{"id":37366,"date":"2026-07-05T12:45:57","date_gmt":"2026-07-05T12:45:57","guid":{"rendered":"https:\/\/dinghongtransformer.com\/?p=37366"},"modified":"2026-08-31T07:08:38","modified_gmt":"2026-08-31T07:08:38","slug":"uzbekistan-tashkent-textile-industrial-park-substation-expansion-project","status":"publish","type":"post","link":"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/","title":{"rendered":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u00cdndice de contenidos<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Alternar tabla de contenidos\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Alternar<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Uzbekistan_Tashkent_Textile_Industrial_Park_Substation_Expansion_Project\" >Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Project_Overview\" >Project Overview<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Main_Power_Transformer\" >Main Power Transformer<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Project_Application\" >Project Application<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Fast_Industrial_Park_Expansion\" >Fast Industrial Park Expansion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#High-temperature_Operation\" >High-temperature Operation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Delivery_within_70_Days\" >Delivery within 70 Days<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#Need_a_Transformer_for_Your_Power_Distribution_Project\" >Need a Transformer for Your Power Distribution Project?<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-wd-title title wd-ba0f6780\"><span class=\"ez-toc-section\" id=\"Uzbekistan_Tashkent_Textile_Industrial_Park_Substation_Expansion_Project\"><\/span>Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-03cd7c76\">As Uzbekistan continues to promote textile industry upgrading, a textile industrial park in the Tashkent Region added multiple new spinning and weaving workshops. Due to the increasing production load and insufficient existing power supply capacity, the customer launched a 110kV substation expansion project. DHDL supplied one OSFZ-40000\/110 main transformer to support the industrial park\u2019s growing power demand.<\/p>\n\n\n\n<style>\n  .dhdl-project-overview-uz {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    --soft: #f7f9fc;\n    --label-bg: #f0f5fb;\n    font-family: inherit;\n    padding: 40px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-project-overview-uz * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-project-overview-uz-card {\n    background: var(--soft);\n    border: 1px solid var(--border);\n    border-radius: 24px;\n    padding: 32px 34px 34px;\n  }\n\n  .dhdl-project-overview-uz-title {\n    font-size: 28px;\n    line-height: 1.25;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 28px;\n  }\n\n  .dhdl-project-overview-uz-table {\n    width: 100%;\n    border-collapse: separate;\n    border-spacing: 0;\n    overflow: hidden;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    background: #ffffff;\n  }\n\n  .dhdl-project-overview-uz-table tr:not(:last-child) td {\n    border-bottom: 1px solid var(--border);\n  }\n\n  .dhdl-project-overview-uz-table td {\n    padding: 18px 20px;\n    font-size: 16px;\n    line-height: 1.45;\n    vertical-align: middle;\n  }\n\n  .dhdl-project-overview-uz-table .label {\n    width: 22%;\n    background: var(--label-bg);\n    color: var(--muted);\n    font-weight: 800;\n  }\n\n  .dhdl-project-overview-uz-table .value {\n    width: 28%;\n    background: #ffffff;\n    color: var(--dark);\n    font-weight: 900;\n  }\n\n  .dhdl-project-overview-uz-table .label:nth-child(3) {\n    border-left: 1px solid var(--border);\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-project-overview-uz {\n      padding: 30px 0;\n    }\n\n    .dhdl-project-overview-uz-card {\n      padding: 24px 18px;\n      border-radius: 20px;\n    }\n\n    .dhdl-project-overview-uz-title {\n      font-size: 24px;\n      margin-bottom: 22px;\n    }\n\n    .dhdl-project-overview-uz-table,\n    .dhdl-project-overview-uz-table tbody,\n    .dhdl-project-overview-uz-table tr,\n    .dhdl-project-overview-uz-table td {\n      display: block;\n      width: 100%;\n    }\n\n    .dhdl-project-overview-uz-table tr:not(:last-child) td {\n      border-bottom: none;\n    }\n\n    .dhdl-project-overview-uz-table td {\n      padding: 13px 16px;\n    }\n\n    .dhdl-project-overview-uz-table .label {\n      width: 100%;\n      border-top: 1px solid var(--border);\n    }\n\n    .dhdl-project-overview-uz-table tr:first-child .label:first-child {\n      border-top: none;\n    }\n\n    .dhdl-project-overview-uz-table .value {\n      width: 100%;\n      border-bottom: 1px solid var(--border);\n    }\n\n    .dhdl-project-overview-uz-table .label:nth-child(3) {\n      border-left: none;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-project-overview-uz\">\n  <div class=\"dhdl-project-overview-uz-card\">\n\n    <h2 class=\"dhdl-project-overview-uz-title\"><span class=\"ez-toc-section\" id=\"Project_Overview\"><\/span>Project Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n    <table class=\"dhdl-project-overview-uz-table\">\n      <tbody>\n        <tr>\n          <td class=\"label\">Location<\/td>\n          <td class=\"value\">Tashkent Region, Uzbekistan<\/td>\n          <td class=\"label\">Solicitud<\/td>\n          <td class=\"value\">Textile Industrial Park Substation<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Industrial Park Area<\/td>\n          <td class=\"value\">135 Hectares<\/td>\n          <td class=\"label\">New Enterprises<\/td>\n          <td class=\"value\">More than 20 Companies<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Estimated New Load<\/td>\n          <td class=\"value\">35MW<\/td>\n          <td class=\"label\">Main Transformer<\/td>\n          <td class=\"value\">OSFZ-40000\/110<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Capacidad nominal<\/td>\n          <td class=\"value\">40000kVA<\/td>\n          <td class=\"label\">Voltage Level<\/td>\n          <td class=\"value\">110kV \/ 35kV<\/td>\n        <\/tr>\n\n        <tr>\n          <td class=\"label\">Production Cycle<\/td>\n          <td class=\"value\">62 Days<\/td>\n          <td class=\"label\">Transportation Cycle<\/td>\n          <td class=\"value\">28 Days<\/td>\n        <\/tr>\n      <\/tbody>\n    <\/table>\n\n  <\/div>\n<\/section>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"417\" height=\"313\" data-id=\"37342\" data-src=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Uzbekistan-Tashkent-Textile-Industrial-Park-Substation-Expansion-Project.png\" alt=\"\" class=\"wp-image-37342 lazyload\" data-srcset=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Uzbekistan-Tashkent-Textile-Industrial-Park-Substation-Expansion-Project.png 417w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Uzbekistan-Tashkent-Textile-Industrial-Park-Substation-Expansion-Project-400x300.png 400w, https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/Uzbekistan-Tashkent-Textile-Industrial-Park-Substation-Expansion-Project-150x113.png 150w\" data-sizes=\"(max-width: 417px) 100vw, 417px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 417px; --smush-placeholder-aspect-ratio: 417\/313;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-5d521aef\">Project Background<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-bc736cf1\">Uzbekistan has been steadily upgrading its textile manufacturing industry in recent years. In the Tashkent Region, the textile industrial park introduced several new spinning and weaving workshops to expand production capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As more companies entered the park, the original power supply capacity became insufficient for the growing production load. To ensure stable power supply for the new workshops and future expansion, the customer started a 110kV substation expansion project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-f604ae5b\">Products Used in This Project<\/p>\n\n\n\n<style>\n  .dhdl-equipment-uz {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    font-family: inherit;\n    padding: 36px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-equipment-uz * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-equipment-uz-grid {\n    display: grid;\n    grid-template-columns: repeat(2, 1fr);\n    gap: 26px;\n  }\n\n  .dhdl-equipment-uz-card {\n    background: #ffffff;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    padding: 26px 30px;\n    min-height: 250px;\n  }\n\n  .dhdl-equipment-uz-card h3 {\n    font-size: 21px;\n    line-height: 1.35;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 18px;\n  }\n\n  .dhdl-equipment-uz-card ul {\n    margin: 0;\n    padding-left: 22px;\n  }\n\n  .dhdl-equipment-uz-card li {\n    font-size: 16px;\n    line-height: 1.75;\n    color: var(--muted);\n    margin: 0 0 7px;\n  }\n\n  .dhdl-equipment-uz-card li::marker {\n    color: var(--muted);\n    font-size: 0.9em;\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-equipment-uz {\n      padding: 28px 0;\n    }\n\n    .dhdl-equipment-uz-grid {\n      grid-template-columns: 1fr;\n      gap: 16px;\n    }\n\n    .dhdl-equipment-uz-card {\n      padding: 22px 20px;\n      min-height: auto;\n    }\n\n    .dhdl-equipment-uz-card h3 {\n      font-size: 19px;\n      margin-bottom: 14px;\n    }\n\n    .dhdl-equipment-uz-card li {\n      font-size: 14px;\n      line-height: 1.65;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-equipment-uz\">\n  <div class=\"dhdl-equipment-uz-grid\">\n\n    <div class=\"dhdl-equipment-uz-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Main_Power_Transformer\"><\/span>Main Power Transformer<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>Model: OSFZ-40000\/110<\/li>\n        <li>Quantity: 1 unit<\/li>\n        <li>Rated Capacity: 40000kVA<\/li>\n        <li>Voltage Level: 110kV \/ 35kV<\/li>\n        <li>Tap Changer: On-load tap changer<\/li>\n        <li>Cooling Method: ONAN \/ ONAF<\/li>\n      <\/ul>\n    <\/div>\n\n    <div class=\"dhdl-equipment-uz-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Project_Application\"><\/span>Project Application<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <ul>\n        <li>110kV substation expansion<\/li>\n        <li>Power supply for spinning workshops<\/li>\n        <li>Power supply for weaving production lines<\/li>\n        <li>Industrial park capacity expansion<\/li>\n        <li>Long-term full-load operation support<\/li>\n      <\/ul>\n    <\/div>\n\n  <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3de8d962\">Customer Challenges<\/p>\n\n\n\n<style>\n  .dhdl-challenges-uz {\n    --dark: #07142a;\n    --muted: #64748b;\n    --border: #e2edf7;\n    font-family: inherit;\n    padding: 36px 0;\n    color: var(--dark);\n  }\n\n  .dhdl-challenges-uz * {\n    box-sizing: border-box;\n  }\n\n  .dhdl-challenges-uz-grid {\n    display: grid;\n    grid-template-columns: repeat(3, 1fr);\n    gap: 22px;\n  }\n\n  .dhdl-challenges-uz-card {\n    background: #ffffff;\n    border: 1px solid var(--border);\n    border-radius: 18px;\n    padding: 26px 28px;\n    min-height: 230px;\n  }\n\n  .dhdl-challenges-uz-card h3 {\n    font-size: 21px;\n    line-height: 1.35;\n    font-weight: 900;\n    color: var(--dark);\n    margin: 0 0 18px;\n  }\n\n  .dhdl-challenges-uz-card p {\n    font-size: 16px;\n    line-height: 1.78;\n    color: var(--muted);\n    margin: 0;\n  }\n\n  @media (max-width: 1024px) {\n    .dhdl-challenges-uz-grid {\n      grid-template-columns: repeat(2, 1fr);\n    }\n  }\n\n  @media (max-width: 768px) {\n    .dhdl-challenges-uz {\n      padding: 28px 0;\n    }\n\n    .dhdl-challenges-uz-grid {\n      grid-template-columns: 1fr;\n      gap: 16px;\n    }\n\n    .dhdl-challenges-uz-card {\n      padding: 22px 20px;\n      min-height: auto;\n    }\n\n    .dhdl-challenges-uz-card h3 {\n      font-size: 19px;\n      margin-bottom: 12px;\n    }\n\n    .dhdl-challenges-uz-card p {\n      font-size: 14px;\n      line-height: 1.7;\n    }\n  }\n<\/style>\n\n<section class=\"dhdl-challenges-uz\">\n  <div class=\"dhdl-challenges-uz-grid\">\n\n    <div class=\"dhdl-challenges-uz-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Fast_Industrial_Park_Expansion\"><\/span>Fast Industrial Park Expansion<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        The textile industrial park was expanding quickly, while the power supply\n        system construction was lagging behind the growing production demand.\n      <\/p>\n    <\/div>\n\n    <div class=\"dhdl-challenges-uz-card\">\n      <h3><span class=\"ez-toc-section\" id=\"High-temperature_Operation\"><\/span>High-temperature Operation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        Local summer temperatures can reach 45\u00b0C. The transformer needed to operate\n        reliably under high ambient temperature and long-term full-load conditions.\n      <\/p>\n    <\/div>\n\n    <div class=\"dhdl-challenges-uz-card\">\n      <h3><span class=\"ez-toc-section\" id=\"Delivery_within_70_Days\"><\/span>Delivery within 70 Days<span class=\"ez-toc-section-end\"><\/span><\/h3>\n      <p>\n        The customer required the transformer delivery period to be no more than\n        70 days to keep the substation expansion project on schedule.\n      <\/p>\n    <\/div>\n\n  <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-9288d277\">Why the Customer Chose DHDL<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-3873dc2e\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-fd64f722\">The customer contacted DHDL through a local engineering consultant. After comparing DHDL with several European-brand suppliers, the customer found that DHDL could provide a shorter delivery time, faster technical response and a more reasonable procurement cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DHDL\u2019s engineering team also provided technical suggestions based on the project\u2019s local operating environment, helping the customer improve equipment adaptability and reduce project execution risk.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-70cef39e\">DHDL Solution<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7c3a4f15\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ba9fd72c\">To meet the long-term full-load operation requirement, DHDL used high-permeability silicon steel sheets and optimized the winding design to improve transformer efficiency and reduce losses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To improve operation under high ambient temperature, DHDL enhanced the heat dissipation performance of the transformer and adopted ONAN \/ ONAF cooling. Considering the dusty local environment, additional anti-corrosion and sealing design measures were added to improve outdoor reliability.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-759b7cf2\">Delivery Timeline<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-7abfc0df\"><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-6d6fe739\">The transformer production cycle was completed within 62 days. After factory inspection and shipment preparation, the transformer was transported to Uzbekistan, with a transportation cycle of 28 days.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The equipment successfully arrived in Tashkent and was delivered to the project site for substation installation and commissioning.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-8a2a11de\">Customer Feedback<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ebfa7e92\">After commissioning, the main transformer operated stably. During peak load periods, the temperature rise remained well controlled, and the overall operation met the project requirements. The project owner recognized DHDL\u2019s product performance and project support.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d557ff7f\">Follow-up Cooperation<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ce58fef2\">After the successful completion of this project, the customer placed another order with DHDL for 20 units of S11-2500\/35 distribution transformers. These transformers will be used for the subsequent supporting power distribution facilities in the industrial park.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This follow-up cooperation further strengthened DHDL\u2019s position as a reliable transformer supplier for textile industrial park and industrial power distribution projects in Central Asia.<\/p>\n\n\n\n<div class=\"wp-block-wd-section color-scheme-light wd-22649c94\">\n<div class=\"wp-block-wd-container wd-dir-col wd-align wd-af67b972\">\n<h2 class=\"wp-block-wd-title title wd-c03b3cc3\"><span class=\"ez-toc-section\" id=\"Need_a_Transformer_for_Your_Power_Distribution_Project\"><\/span>Need a Transformer for Your Power Distribution Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e1c460c8 wd-custom-width\">Send us your capacity, voltage, quantity, application, and destination country. DHDL will help you confirm a suitable transformer solution.<\/p>\n\n\n\n<a class=\"wp-block-wd-button btn btn-style-default btn-color-primary btn-size-default btn-shape-semi-round wd-86d5f864\" href=\"#\"><span>ReQUEST A QUOTE<\/span><\/a>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.<\/p>","protected":false},"author":1,"featured_media":37381,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,98],"tags":[103],"class_list":["post-37366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-industrial-power-projects","tag-project"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer<\/title>\n<meta name=\"description\" content=\"See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer\" \/>\n<meta property=\"og:description\" content=\"See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Dinghongtransformer\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-05T12:45:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-31T07:08:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DHDL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"DHDL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/\"},\"author\":{\"name\":\"DHDL\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"headline\":\"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project\",\"datePublished\":\"2026-07-05T12:45:57+00:00\",\"dateModified\":\"2026-08-31T07:08:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/\"},\"wordCount\":620,\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/tashkent-project.png\",\"keywords\":[\"#project\"],\"articleSection\":[\"Blog\",\"Industrial Power Projects\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/\",\"name\":\"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/tashkent-project.png\",\"datePublished\":\"2026-07-05T12:45:57+00:00\",\"dateModified\":\"2026-08-31T07:08:38+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\"},\"description\":\"See how DHDL supplied a 40,000kVA 110\\\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/tashkent-project.png\",\"contentUrl\":\"https:\\\/\\\/dinghongtransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/tashkent-project.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/blog\\\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dinghongtransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/\",\"name\":\"Dinghongtransformer\",\"description\":\"DHDL manufactures transformers, high and low voltage distribution cabinets, prefabricated substations, energy storage cabinets and EV charging equipment for utility, industrial and new energy projects worldwide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dinghongtransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dinghongtransformer.com\\\/#\\\/schema\\\/person\\\/ec72b31766e0deb89de63f40cc2d928b\",\"name\":\"DHDL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g\",\"caption\":\"DHDL\"},\"sameAs\":[\"https:\\\/\\\/dinghongtransformer.com\"],\"url\":\"https:\\\/\\\/dinghongtransformer.com\\\/es\\\/author\\\/zixuw678\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer","description":"See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/","og_locale":"es_ES","og_type":"article","og_title":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer","og_description":"See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.","og_url":"https:\/\/dinghongtransformer.com\/es\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/","og_site_name":"Dinghongtransformer","article_published_time":"2026-07-05T12:45:57+00:00","article_modified_time":"2026-08-31T07:08:38+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png","type":"image\/png"}],"author":"DHDL","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"DHDL","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#article","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/"},"author":{"name":"DHDL","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"headline":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project","datePublished":"2026-07-05T12:45:57+00:00","dateModified":"2026-08-31T07:08:38+00:00","mainEntityOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/"},"wordCount":620,"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png","keywords":["#project"],"articleSection":["Blog","Industrial Power Projects"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/","url":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/","name":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project - Dinghongtransformer","isPartOf":{"@id":"https:\/\/dinghongtransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#primaryimage"},"image":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#primaryimage"},"thumbnailUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png","datePublished":"2026-07-05T12:45:57+00:00","dateModified":"2026-08-31T07:08:38+00:00","author":{"@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b"},"description":"See how DHDL supplied a 40,000kVA 110\/35kV main transformer for a textile industrial park substation expansion in Tashkent Region, Uzbekistan.","breadcrumb":{"@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#primaryimage","url":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png","contentUrl":"https:\/\/dinghongtransformer.com\/wp-content\/uploads\/2026\/07\/tashkent-project.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/dinghongtransformer.com\/blog\/uzbekistan-tashkent-textile-industrial-park-substation-expansion-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dinghongtransformer.com\/"},{"@type":"ListItem","position":2,"name":"Uzbekistan Tashkent Textile Industrial Park Substation Expansion Project"}]},{"@type":"WebSite","@id":"https:\/\/dinghongtransformer.com\/#website","url":"https:\/\/dinghongtransformer.com\/","name":"Dinghongtransformer","description":"DHDL fabrica transformadores, armarios de distribuci\u00f3n de alta y baja tensi\u00f3n, subestaciones prefabricadas, armarios de almacenamiento de energ\u00eda y equipos de carga para veh\u00edculos el\u00e9ctricos para proyectos de servicios p\u00fablicos, industriales y de nuevas energ\u00edas en todo el mundo.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dinghongtransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/dinghongtransformer.com\/#\/schema\/person\/ec72b31766e0deb89de63f40cc2d928b","name":"DHDL","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef47d8f06ebee34ccc3410265ee2a5dc31eefa858fe01ff145c8f57f1d6e60dc?s=96&d=mm&r=g","caption":"DHDL"},"sameAs":["https:\/\/dinghongtransformer.com"],"url":"https:\/\/dinghongtransformer.com\/es\/author\/zixuw678\/"}]}},"_links":{"self":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/comments?post=37366"}],"version-history":[{"count":2,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37366\/revisions"}],"predecessor-version":[{"id":38553,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/posts\/37366\/revisions\/38553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media\/37381"}],"wp:attachment":[{"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/media?parent=37366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/categories?post=37366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dinghongtransformer.com\/es\/wp-json\/wp\/v2\/tags?post=37366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}