n  }\n\n  .dhdl-equipment-et-card li {\n    font-size: 16px;\n    line-height: 1.75;\n    color: var(--muted);\n    margin: 0 0 7px;\n  }\n\n  .dhdl-equipment-et-card li::marker {\n    color: var(--muted);\n    font-size: 0.9em;\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-equipment-et {\n      padding: 28px 0;\n    }\n\n    .dhdl-equipment-et-grid {\n      grid-template-columns: 1fr;\n      gap: 16px;\n    }\n\n    .dhdl-equipment-et-card {\n      padding: 22px 20px;\n      min-height: auto;\n    }\n\n    .dhdl-equipment-et-card h3 {\n      font-size: 19px;\n      margin-bottom: 14px;\n    }\n\n    .dhdl-equipment-et-card li {\n      font-size: 14px;\n      line-height: 1.65;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-equipment-et\">\n  <div class=\"dhdl-equipment-et-grid\">\n\n    <div class=\"dhdl-equipment-et-card\">\n      <h3><span class=\"ez-toc-section\" id=\"33kV_Distribution_Transformers\"><\/span>33kV Distribution Transformers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>Model: S-200\/33 \u2014 20 units<\/li>\n        <li>Model: S-315\/33 \u2014 25 units<\/li>\n        <li>Model: S-500\/33 \u2014 31 units<\/li>\n        <li>Application: 33kV rural distribution network upgrade<\/li>\n      <\/ul>\n    <\/div>\n\n    <div class=\"dhdl-equipment-et-card\">\n      <h3><span class=\"ez-toc-section\" id=\"15kV_Distribution_Transformers\"><\/span>15kV Distribution Transformers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>Model: S-200\/15 \u2014 33 units<\/li>\n        <li>Model: S-315\/15 \u2014 16 units<\/li>\n        <li>Model: S-500\/15 \u2014 35 units<\/li>\n        <li>Application: 15kV village-level distribution network improvement<\/li>\n      <\/ul>\n    <\/div>\n\n    <div class=\"dhdl-equipment-et-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Total_Supply_Scope\"><\/span>Total Supply Scope<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>Total Quantity: 160 units<\/li>\n        <li>Total Capacity: About 58MVA<\/li>\n        <li>Voltage Classes: 15kV and 33kV<\/li>\n        <li>Product Type: Oil-immersed distribution transformers<\/li>\n      <\/ul>\n    <\/div>\n\n    <div class=\"dhdl-equipment-et-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Project_Application\"><\/span>Project Application<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>Rural electrification improvement<\/li>\n        <li>Township distribution network upgrade<\/li>\n        <li>Village power supply stabilization<\/li>\n        <li>Power supply for dispersed installation sites<\/li>\n      <\/ul>\n    <\/div>\n\n  <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3de8d962\">Customer Challenges<\/p>\n\n\n\n<style>\n  .dhdl-challenges-v3 {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    font-family: inherit;\n    padding: 36px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-challenges-v3 * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-challenges-v3-grid {\n    display: grid;\n    grid-template-columns: repeat(3, 1fr);\n    gap: 22px;\n  }\n\n  .dhdl-challenges-v3-card {\n    background: #ffffff;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    padding: 26px 28px;\n    min-height: 235px;\n  }\n\n  .dhdl-challenges-v3-card h3 {\n    font-size: 21px;\n    line-height: 1.35;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 18px;\n  }\n\n  .dhdl-challenges-v3-card p {\n    font-size: 16px;\n    line-height: 1.78;\n    color: var(--muted);\n    margin: 0;\n  }\n\n  @media (max-width: 1024px) {\n    .dhdl-challenges-v3-grid {\n      grid-template-columns: repeat(2, 1fr);\n    }\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-challenges-v3 {\n      padding: 28px 0;\n    }\n\n    .dhdl-challenges-v3-grid {\n      grid-template-columns: 1fr;\n      gap: 16px;\n    }\n\n    .dhdl-challenges-v3-card {\n      padding: 22px 20px;\n      min-height: auto;\n    }\n\n    .dhdl-challenges-v3-card h3 {\n      font-size: 19px;\n      margin-bottom: 12px;\n    }\n\n    .dhdl-challenges-v3-card p {\n      font-size: 14px;\n      line-height: 1.7;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-challenges-v3\">\n  <div class=\"dhdl-challenges-v3-grid\">\n\n    <div class=\"dhdl-challenges-v3-card\">\n      <h3><span class=\"ez-toc-section\" id=\"High_Reliability_Requirement\"><\/span>High Reliability Requirement<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        For data centers, even a brief power interruption may cause service disruption\n        and business loss. The power distribution system needed to support continuous\n        24\/7 operation.\n      <\/p>\n    <\/div>\n\n    <div class=\"dhdl-challenges-v3-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Low-temperature_Environment\"><\/span>Low-temperature Environment<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        Harbin\u2019s winter temperature can approach \u221230\u00b0C. The equipment had to meet\n        stable operation requirements under severe cold conditions.\n      <\/p>\n    <\/div>\n\n    <div class=\"dhdl-challenges-v3-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Tight_Delivery_Schedule\"><\/span>Tight Delivery Schedule<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        The customer required equipment delivery within a short project cycle to ensure\n        the Phase I computing center expansion could be energized on schedule.\n      <\/p>\n    <\/div>\n\n  <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9288d277\">Why the Customer Chose DHDL<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3873dc2e\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e6b2b695\">The customer focused mainly on product reliability, batch delivery capability and export project experience. Since the project required a large quantity of distribution transformers, the supplier needed to complete production planning, quality control and shipment coordination in batches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DHDL was able to complete the production plan for all 160 units and provide export packaging and shipment support. This made DHDL the final supplier for the project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-70cef39e\">DHDL Solution<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7c3a4f15\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fddf45ae\">To handle transportation challenges in mountainous and remote areas, DHDL optimized the packaging structure and used reinforced wooden cases to improve protection during long-distance transport and site handling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To improve equipment adaptability under local grid voltage fluctuations, DHDL optimized the winding design and strengthened the transformer structure to support stable operation in rural distribution networks.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-759b7cf2\">Delivery Timeline<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7abfc0df\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8e58b0df\">The project was delivered in three batches. The first batch of 60 units was completed in 35 days. The second batch of 50 units was completed in 52 days. The third batch of 50 units was completed in 65 days.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">All equipment was delivered according to the project schedule, helping the customer keep the rural distribution network upgrade plan on track.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8a2a11de\">Customer Feedback<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ebfa7e92\">After the project was energized, stable power supply was achieved in multiple towns and villages. The transformers operated well, and the equipment failure rate remained low. The customer recognized DHDL\u2019s product reliability and batch delivery performance.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d557ff7f\">Follow-up Cooperation<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-14a1bba7\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3ca1287e\">After the completion of this project, the customer continued cooperation with DHDL in the following year. The customer purchased another 20 units of S-630\/33 transformers and 15 units of S-1000\/15 transformers for new grid construction projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This follow-up order further strengthened DHDL\u2019s cooperation with the customer in Ethiopia\u2019s rural power grid and electrification projects.<\/p>\n\n\n\n<div class=\"wp-block-wd-section color-scheme-light wd-22649c94\">\n<div class=\"wp-block-wd-container wd-dir-col wd-align wd-af67b972\">\n<h2 class=\"wp-block-wd-title title wd-c03b3cc3\"><span class=\"ez-toc-section\" id=\"Need_a_Transformer_for_Your_Power_Distribution_Project\"><\/span>Need a Transformer for Your Power Distribution Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e1c460c8 wd-custom-width\">Send us your capacity, voltage, quantity, application, and destination country. DHDL will help you confirm a suitable transformer solution.<\/p>\n\n\n\n<a class=\"wp-block-wd-button btn btn-style-default btn-color-primary btn-size-default btn-shape-semi-round wd-86d5f864\" href=\"#\"><span>ReQUEST A QUOTE<\/span><\/a>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.<\/p>","protected":false},"author":1,"featured_media":37383,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,101],"tags":[103],"class_list":["post-37370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-grid-distribution","tag-project"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-05T12:50:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-31T07:16:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Ethiopia Amhara Rural Power Grid Upgrade Project\",\"datePublished\":\"2026-07-05T12:50:09+00:00\",\"dateModified\":\"2026-08-31T07:16:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/\"},\"wordCount\":667,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/amhara-project.png\",\"keywords\":[\"#project\"],\"articleSection\":[\"Blog\",\"Grid &amp; Distribution\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/\",\"name\":\"Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/amhara-project.png\",\"datePublished\":\"2026-07-05T12:50:09+00:00\",\"dateModified\":\"2026-08-31T07:16:54+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/amhara-project.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/amhara-project.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/ethiopia-amhara-rural-power-grid-upgrade-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ethiopia Amhara Rural Power Grid Upgrade Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/es\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer","description":"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/","og_locale":"es_ES","og_type":"article","og_title":"Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer","og_description":"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.","og_url":"https:\/\/dinghongtransformer.com\/es\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-07-05T12:50:09+00:00","article_modified_time":"2026-08-31T07:16:54+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"DHDL","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Ethiopia Amhara Rural Power Grid Upgrade Project","datePublished":"2026-07-05T12:50:09+00:00","dateModified":"2026-08-31T07:16:54+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/"},"wordCount":667,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png","keywords":["#project"],"articleSection":["Blog","Grid &amp; Distribution"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/","url":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/","name":"Ethiopia Amhara Rural Power Grid Upgrade Project - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png","datePublished":"2026-07-05T12:50:09+00:00","dateModified":"2026-08-31T07:16:54+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"See how DHDL supplied 160 oil-immersed 15kV and 33kV distribution transformers totaling 58MVA for a rural grid upgrade across Ethiopia\u2019s Amhara Region.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/amhara-project.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/ethiopia-amhara-rural-power-grid-upgrade-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Ethiopia Amhara Rural Power Grid Upgrade Project"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrica transformadores, armarios de distribuci\u00f3n de alta y baja tensi\u00f3n, subestaciones prefabricadas, armarios de almacenamiento de energ\u00eda y equipos de carga para veh\u00edculos el\u00e9ctricos para proyectos de servicios p\u00fablicos, industriales y de nuevas energ\u00edas en todo el mundo.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/es\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/comments?post=37370"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37370\/revisions"}],"predecessor-version":[{"id":38555,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37370\/revisions\/38555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media\/37383"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media?parent=37370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/categories?post=37370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/tags?post=37370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}